Traditional Culture Encyclopedia - Hotel accommodation - Three preliminary verification reports

Three preliminary verification reports

Part 1

(1) Overall situation

The development of tourism resources is insufficient, the construction of tourist attractions (spots) lags behind, and tourism products are weak, scattered and small. Low attractiveness has become a bottleneck restricting the development of tourism in Jieyang. In order to solve this main contradiction, in recent years, our city's tourism industry has closely focused on developing the tourism economy, focusing on attracting investment, raising funds through multiple channels, and actively accelerating the development and construction of tourism resources. In the past few years, great breakthroughs have been made in attracting investment. By the end of 20**, there were 9 projects with signed contracts for tourism investment in the city, with a total planned investment of 1.491 billion yuan, which effectively solved the problem of financial difficulties in the development and construction of tourism projects.

(2) Progress of key development and construction projects

By the end of 20**, there will be 6 key tourism development and construction projects in the city, with a total planned investment of 1.181 billion yuan. By the end of 20**, a total of 555.35 million yuan had been invested. Among them, the Jiexi Huangmantong Waterfall Tourist Area has a planned investment of 66 million yuan. Last year, 14.7 million yuan was invested, with a total investment of 55.5 million yuan (2.5 million yuan of provincial tourism poverty alleviation funds since 20**), completing the road to the tourist area. 18 kilometers of cement roads, 7 kilometers of roadbed, 2 mountain gates, 2 kilometers of scenic trails, 2,500 square meters of parking lots, observation decks, foundation clearing of the regulating storage dam, and acquisition (renting) of mountainous areas. Now the regulating pond upstream of the scenic area is large. The dam, parking lot and tourist reception center are under construction and are expected to be completed by the end of August and open in September. The Jiexi Shinei River Rafting Tourist Area project has a planned investment of 45 million yuan. Last year, 750,000 yuan was invested, with a total investment of 3.35 million yuan. The first phase of the project has been completed and put into use. We are planning to develop and construct the Shinei River Glacier Stone Mortar scientific research tourism and the Shinei River upper reaches tourism natural ecological sightseeing and vacation project; Jiexi Jingming Tourist Resort, with a total planned investment of 390 million yuan, will be invested in 20** 42.75 million yuan, with a cumulative investment of 259.5 million yuan. Its main building project, the resort, has now opened. The entertainment center, presidential villa, small zoo, artificial lake, business center building, tea culture research center and other supporting construction projects are under construction. Wujingfu has introduced hot spring water to the tourist resort to develop a leisure hot spring functional area. Construction has started; Jiedong Longwei Mingyue Lake tourist resort has a planned total investment of 120 million yuan, and a total of 23 million yuan has been invested to complete the detailed tourism planning, 7 kilometers of roadbed, water storage dams and 150,000 green forests; the urban Shengang Park has a planned total investment of 130 million yuan, with an investment of 2.5 million yuan in 20**, and a cumulative investment of 27 million yuan. The first phase of the project has been completed and put into use; the Rongjiang Hotel Commercial Center in the urban area has a planned total investment of 430 million yuan, and 187 million yuan has been invested. At present, the main building has been completed and has entered the comprehensive renovation stage. It is planned to be after August 20** Trial business. The construction and putting into use of these projects will bring about a big change in our city's tourism industry and will also bring considerable economic benefits. For example, since the Jiexi Jingming Tourist Resort opened on January 1, 20**, there has been an endless flow of people. In 20** ***, it received 15,835 overnight tourists, with a tourism operating income of 9.06 million yuan. This year’s May Day Golden Week reception There were 51,837 tourists. This project will provide employment for nearly 500 people, effectively promote the development of local related industries, play a positive role in increasing the income of local residents and promoting local economic development. After the Jiexi Huangmantong Waterfall Tourist Area is completed, it will form a tourism circle with surrounding scenic spots. According to surveys, it can receive more than 300,000 tourists annually, provide employment for more than 200 local farmers, and help 150,000 people in four surrounding towns and villages escape poverty. Kang.

2. Main practices

(1) Focus on planning to promote development. The first is to conduct a comprehensive survey of the city's tourism resources and determine investment projects;

The second is to strengthen planning work to ensure the orderly development and construction of resources. Each key project pays great attention to the specific planning of scenic spots. For example, before the Mingyue Lake Tourist Resort in Jiedong was developed and constructed, provincial planning experts were first invited to conduct detailed planning, and then construction was carried out according to the plan to ensure orderly development.

(2) Increase efforts to attract investment. First, tourism administration departments at all levels actively plan, provide high-quality services, and actively attract investment. For example, in view of the fact that Jiexi Wujingfu Hot Spring Resort cannot be developed and constructed due to land issues, but its hot spring resources are quite rich, the Municipal Tourism Bureau and Jingming Resort decided to transfer hot spring water from Wujingfu to Jiexi Jingming Resort after scientific analysis and analysis. The opening of the hot spring functional area not only utilizes resources but also enriches the tourism projects of Jingming Resort. It kills two birds with one stone. The project is now under design. The second is to vigorously publicize through the news media and print tourism investment materials, and organize efforts to extensively attract investment by going out and inviting in, especially as our city is a newly built city with local financial difficulties and cannot invest in the development and construction of tourism projects. actual funding. Through investment promotion, we focus on attracting foreign and private investment. At present, a total of 555.35 million yuan has been invested in six key development and construction projects. Except for 2.5 million yuan of tourism poverty alleviation funds allocated by the province, the rest of the funds are foreign and private capital.

(3) Focus on tourism poverty alleviation to effectively promote resource development and construction. The investment of fiscal funds has played an important role in accelerating product development and construction and stimulating social investment. The guiding effect of "four ounces and thousands of gold" of fiscal funds is very obvious. Since 20**, the provincial government has decided to allocate 30 million yuan in tourism poverty alleviation funds every year to support the development and construction of tourism projects in poverty-stricken areas. Our city’s Jiexi Huangmantong Waterfall Tourist Area and Huilaike Bird Tail Stalagmite Wonder Tourist Area have been approved as The tourism poverty alleviation project, the development and construction of the two projects proves that the provincial government’s decision on tourism poverty alleviation will promote the development of tourism economy in impoverished mountainous areas, promote the employment of people in mountainous areas, promote investment attraction, adjust the industrial structure, develop the county economy, improve the environment, and promote poverty alleviation. It has played an important role in alleviating poverty in the region and achieving good results. Jiexi Huangmantong Waterfall Tourist Area used 2.5 million yuan of provincial poverty alleviation funds to build scenic roads and supporting facilities, thereby introducing 55 million yuan of investment from Shenzhen investors, effectively promoting the development and construction of the scenic spot.

(4) Strengthen the tracking and management of scenic spots (spots) projects that have started construction to ensure the smooth progress of the projects. The Municipal Tourism Bureau often organizes specialized forces to provide guidance, service, inspection, and supervision for the projects currently under construction in Jiedong Mingyue Lake Resort, Jiexi Huangmantong Waterfall Tourist Area, and Urban Rongjiang Business Center to ensure that these projects can be completed as planned. projects under construction.

3. Suggestions

(1) Strengthen government leadership and build a good tourism development environment. All localities should cultivate an internal and external environment suitable for the development of tourism, clarify the positioning of the tourism industry, establish a big tourism, big market, and big development strategy with government leadership, market operation, and social participation, so as to create an excellent development environment. Establish a high-level tourism coordination agency to form a cross-industry, cross-department, and cross-region coordinated regional economic development pattern that echoes up and down, links left and right, and lays a good organizational foundation for coordinating tourism development. Formulate preferential policies and measures to promote tourism development.

Increase financial investment in tourism. The government's capital investment in the tourism industry is mainly used for resource development planning, destination image publicity and promotion, project construction guidance funds, etc., and is complementary to the investment promotion and development of tourism projects. In other words, without government investment to create a basic environment for the development of the tourism industry, it is impossible to develop investment projects. In recent years, fiscal funds have increased to a certain extent in tourism investment, but the total amount is still too small and lags far behind the rapid development of the tourism industry. To drive and promote resource development and construction, in addition to pioneering innovation and hard work in the city's tourism industry, increasing financial investment is an indispensable and important part. Consideration should be given to increasing financial investment in the tourism industry, especially project development and construction. On the other hand, we should give full play to the role of fiscal funds in "making four ounces out of a thousand pieces of gold". It is necessary to continue to increase investment in tourism poverty alleviation. For tourism projects that have just started, tourism poverty alleviation funds must continue to be subsidized. For projects that already have a certain foundation and need further improvement of supporting facilities, consideration can be given to The tourism poverty alleviation fund subsidy was changed to provide interest discounts on tourism project loans.

Judging from the situation in our city, the development and construction of tourism projects in the future will require a large amount of investment, and the demand for external loans is huge.

Further strengthen the tourism industry to attract investment. The city must emancipate its mind, update its concepts, accelerate the pace of attracting investment for the construction of tourist attractions and comprehensive resource development, and orient the city's resource development and construction to the market in accordance with the principle of separation of ownership, management rights and franchise rights, so as to attract more large-scale, Enterprise groups with good management skills and good brands will participate in capital and resource development and construction, and absorb more social funds. It is necessary to effectively promote project investment, plan and package a number of advantageous projects for tourism development, attract investment from all parties with preferential conditions, high-quality services, and good returns, and form a good situation for social tourism. It is necessary to innovate the investment and financing system for tourism industry development and conduct capital operations in a market-oriented manner.

Part 2

(1) Title: Preliminary report on the issue reflecting ***(unit, position)***(name)***

(3) Profile of the initial review objects: including name, gender, age, place of origin, education level, time of working, time of joining the party, previous major positions and current position, etc. If you have been punished, you should explain when, where and why How the question is divided.

(4) Preliminary verification of facts: answer yes or no to questions that exist, truthfully reflect questions that cannot be answered yes or no, and briefly describe minor issues.

(5) Handling suggestions: If there are indeed disciplinary violations and the party and government should be held accountable for discipline, the case should be filed.

(6) Signature: Indicate the name, unit, position of the person in charge and the time when the preliminary review report was produced.

Part 3

According to the requirements, our factory has assessed the work of various staff members in the factory in 2019. The assessment situation is now reported as follows:

1. In order to better implement XXX’s arrangements for assessment work, do a good job in the 2019 assessment work , our factory held a meeting to study the annual assessment work of the factory and made arrangements based on the actual situation of the factory. Under the unified leadership of the factory party committee, a factory assessment team composed of factory leaders and relevant personnel from various departments was established to assess various personnel in the entire factory in accordance with regulations.

2. The content, procedures, standards, time, methods, etc. of our factory’s assessment this year are strictly implemented in accordance with the regulations of the relevant national XXX leading departments and our factory’s “Interim Regulations on Staff Assessment” Implementation of the "Detailed Rules", from December 6 to December 30, each department will conduct a comprehensive assessment and evaluation of the staff of the department from five aspects: morality, ability, diligence, performance, and integrity, and propose assessment grades. 25 The department-level cadres were evaluated and reviewed one by one by the factory assessment team, and 136 staff members in the entire factory (excluding 5 factory-level cadres) were assessed. An assessment team composed of bureau leaders came to the factory for assessment on the morning of December 28.

3. 2019 annual assessment results and relevant explanations

According to the provisions of the "Assessment Work Notice" No. 193 of Xinguang Bureau [2019], our factory this year

It is an autonomous region-level spiritual civilization unit, and the outstanding ratio is controlled within 18. Outstanding personnel are determined within different job levels, and the number of outstanding department leaders (section-level) shall not exceed the proportion of personnel at the same level. Based on this, our factory strictly controls the evaluation of outstanding personnel, and the number of outstanding personnel is controlled to 18 or 26 out of 141 employees on the job. The assessment results are as follows:

(1) 26 people were rated as outstanding in the assessment

Among them: 1 department-level cadre, 5 section-level cadres, and 20 other staff members .

(2) 115 people were assessed as qualified.

4. Regarding the assessment of division-level cadres in our factory:

Reviewed by the bureau assessment team In the assessment of division-level cadres in our factory, Comrade ** was evaluated as outstanding, and the other four division-level cadres were evaluated as qualified.

5. Our factory successfully concluded this year’s assessment work on December 30. The results of the assessment and related materials will now be summarized and submitted to the Personnel and Education Department of the Bureau for review.

This report

Note: The annual assessment work review and filing form for the unit staff and the annual assessment grade list of the staff of the government agencies and institutions are attached

** ****

January 5, 2019