Traditional Culture Encyclopedia - Hotel accommodation - Decision of Qingdao Municipal People's Government on Amending 27 government regulations, such as the Measures for the Implementation of Qingdao Civil Air Defense Project Management and Charging.

Decision of Qingdao Municipal People's Government on Amending 27 government regulations, such as the Measures for the Implementation of Qingdao Civil Air Defense Project Management and Charging.

First, Qingdao usually use civil air defense engineering management and charging implementation measures

The first paragraph of Article 4 is amended as: "The peacetime use of civil air defense works shall be under unified leadership and managed at different levels. Renting civil air defense projects shall be audited in accordance with the provisions, openly rented, and signed a lease contract for state-owned assets; If it involves special matters such as confidentiality and national security, it can be rented by other means upon approval. " Two, Qingdao hotel industry security management rules

(1) Article 6 is amended as: "To start a hotel, one shall apply to the district (city) public security organ for a special trade license before opening. In line with the prescribed conditions, the public security organ shall grant permission within five working days from the date of accepting the application; If the license is not granted, the reasons for not granting the license shall be informed in writing. "

(2) Amend Article 11 to read: "Hotels must register to receive passengers. At the time of registration, the passenger's identity documents shall be checked and truthfully registered according to the prescribed items. Reception of overseas personnel accommodation, but also should register their nationality (region) and other information. The registered information shall be submitted to the public security organ in real time through the hotel security management information system. "

(3) Article 12 is amended as: "Hotels shall ensure the normal operation of the front desk equipment of the public security management information system of the hotel industry. If it is impossible to register or upload the information of accommodation personnel due to system failure, relevant information shall be registered in the passenger accommodation register and submitted to the public security organ within eight hours. "

(four) by deleting the third paragraph of article seventeenth.

(5) Article 24 is amended as: "Hotels and their staff shall report to the public security organ immediately if they find any of the following circumstances:

"(a) lodging personnel refused to provide identity documents, falsely used other people's identity documents, used forged or altered identity documents, or could not distinguish the types and authenticity of identity documents of overseas lodging personnel;

"(2) Carrying dangerous goods, prohibited items, stolen goods or suspected stolen goods notified by public security organs;

"(3) The lodger is a criminal suspect or a wanted person;

"(4) A criminal or public security case has occurred in the hotel."

(6) Article 25 is amended as: "Anyone who violates the relevant provisions of these Rules and should be punished in accordance with the provisions of the Law of People's Republic of China (PRC) on Public Security Administration Punishment shall be punished by the public security organ according to law; If the circumstances are serious, criminal responsibility shall be investigated according to law. "

(seven) delete twenty-sixth and twenty-seventh.

(8) One article is added as Article 26: "Any serviced apartment, farmhouse, fisherman's banquet, etc.". If accommodation is provided to the outside world, residents shall be registered in accordance with the provisions of this Detailed Rules for the Administration of Accommodation Registration, and relevant information of residents shall be reported to the local police station. " Three, Qingdao water permit system implementation measures

(1) Paragraph 1 of Article 11 is amended as: "Water intake units and individuals shall install metering facilities at water intakes in accordance with national technical standards to ensure the normal operation of metering facilities."

(2) Article 14 is amended as: "If water intake is stopped for two consecutive years, the original water intake examination and approval authority shall cancel the water intake permit. If the water intake has been stopped for two years due to force majeure or major technological transformation, and the validity period of the water intake permit is not full, the water intake permit may be retained with the consent of the original water intake examination and approval authority. " Four, Qingdao city sculpture planning and management measures

(1) Article 1 is amended as: "In order to strengthen the planning and management of urban sculpture installations, these Measures are formulated in accordance with the relevant provisions of the Urban and Rural Planning Law of People's Republic of China (PRC) and the actual situation of this Municipality."

(2) Article 3 is amended as: "These Measures shall be observed in setting up outdoor sculptures within the planned area of this Municipality."

(3) Amend Article 4 to read: "The topic selection of urban sculpture adheres to the people-centered creative orientation, promotes socialist core values, and does not violate laws and regulations or social ethics. Urban sculpture should achieve the unity of content and art, and coordinate with the surrounding environment and architectural style. "

(4) Paragraph 2 of Article 5 is amended as: "The planning and management departments of county-level cities, districts and economic functional zones shall be specifically responsible for the planning and management of urban sculptures within their respective jurisdictions in accordance with the provisions of these Measures."

(5) Article 6 is amended as: "The installation of urban sculptures (including temporary sculptures, the same below) in Shinan District, Shibei District and Licang District shall be subject to the approval of the planning administrative department of Qingdao Municipality. Setting up urban sculptures in other districts (cities) shall be examined and approved by the local planning administrative department and reported to the Qingdao planning administrative department for the record. However, the installation of large-scale urban sculptures in major public places should be reported to the planning and management department of Qingdao for approval. "

(6) Article 7 is amended as: "When applying for a planning permit for urban sculpture construction projects, an urban sculpture setting unit shall submit relevant documents of land use, construction project design scheme and other materials. The design scheme shall include the following contents:

"(1) the plan layout of 1: 500 or 1: 200;

"(two) sculpture model or design renderings (there should be four pictures for a round sculpture);

"(three) the sculpture supporting environmental design drawings;

"(four) description of the means of production and technical process plan;

"(5) Description of the design theme;

"(6) Basic information about the author."

(7) Paragraph 1 of Article 8 is amended as: "If the documents and materials specified in Article 7 are examined by the planning administrative department and conform to the relevant provisions and urban planning, they shall be approved and issued with a planning permit for construction projects."

(8) Article 10 is amended as: "The urban sculpture setting unit shall carry out the construction according to the urban sculpture design scheme approved by the planning management department, and shall not change the design scheme without authorization."

(nine) by deleting the second paragraph of article eleventh.

(10) Article 12 is amended as: "Those who violate the relevant provisions of these Measures shall be punished by the planning administrative department in accordance with the laws and regulations on urban and rural planning."

(eleven) by deleting thirteenth, fourteenth, fifteenth and seventeenth.