Traditional Culture Encyclopedia - Hotel accommodation - Special equipment self-inspection report

Special equipment self-inspection report

Special Equipment Self-Inspection Report

The hard work has come to an end inadvertently. Looking back on the work during this period, there are achievements and shortcomings. It is very worthy of our summary and completion. Self-examination report. I believe everyone is worried about writing a self-examination report again! The following is a self-inspection report on special equipment that I compiled for you. It is for reference only. I hope it can help you.

Special equipment self-inspection report 1

According to the document requirements of Nanjing Quality Supervision’s notice on carrying out special inspections of oil and gas pipelines and gas pipeline network safety production in the city (Ning’an Committee No. 20xx45), Our company quickly established a self-inspection and self-correction team to carry out comprehensive self-inspection and self-correction work for special equipment and special operators, focusing on the implementation of accident hazard identification work for special equipment, ensuring that special operators are certified to work, and strengthening safety training. Through this activity, the troubleshooting of hidden faults of our company’s special equipment has been basically in place. The self-examination and self-correction summary report is now as follows:

1. Our company’s special equipment pressure pipes and safety accessories are as follows:

1. 2 sets of special equipment: 1 pressure vessel, electric 1 single-girder crane

2. The length of the pressure pipeline is about 500 meters

3. 1 pressure gauge and 1 safety valve

2. Special equipment Description of self-correction inspection:

The two special equipment in the first phase have been used normally and are within the inspection period. The pressure pipeline is about 500 meters long and is in normal use. When the gas tank pressure reaches 0.70MPA, the machine stops running. The pressure gauge and safety valve have been calibrated.

3. Description of self-examination of special personnel’s employment certificates:

We have gone to relevant departments for training as soon as possible and strive to obtain the qualification certificate as soon as possible

4. Explanation of rectification within the time limit:

1. Safety markings on pressure pipelines

2. Relevant staff must operate in strict accordance with the rules and regulations

5. Training and education situation :

The company has organized relevant departments to hold special equipment safety training and learning, mainly focusing on the use of special equipment and strengthening the safety awareness of operators, so as to eliminate hidden dangers of accidents and achieve the purpose of this training. Special Equipment Self-Inspection Report 2

In accordance with the document instructions of the New District Quality Supervision Bureau’s “Notice on Doing a Major Inspection of Special Equipment During the “Two Festivals” and “Meetings” in 2014, our company quickly carried out The comprehensive self-inspection and self-correction activities for special equipment and special operations personnel focused on the implementation of the investigation and rectification of hidden dangers of special equipment accidents, ensuring that all special operations personnel are certified to work, and strengthening safety training for special operations. Through this self-inspection and self-inspection Activities, our company's special equipment accident hazard investigation work is basically in place. The self-inspection and self-inspection situation is now summarized and reported as follows:

1. Basic situation:

Our company's main special equipment currently has : The three sets of equipment have a total of 90 pressure vessels and 2 overhead cranes.

2. Self-inspection and self-inspection of special equipment:

After inspecting the pressure vessels of the entire plant, it was found that the second phase crane self-examination had a hidden danger, which was the crane hook. The upward running control is not sensitive;

Treatment measures: The contactor has been replaced with a new one, and the crane can operate normally. .

3. Self-inspection and self-inspection of other special accessories and warning signs:

1. Warning signs, complete systems, notice boards, etc., have been uniformly produced in conjunction with safety standardization requirements. , hanging in place.

2. Comprehensive inspection of connecting flanges and valves.

3. Comprehensive inspection of safety valves and bursting discs.

4. Inspection of certificates of special operators:

There are ***24 special operators in the factory, and the certificate holding rate is 100%. All of them have been trained and qualified by the competent department. Certificate expiration status.

5. Management Responsibility:

1. The full employee safety responsibility system has been signed this year.

2. Arrange relevant personnel to be on duty during holidays, and promptly report the production and operation status during holidays to relevant leaders and departments.

6. Training and education situation:

The company organized a factory-wide special equipment safety training and education study meeting, which focused on the "Special Equipment Safety Law" and "Safe Use of Special Equipment" , "Special operators are required to work with certificates" and "Winter traffic safety education" to conduct intensive learning and observe the learning results. Special Equipment Self-Inspection Report 3

According to the relevant requirements of the Group Company Security [20xx] No. 233 "Notice on Carrying out Inspections on Special Equipment Safety Supervision", the oilfield company further strengthens the safety supervision of special equipment to ensure Special equipment operates safely and smoothly. All units affiliated to the company are required to conscientiously organize and carry out investigations and self-inspections and self-evaluations on the current situation of special equipment safety supervision in accordance with the unified requirements of the headquarters. Our hospital actively responded and quickly launched comprehensive self-examination and self-correction activities for special equipment and special operations personnel, focusing on the implementation of investigation and rectification of hidden dangers of special equipment accidents, ensuring that all special operations personnel are certified to work. Through this self-examination and self-examination activity, the investigation of hidden dangers of special equipment accidents in the college has basically been in place. The self-inspection situation is summarized as follows:

1. Basic situation of the main special equipment of the college:

1. One electric single-girder (suspension) crane each of 5 tons, 3 tons, and 2 tons. Installed and used in teaching and training base.

2. Four elevators. Two of them are passenger elevators (Taoliyuan Hotel), and the other two are freight elevators, which are installed in two teaching buildings respectively.

3. Two 1-ton gas steam boilers are installed in the boiler room of the General Affairs Office for steam supply in the canteen, student bathrooms, student boiling water rooms and laundry rooms.

2. Self-inspection of special equipment

1. There are problems with 3 electric single-girder (suspension) cranes:

① According to the number: 5.1. 2 Hook defect (no anti-decoupling device);

② According to the number: 7.2 The cart has no travel limit;

③ According to the number: 5.2.4, 5.2.5 wire rope defects , The diameter of the wire rope is worn;

④ According to the number: 7.9 Emergency power-off switch (the control handle has no emergency stop device);

⑤ According to the number: 6.2 Line insulation (carts, trolleys, The power cord of the handle is aging and cracked);

⑥According to the number: 5.11 chain condition (the power cord of the trolley traction steel wire falls); the above existing problems have been solved by the maintenance and inspection unit Dushanzi District, Karamay City Xing Mechanical and Electrical Maintenance Department (with Xinjiang Oilfield Company's crane special equipment qualification) has completed the rectification and has been approved by the Keqian Municipal Quality and Technical Supervision Bureau. Now put into normal use.

2. There are problems with four elevators:

① The self-examination of the two elevators in Taoliyuan is normal;

② The elevator alarm facilities are not working;

③ The elevator light curtain does not respond spirit.

The above-mentioned problems have been rectified by Xinjiang Shuda Equipment Installation Engineering Co., Ltd. for maintenance and inspection, and have been approved by the Municipal Quality and Technical Supervision Bureau for acceptance. Now put into normal use.

3. The self-examination of the two steam boilers was normal. 3. Self-inspection of warning signs

Warning signs, complete systems, notice boards, etc. have been uniformly produced in accordance with safety standardization requirements, and some are hung in place.

4. Earnestly complete the application for certificates for special equipment operators

The holding rate of certificates for special operators in the college is 100%. All special equipment has completed declaration and registration, scheduled inspection, and certificate application. And use it after being confirmed to be qualified.

5. Safety management of special equipment

1. The implementation of the safety management system is relatively in place and the management system is sound. The college's boiler equipment has various management systems: "Management System", "Handover System", "Job Responsibilities", etc. Operators are also required to operate in strict accordance with the system and specifications and conscientiously perform their job responsibilities.

2. The registration procedures are complete, and the safety signs and operation inspections are in good condition. Boilers, electric single-girder (suspension) cranes, and elevators all have complete use certificates, and are hung with safety signs and inspection reports. The equipment has safety accessories, and the boiler operation is subject to a daily pre-shift inspection and inspection system during operation.

3. Stoker workers must hold certificates to work. The college currently has 4 stokers, all of whom have stoker qualification certificates.

4. Actively publicize special equipment safety regulations and improve the safety awareness of all employees. Use various learning and safety meetings to vigorously publicize special equipment safety laws and regulations, and increase the attention and recognition of special equipment safety personnel.

6. Future plans

1. Further increase the publicity of special equipment safety laws, regulations and rules, and continuously improve the professional level, safety awareness and legal awareness of special equipment management and user personnel.

2. Earnestly implement the safety responsibilities of special equipment and strengthen the department’s awareness of safety responsibilities.

3. Continuously improve the special equipment files, strengthen the dynamic management of special equipment, handle the inspection and certificate renewal of various special equipment in a timely manner, and update the equipment database in a timely manner.

4. Provide training for special equipment operators to ensure safe operation of equipment. Special Equipment Self-Inspection Report 4

According to the spirit of Yongning County Quality and Technical Supervision Bureau Document No. 42, "Notice on Carrying out 'New Year's Day and Spring Festival' Special Equipment Safety Inspection", Yinchuan University Special Equipment Safety Self-inspection Report . The General Affairs Office of Yinchuan University conducted a self-inspection and self-correction on the safety of the school’s boilers and other special equipment. The results of the self-inspection are now reported as follows:

1. The implementation of the safety management system is relatively in place and the management system is sound: Yinchuan The university's boiler equipment has a sound "Equipment Maintenance System", "Management System", "Shift Handover System", "Health and Safety Security System", "Job Responsibilities", etc., and establishes a style of strictly following the system and responsibilities, and regularly strengthens Educate and set up dedicated supervisors for the performance of job responsibilities, and the rectification report "Yinchuan University Special Equipment Safety Self-Inspection Report".

2. Registration procedures are complete, safety signs and operation inspections are in good condition, Yinchuan University boiler usage certificates are complete, and safety signs and related certificates are hung. The equipment has safety accessories. The pressure and gauge safety valves were calibrated before the boiler was operated, and an unqualified safety valve was replaced. Inspections are relatively intensive, with daily pre-shift inspections, rotating inspections during boiler operation, and weekly major inspections. Major inspections and overhauls are also arranged every month, and detailed records are made to ensure normal operation.

3. Staff have strict pre-job training, daily work arrangements and technical guidance are in place: Yinchuan University boilers and other special equipment have undergone strict training before taking up their posts, and the training teachers have decades of experience in boilers and other special equipment A master with experience in equipment safety maintenance and operation management, and provides follow-up guidance in the school. Each stoker is a skilled worker with many years of experience working in this school. It is planned to conduct two emergency plan drills before New Year's Day and Spring Festival.

4. Staff qualifications of stove stokers: Adopting the principles of strict management and standardized systems, there are currently 4 stove stokers, all with qualification certificates for stove stokers, who are on duty in three shifts.

5. The special equipment operation files are relatively complete and the management regulations are in place. All special equipment is equipped with operation file records for real-time tracking and recording.

6. During holidays, the whole school attaches great importance to safety work and organizes safety inspections at any time. This basically eliminates potential safety hazards and ensures that maintenance personnel are on duty when the machine is running. ;