There are several installation methods of aluminum veneer ceiling, which we will introduce in detail.

Installation preparation of aluminum veneer ceiling

Check the construction drawings and measured dimensions in detail to ensure the perfection of design and processing. At the same time, carefully check with the structural node diagram, find out the inconsistent parts, and modify the design as soon as possible. Check whether the keel quality meets the requirements of the drawings. The installation of keel meets the requirements of design specification. Connecting bolts for installing longitudinal keels shall not be omitted.

In order to ensure the installation accuracy of the plate, theodolite should be used to connect the vertical frame members of the beam, and the deformation joints, settlement joints and variable cross sections should be properly handled to meet the use requirements. The material and machining geometry of metal fittings must meet the design requirements, and the material must have the factory certificate and retest report. The connection between the connector and the vertical keel shall be reliable, and the spring pad shall not be omitted.

Aluminum plate installation steps

Clean the indoor side of aluminum plate and the surface of column frame with detergent. The whole aluminum plate is connected with the keel through aluminum corner yards (lifting lugs) around it and fixed on the keel. Fixing method, if it is built-in seamless splicing, you can use an electric drill to turn over the hole at the corresponding position on the keel, and then rivet it with a flat (countersunk) aluminum pull nail; If it is a plate with glue seams outside, steel screws (also called flange screws or phoenix nails, see figure) can be used to directly drill into the keel fixing aluminum plate through the connecting hole of aluminum angle code, but attention should be paid to controlling the tightness of the drill bit and adjusting the aluminum plate.

The aluminum plate enters the site for trial assembly. Fix the aluminum plate on the keel slightly first, pay attention to the control of installation accuracy, and then tighten it after adjusting the plate. When installing aluminum plates, they should be installed on the wall in turn according to the number of aluminum plates. Aluminum plate installation starts from the front, large area and corner, and is installed from top to bottom. The connection between aluminum plate and keel shall conform to the requirements of drawings, firm and reliable, and bolts shall not be used less. The connection structure, upper and lower seals and deformation joints of curtain wall corners and surrounding walls should meet the design requirements.

Triangular suspended ceiling aluminum veneer