Traditional Culture Encyclopedia - Hotel accommodation - Installation process of hotel furniture How to install hotel furniture
Installation process of hotel furniture How to install hotel furniture
1. Key points for door cover installation
1. Before assembling the door cover, it is necessary to spread pearl cotton and protective film on the ground to prevent the paint surface of the door cover from being scratched during the assembly process. Connect the horizontal frame and mullion frame of the door cover firmly and fix them with T50 straight gun nails. The gaps between the cover panels should be tight, flat, and free of misalignment; the connection between the vertical frame and the horizontal frame should be at a 90-degree angle. The diagonal line of the door cover and the verticality of the front and side installation of the cover line must meet the operating requirements of the company's specifications.
2. If the wall cavity does not have a wood base layer, the wood base layer should be made first.
2. Key points for door cover wire installation
1. Before installing the door cover wire, you should first clean up the foreign matter inside the slot of the cover plate. When cleaning, pay attention to the corners of the slot. Destroy it, then apply nail-free glue on the door cover line and install it into the slot of the door cover (frame).
2. The door cover line adopts a 45° angle. The interface should be kept smooth and tight, and the splicing should be natural and smooth without misalignment. When cutting the sleeve line at a 45° angle, be careful to prevent edge explosion.
3. Apply nail-free glue to the contact area between the door cover line and the wall. The nail-free adhesive is applied by dots. The distance between the two points should not exceed 25cm to ensure that the door cover line and the wall are firmly combined. If the nail-free adhesive is exposed, it should be removed promptly. Door Industry Vision, your friend!
4. The cover wire fixed on the cover board should be as close to the wall as possible; due to the non-vertical wall or uneven thickness, there will be a gap between the door cover wire and the wall. Please ask the decoration company to close the gap in time, and It is prohibited to nail nails on the front of the set.
3. Key points for door leaf installation
1. Open the corresponding door leaf packaging and check whether the size, color, and opening direction of the door leaf meet the size, color, and opening direction required by the production workbook. Check whether there are bumps, indentations, scratches, or mispackaging in various parts, and whether the hardware that needs to be installed is correct and complete.
2. Distinguish the upper and lower openings of the door leaf. During installation, the bottom of the door leaf needs to be padded with pearl cotton and cannot directly touch the ground. The installation must ensure that the door gap distance is 3 mm at the top and 7 at the bottom, and 3mm on the left and right.
3. Adjust the hinges to the best condition to ensure that the door leaves can be opened easily, without friction, open and close flexibly, and the door leaves are flat and vertical. After the door leaves are closed tightly, the sealing strips are tightly combined and do not swing. During the trimming process of the hinge grooves on the door leaf and door frame, the paint on the surface of the door leaf and door cover must not be damaged. When installing hinge screws, you should first guide the holes, and then use a screwdriver to screw in the screws. Install the screws in the positive cross direction.
4. Check the height difference between the door frame and the door frame and the door frame line; whether the height difference between the door leaf and the door frame, and between the leaf and the leaf meets the size requirements; whether the door leaf and the upper frame, side frame, Whether the gap between the floors meets the required dimensions. After installing the door frame, check the verticality of the door frame and the squareness of the upper and lower door frames to facilitate the installation of the door leaf.
5. Install the lock to the corresponding position according to the provided lock. After the lock is installed, check whether the door leaf and door lock switch are flexible and whether there is jitter. If necessary, adjust the lock position in time. The door catch must be installed firmly and cannot be loose. The handle should be installed vertically without tilt, and the hinge should be installed firmly.
- Previous article:It's too noisy to live next door to the hotel. Can I call the police?
- Next article:How to get from Shanghai to Xi 'an by car?
- Related articles
- How about Maoming Jinke Jimei Fenghua? OK or not? Is it worth buying?
- How to pronounce record
- Nothing more than 30 Wang Manni's mate selection criteria: an annual salary of 2 million, interesting and handsome. Is she worth it?
- Can I ask for a refund if the hotel loses power?
- How to get to Xianyang Red Star Wharf Resort by car from People's Hospital?
- What is spring like in Yahe? OK or not? Is it worth buying?
- How to get from the railway station to Harbin Xinston Hot Spring Hotel?
- What is the quality of Compson snow tires?
- Geographical transportation of Shennong Manor Hotel in Beijing
- Is there any pressure to leave the city where you have lived for a long time and go to Beijing and Shanghai for development?