Traditional Culture Encyclopedia - Hotel accommodation - Analyze what issues the hotel feasibility report focuses on.

Analyze what issues the hotel feasibility report focuses on.

Refer to what others wrote.

Feasibility Study Report on Hotel Project of Prospective Industry Research Institute

1.2. 1 steps of long-term feasibility study

1.2.2 Basic contents of feasibility study of hotel project

(1) project name

(2) background of project construction

(3) Project undertaker

(4) Land for project construction

(5) Project construction period

(6) Content and scale of project construction

(7) Project development and construction mode

(8) Basis for compiling the feasibility study report of the hotel.

1.2.3 Expected conclusion of feasibility study of hotel project

(1) the conclusion of the policy feasibility study of the prospective project.

(2) The conclusion of the feasibility study of the prospective product scheme.

(three) the feasibility study conclusion of the proposed site

(4) Forward-looking conclusion of feasibility study of process technology.

(5) the feasibility study conclusion of the prospective equipment scheme.

(6) the feasibility study conclusion of the prospective project scheme.

(seven) the conclusion of the feasibility study of the expected economic benefits.

(8) The conclusion of feasibility study on expected social benefits.

(9) the expected environmental impact feasibility study conclusion

Chapter two: Analysis and forecast of the hotel market.

2. 1 Scope of products or services involved in the hotel project.

2.2 Forward-looking market analysis of hotel industry

2.2. 1 analysis of policy, economy, technology and social environment

2.2.2 Analysis of Hotel Market Scale

2.2.3 Hotel profitability analysis

2.2.4 Hotel Market Competition Analysis

2.2.5 Analysis of Hotel Entry Barriers

2.3 Hotel Market Foresight Forecast

Chapter 3: Analysis of hotel project construction site.

3. 1 hotel project location status

3. 1. 1 geographical location of the project.

3. 1.2 Land right category of the project construction site

3. 1.3 Land use status of the project construction site

3.2 Hotel project site construction conditions

3.2. 1 Topography, landform and earthquake situation of the project construction site

3.2.2 Engineering Geology and Hydrogeology of the Project Construction Site

3.2.3 Economic conditions of the project construction site

3.2.4 Traffic conditions of the project construction site

3.2.5 Public facilities at the project construction site

3.2.6 Flood control, moisture-proof and drainage facilities at the project construction site

3.2.7 Legal support conditions of the project construction site

3.2.8 Climatic conditions of the project construction site

3.2.9 Natural resource conditions of the project construction site

3.2. Population status of the10 project.

3.3 Hotel project construction conditions comparison

3.3. 1 Comparison of project construction conditions

3.3.2 Comparison of Project Construction Investment

3.3.3 Comparison of project operating expenses

3.3.4 Project recommended site selection scheme

3.3.5 Location map of the project site

Chapter four: technical scheme, equipment scheme and engineering scheme of hotel project.

4. 1 technical scheme of hotel project

4. 1. 1 project production method

4. 1.2 project process

4. 1.3 technical sources of the project

4. 1.4 process flow chart of recommended scheme

4.2 Hotel Project Equipment Scheme

4.2. 1 Selection of main equipment for the project

4.2.2 Main equipment sources of the project

4.2.3 Main equipment of recommended scheme

4.3 Hotel Project Plan

4.3. 1 Project construction content

4.3.2 Special foundation engineering scheme of this project

4.3.3 Project Construction Scale

4.3.4 Project Construction and Installation Quantity Estimation

4.3.5 List of major construction projects of the project

Chapter 5: Analysis of energy-saving scheme of hotel projects.

5. 1 Analysis of energy-saving policies and regulations

5. 1. 1 Energy-saving Policy Analysis

5. 1.2 Analysis of Energy Saving Code

5.2 hotel project energy consumption analysis

5.2. 1 Energy supply status of the hotel project location

5.2.2 Energy consumption analysis of hotel projects

5.3 Analysis of energy-saving objectives and measures of hotel projects

5.3. 1 project energy saving target

5.3.2 Measures to save heat energy

Power saving measures

5.3.4 Water saving measures

5.4 hotel project energy saving effect analysis

5.4. 1 Energy saving effect of equipment

5.4.2 Building energy-saving effect

Chapter VI: Environmental protection analysis of hotel projects.

6. 1 Environmental conditions of hotel project construction site

6.2 Major Pollution Sources and Pollutants of Hotel Project

6.2. 1 Analysis of main pollution sources of the project

6.2.2 Analysis of main pollutants in the project

6.3 Environmental protection measures for hotel projects

6.3. 1 air pollution prevention and control measures

6.3.2 Noise pollution prevention and control measures

6.3.3 Water pollution prevention and control measures

6.3.4 Prevention and control measures of solid waste pollution

6.3.5 Greening measures

6.4 Environmental Protection Investment Budget

6.5 Environmental Impact Assessment and Analysis

6.6 Geological disasters and special environmental impacts

6.6. 1 Geological disasters at the hotel project construction site

6.6.2 Risk of geological disasters caused by hotel projects

6.6.3 Geological disaster prevention measures

6.6.4 Special environmental impact and protection measures

Chapter VII: Labor Safety and Fire Protection of Hotel Projects

7. 1 Compilation basis and implementation standard

7. 1. 1 project compilation basis

7. 1.2 project execution standard

7.2 Risk factors and hazard degree

7.2. 1 Main parts with potential safety hazards and their hazard degree

7.2.2 Types and harm degree of harmful substances

7.3 Forward-looking security measures scheme

7.3. 1 process and equipment safety selection measures

7.3.2 Protective measures for dangerous operations

7.3.3 Protective measures for dangerous places

7.4 Prospective fire prevention measures

Fire hazard analysis

7.4.2 Forward-looking fire control facilities scheme

Chapter 8: Hotel project organizational structure and human resource allocation.

8. 1 hotel project organization structure

8. 1. 1 project legal person establishment plan

8. 1.2 Organizational structure of project management organization

8.2 Hotel project human resource allocation

8.2. 1 Project personnel

8.2.2 Staff Source and Recruitment Scheme

Staff training plan

Wages and benefits

Chapter 9: Analysis of hotel project implementation progress.

9. 1 hotel project implementation schedule

Establishment of project management organization

9. 1.2 project financing arrangement

9. 1.3 Project Technology Acquisition and Transfer

9. 1.4 engineering survey and design

9. 1.5 project equipment order

9. 1.6 project construction preparation

9. 1.7 project completion acceptance

9.2 hotel project implementation schedule

Chapter 10: Investment Budget and Financing Scheme of Hotel Project

10. 1 hotel project investment budget

10. 1. 1 total project investment

10. 1.2 Investment in fixed assets

10. 1.3 liquidity

10.2 hotel project financing scheme

10.2. 1 project fund raising

10.2.2 project debt financing

10.2.3 project financing scheme analysis

Chapter 1 1: financial evaluation and analysis of hotel projects

1 1. 1 Basis and scope of financial evaluation

11.1.1financial evaluation basis

1 1. 1.2 scope and methods of financial evaluation

1 1.2 Forward-looking estimation of sales revenue of hotel projects

1 1.2. 1 production scale of products

1 1.2.2 Project implementation progress

1 1.2.3 New sales revenue, value-added tax and additional estimates

1 1.3 Forward-looking estimation of operating cost and total cost of hotel project.

1 1.3. 1 Basic data of cost estimation

1 1.3.2 Annual Total Cost Estimation

1 1.3.3 year operating cost estimation

1 1.4 Analysis of financial profitability

1 1.4. 1 total profit and distribution

1 1.4.2 cash flow analysis

1 1.4.3 investment benefit analysis

1 1.5 financial liquidity analysis

1 1.6 financial feasibility analysis

1 1.7 uncertainty analysis

Breakeven analysis of 1 1.7. 1

Sensitivity analysis of 1 1.7.2

1 1.8 main data and indicators of financial evaluation

Chapter 12: Prospective evaluation and analysis of social benefits and risks of hotel projects.

12. 1

12.2 hotel project risk outlook

12.2. 1 qualitative risk analysis of the project

12.2.2 project risk prevention measures

Chapter 13: attached drawings, schedules and annexes

I suggest you consult an expert before making a decision.