The process of architectural design
1. Understand the planning of local cities in the next 5- 10 years, predict the hotel development demand in 5- 10 years, and make a set of forward-looking architectural design.
2. At this stage, the grade and category of the building, the name and functional layout of each service item, and the proportion of each building area are mainly determined.
Second, the architectural scheme renderings stage
According to the previous floor plan and conceptual scheme, design the architectural scheme effect diagram, and submit the aerial view effect diagram of the overall planning of the building and the perspective effect diagram of the single building. ?
Third, the architectural scheme design stage
Integrate the preliminary architectural scheme design and the stage design of architectural renderings, and integrate a complete set of architectural master plan scheme design atlas.
Fourth, the construction drawing stage
1. Through the communication with Party A and the analysis of the actual situation of the project, the owner is required to provide relevant technical data and on-site inspection, and the construction drawing is designed according to the design data and design requirements provided by the owner.
2. In order to ensure that each design scheme can be well implemented and coordinated in the construction process, and ensure the engineering quality within the scheduled time limit. After the completion of the construction drawing design, the designer must carefully review the drawings, find the defects of the drawings in time, and make timely modifications.
3. The project leader and the scheme designer should attend the blue prints.the design in time, know their cooperation with other professions and site construction in advance, clarify the technological process, construction scheme, technical measures and matters needing attention, and make technical disclosure. In accordance with the requirements of the "Trinity" system, make technical disclosure records, and file them after being signed by relevant personnel.
4. Organize professionals to seriously complete design changes caused by design, or design changes caused by reasonable suggestions put forward by customers and construction parties, or design changes caused by force majeure, and summarize these changes into valuable quality information, making them an example for our company to improve and improve the design level and quality.
The design of extended information architecture means that before the building is completed, designers make a comprehensive conception of the existing or possible problems in the building process and use process according to the building tasks, draw up solutions and schemes for these problems, and express them in the form of drawings and documents. As the basis of material preparation, construction organization and cooperation of various types of work in production and construction. The general provisions are as follows:
1. The design of assembled monolithic buildings should meet the requirements of current national architectural design standards and codes and the requirements of relevant standards and codes for fire prevention, waterproof, energy saving, sound insulation, earthquake resistance and safety precautions, and conform to the design principles of applicability, economy and beauty. At the same time, it should meet the requirements of building industrialization and green building.
2. The design of the assembled integrated building should standardize and serialize the basic units, connecting structures, components, fittings and equipment pipelines, adopt the principle of fewer specifications and more combinations, and combine diverse architectural forms.
3. The specifications and types of all kinds of prefabricated components, interior decoration systems and equipment piping systems selected in the design of assembled integrated buildings should meet the requirements of building standards and building functions, and adapt to the flexibility and variability of the main functional space of the building.
4. Assembled integral buildings with seismic design requirements shall conform to the principles of seismic design in terms of architectural appearance, layout and structure.
5. Assembled single building should adopt the integrated design of civil engineering, decoration and equipment. At the same time, the indoor decoration and equipment installation construction organization plan is effectively combined with the main structure construction plan, so as to achieve synchronous design and synchronous construction, so as to shorten the construction period.
6. The construction drawing design documents of the prefabricated integral building shall be complete, and the processing drawing of prefabricated components shall comprehensively and accurately reflect the specifications, models, processing dimensions and connection forms of prefabricated components.
References:
Baidu encyclopedia-architectural design
- Related articles
- /kloc-how about the money for staying in the hotel before 0/2 o'clock?
- Where is it convenient for Jiaxing Tongxiang Puyuan to live?
- Format of site application report
- Don't look too messy in the palace.
- Is there a direct bus from Qingtian to Wenzhou Airport? urgent
- Do I have to pay for Chili oil on hotel sheets?
- Are the drainage pipe and sewage pipe the same pipe?
- Shangri-La Hotel Ningbo
- How to get to Jiutian Fashion Hotel from Zhengzhou West Railway Station to Huayuan Road by bus?
- Slogan of comprehensive improvement of small town environment: big dream of small town