Traditional Culture Encyclopedia - Hotel accommodation - When will Wuhu Chaohu Expressway be repaired?

When will Wuhu Chaohu Expressway be repaired?

S 18 ninghe, S48 Ye He expressway (huaitong expressway-Hanshan boundary) and other projects form G4022 Hu Rong expressway double track, which is planned to be two-way and six-lane, with a subgrade width of 34.5m and a design speed of120km/h, with the starting point planned to connect with S 19 huaitong expressway and the ending point with ninghe. It is planned to start construction in 2023 and be completed in 2027. The starting point is Xiage Interchange of Mingchao Expressway, and the end point is the eastward extension of wuyue Expressway. The total length of the route is 33.8 kilometers, 27.5 kilometers in Hefei and 6.3 kilometers in Wuhu. It is planned to start construction in 2022 and be completed in 2025. At present, the feasibility study of S 18 Ninghe and S48 Ye He expressway (Huaitong expressway-Hanshan boundary section) and the design consultation project of S 1 1 Huang Chao expressway Hefu-Wuwei (Shi Jian) section have been invited for bidding. These key high-speed projects have been approved by the provincial government and included in the scope of expressway Network Planning Revision (2020-2035).