Traditional Culture Encyclopedia - Hotel accommodation - Installation steps and precautions of Domady spring

Installation steps and precautions of Domady spring

Now our living standard has improved rapidly. Many people moved from the countryside to the cities, bought their own houses after struggle, and then needed to decorate our houses. First, we need to decorate our doors and locks. I don't know if you have heard of floor springs. Many hotels and apartments are equipped with floor springs, which are actually door closers, which have played a very good anti-theft role. Domadi Spring is one of the brands. Today, let's get to know Thomas with Bian Xiao.

1. Determine the slotting position: firstly, take out the ground spring body and put it in the predetermined installation position. At this time, take a vertical line from the center of the top axis of the ground spring, then move the position of the ground spring, so that the center of the lead pituitary gland is located at the center marked position of the flat axis of the ground spring, and pay attention to the four directions of the ground spring, namely, transverse, front, back, left and right, and then draw the outline of the ground spring body.

2. Slotting: cut the edge of the contour area of the ground spring into notches with a depth of about 3-5 mm with an angle grinder, and then dig out the ground material in the contour area of the ground spring with an electric hammer or a hand chisel, which can be used repeatedly. Use chisels for details, electric hammers for larger materials, and angle grinders for edges. At the same time, measure the groove depth of the ground spring, and it can be used when it is close to the thickness size.

3. Stabilize the ground spring body: When the ground spring body can be completely put into the geosyncline, the step of stabilizing the ground spring body can be carried out, but cement can also be used, but it takes a long time to set. Take out the ground spring body, add an appropriate amount of fast dry powder into the geosyncline, add water and stir until the viscosity is appropriate, then put it into the ground spring body, and knock the ground spring with a rubber hammer or a wooden block to make the surface of the ground spring flush with the surrounding ground. Then use the plumb line to find the axis position of the ground spring, and fine-tune the ground spring body.

Precautions for installation:

Slot size is moderate, neither too big nor too small, too big will affect the appearance, too small will lead to unstable materials and weak fixation. The axial position of the grounding spring must be accurate, and a plumb line or other tools must be used to find the vertical line.

The installation steps and precautions of Sodoma floor spring have been told to you in detail. I believe you already know that ground springs have many applications in life. Like those big places, ground springs are generally installed. So it is necessary to suggest that you can understand and master the installation method of floor spring, because we may use it one day. It's always good to be prepared in advance. It is good for you to learn more useful knowledge from your life at ordinary times.

Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~