What are the precautions in the process of interior decoration demolition?
A, interior decoration demolition process
1. The general process of indoor demolition and reconstruction project is top-down demolition. We all know that the noise and dust pollution produced in the process of demolition are serious, so it is particularly important to arrange the demolition sequence of each process reasonably. In addition, to strictly implement the top-down working procedure, it is required to close the external window before removing the indoor ceiling and partition wall. In order to prevent noise and dust from overflowing and protect the surrounding environment from pollution, the specific engineering sequence is indoor door demolition → lamps demolition → ceiling demolition → partition wall demolition → latex paint project → partition project → ceiling project.
2. When the roof, wall and floor are demolished, gypsum board and aluminum gusset ceiling shall be demolished in an orderly manner. When the partition wall is demolished, it is forbidden to dig or push it down. We should dismantle it piece by piece by hand. Before the lamps are removed, the water and electricity professional workers cut off the water and electricity master gate and remove the sanitary ware, lamps and radiators. Before the lamps and lanterns are dismantled, the thread ends should be wrapped with insulating tape to prevent leakage. When the door and door cover are removed, the carpenter will remove the wooden door and curtain rod with a screwdriver, and then remove the door cover with a crowbar.
3. The materials and accessories of gypsum board partition wall project are light steel keel main parts: 75mm vertical main keel, horizontal through keel, along the top keel and along the ground keel; Light steel skeleton fittings: support card, cato, corner brace, connecting piece, fixing piece, wall-attached keel, etc. Fastening materials: nails, expansion bolts, galvanized self-tapping screws, wood screws and adhesive caulking materials. 3000 12009mm gypsum board.
Second, what are the precautions for interior decoration demolition?
1, time
Because we will make a lot of noise when we demolish the interior decoration, our construction time should not be carried out on holidays, and we should try to carry out the decoration within working days so as not to affect others.
2. Protect public facilities
When demolishing houses, we may use public facilities such as elevators. When using the elevator, some plywood can be used to protect the elevator room, and some pearl boards and fine sand can be laid in the corridor between the elevator and the door to protect the floor.
3. Pay attention to the reserved items in the room
When we demolish the interior decoration of the house, if some large pieces of furniture are difficult to move out, we can wrap them with some bubble paper. Don't leave household appliances such as lamps indoors. Put them back when finished.
4. Pay attention to the pipeline during disassembly.
Before construction, it is necessary to determine where to dismantle, mark the marks and dimensions with chalk, and mark the location of concealed works as far as possible to avoid damage during construction. During the construction period, the water source, power main switch and alarm should also be turned off.
5. The load-bearing wall cannot be removed.
When carrying out interior decoration, don't dismantle the walls that bear the weight of the house, such as load-bearing walls and load-bearing columns, so as not to destroy the structure of the house and affect the safety of the house.
6, garbage clear in time
When carrying out indoor decoration and renovation, it is necessary to make clear which materials can be kept, recyclable and non-recyclable materials should be stacked separately, and the garbage we removed should be cleaned up in time to avoid that too much garbage in the corridor can't get through, and the garbage can't be thrown out of the window, which is likely to cause the danger of throwing things at high altitude. When dismantling, the recyclable materials should be taken out as completely as possible.
The above is the interior decoration demolition process that Bian Xiao shared for you. What is the relevant knowledge about the matters needing attention in interior decoration demolition? I hope it helps you. Want to know more about the demolition of interior decoration, please continue to pay attention.
- Previous article:Changle is a relatively high-end hotel.
- Next article:Is there any delicious restaurant in Haimen?
- Related articles
- What does it mean if a man and a woman are having an affair and then they are rolling sheets?
- Is there a five-star hotel in Guangyuan? What's its name?
- What is the tallest hotel building in the world: 1, Burj Khalifa 2, Zifeng Tower 3, Royal Bell Tower Hotel Mecca 4, Eiffel.
- Where is the address of Lin Jing Tianzhu in Longhu, Guiyang?
- Ancient Merchant‖The failed business between Jiang Ziya and the Shang Dynasty
- Which province is Guangzhou?
- Which airport is Shanghai Jing 'an Kunlun Hotel near?
- How much does it cost to take a taxi from the South Campus of Shenyang Conservatory of Music to Tesco in Huanggu District?
- Intermediary booking hotel
- How to complain and pay compensation if the hotel decoration is too noisy?