Traditional Culture Encyclopedia - Hotel accommodation - Cabinet customization process
Cabinet customization process
Sign the purchase order and pay the deposit in advance.
Sign the purchase order and pay the deposit in advance.
Door-to-door measurement and designer drawing.
On-site measurement, the designer will draw a cabinet design drawing and a kitchen water and electricity transformation drawing to confirm the final cabinet design drawing.
The first payment of the contract is the advance payment.
Sign the first contract, sign the detailed supply contract, and pay in advance.
Arrange delivery and installation
Schedule delivery and installation.
Pay off the balance after acceptance.
Acceptance, after the installation of cabinets, customers conduct a comprehensive inspection of the whole set of cabinets, and pay off the balance after acceptance.
- Previous article:Shenzhen Guanlan takes the first bus to Bagualing Yinhu Colorful City Hotel.
- Next article:Round bed in the hotel
- Related articles
- Pingyang Happy Hotel
- What are the characteristics of Qingdao?
- Can I go to a hotel on the night of the Chinese Ghost Festival? Can I go to a hotel on the night of the Chinese Ghost Festival?
- What are the specialties of the college?
- How many stars is Bo Jue Hotel Tongxiang?
- Chivalrous swordsman love 2 introduction
- Which hotel in Zhucheng is open during the Spring Festival?
- Evaluation of cherry blossom bath in Tianjin
- How to get to Days Hotel Zheng Jin from Shijiazhuang Railway Station?
- How about Yi and Shi Sheng? OK or not? Is it worth buying?