Traditional Culture Encyclopedia - Hotel accommodation - Notice of rectification after inspection

Notice of rectification after inspection

Notice of rectification after inspection (select 7 articles)

A notice generally refers to a notice, which is a document circulated in written form to announce relevant information. The contents of the notice generally include the object, main items, signer and date of the notice. The following is the rectification notice after my inspection. Welcome to check it.

Selected text of rectification notice after inspection 1

Notice of rectification of construction project

Establish a big bag team:

On, 2002, the law enforcement inspection team organized by the Municipal Housing and Urban-Rural Development Bureau conducted a comprehensive inspection on the safety and quality of our project department. Upon inspection, the following problems exist in the 5# building project undertaken by your team, which must be rectified before June, 2002, otherwise the work will be stopped and economic penalties will be imposed in accordance with relevant regulations.

The main problems are:

Template:

1, the formwork support system has no sweeping rod;

2. The stair tread template is not supported by three door leaves;

3. The formwork support system is integrated on an outer frame;

4, template flat-fell seam is not tight.

5, stair step ripping too early.

Steel bar:

1, the key parts of steel binding are not strictly controlled;

2. The thickness of protective layer is uneven, and there are too few protective layer pads.

Concrete:

1, elevation control is out of control;

2. The concrete surface of the cast-in-place slab and the stair tread are uneven;

3. Serious slurry leakage and great waste.

Issued by:

Signed by:

Construction engineering group co., ltd

The first project department

Date, month, 202.

Select rectification notice 2 after inspection.

Xuzhou Engineering Co., Ltd.:

The steel structure workshop project undertaken by our company was discovered by our staff: your company did not carry out foundation construction according to the requirements of the construction drawings approved by our company, mainly because the grade of cement used was too low, the ratio of cement to sand was not operated according to the construction requirements, and the ratio was artificially changed, which led to the unqualified quality standard of the poured cement foundation.

The quasi-requirement will bring serious security risks to the steel structure built in the later period, and the engineering quality is difficult to guarantee. Therefore, we strongly demand that you immediately conduct a comprehensive inspection of the poured foundation according to the requirements of the construction drawings, and dismantle and rebuild the finished products that do not meet the quality requirements, and all losses arising therefrom shall be borne by you. Please take the time to complete the rectification and inform us of the rectification.

Contact telephone number:

-Factory Building Inspector Group

Date, year and month

Select rectification notice 3 after inspection.

The owner of _ _ _ _ _ _ _ _ _ _ _

In order to strengthen the safety management of residential buildings, safeguard public safety and public interests, we found that you dug holes in the external wall, opened the back door without authorization and other illegal decoration behaviors. According to the Regulations on Safety Management of Urban Houses in Ningbo, you have violated the second paragraph of Article 1 [It is forbidden to make holes in the exterior wall, dig doors and windows, and change the color of the exterior wall]. On June 24th, we sent you a rectification notice, requesting that it be restored within 10 days, but it has not been rectified so far. According to the relevant regulations, we will send you a rectification notice again, and you will be restored to the original state within 7 days, and you will bear the consequences if you fail to correct it within the time limit.

_ _ City _ _ Property Management Co., Ltd.

_ _ _ _ Management Office

Date, year and month

Post-inspection rectification notice option 4

People's governments of all districts and cities, administrative committees of demonstration areas, administrative committees of Xixian New Area, municipal people's governments, and relevant provincial departments:

According to the requirements of the Notice of the General Office of the State Council on Strengthening Environmental Supervision and Law Enforcement (Guo Ban Fa [20 _] No.56) and the unified deployment of the Ministry of Environmental Protection, our province carried out a major environmental protection inspection in the whole province from February 20th to June165438+1October. In order to consolidate the effectiveness of the inspection, with the consent of the provincial government, the rectification of outstanding environmental problems found in the inspection is hereby notified as follows.

First, the overall goal

Through the rectification of outstanding environmental problems, we will continuously strengthen the main responsibility of environmental protection in various localities and departments, establish and improve a long-term mechanism for environmental supervision and law enforcement, solve outstanding and difficult problems found in a number of environmental protection inspectors, do a good job in preventing major environmental pollution incidents, and promote the continuous improvement of the ecological environment quality in our province.

Second, the key tasks

(1) Clean up illegal construction projects. All localities should, in accordance with the requirements of "eliminating and closing a batch, rectifying and standardizing a batch, and perfecting a batch for filing", respectively set up rectification accounts for illegal and illegal projects of "building first and approving later" and "investing first and testing later", speed up the supervision and rectification, and ensure that the rectification task is completed before the end of 20_.

(two) to crack down on illegal sewage enterprises. All localities should focus on investigating illegal enterprises such as abnormal use, smuggling, forgery and tampering with environmental monitoring data of pollution prevention and control facilities, and strictly implement rectification measures. Those who refuse to correct and are suspected of committing crimes should be seriously investigated for the responsibility of relevant personnel and enterprises.

(3) Rectify the problem industrial park. All localities should earnestly do a good job in the rectification of problem industrial parks, especially those involving mass relocation, environmental emergency plans, planning environmental assessment, incomplete environmental protection infrastructure or abnormal operation. , to develop a responsibility book, a clear timetable, complete the rectification as required.

(4) Eliminate backward production capacity. All localities should continue to eliminate the "fifteen small", "new five small" and production processes that do not conform to industrial policies in light of the actual industrial development and environmental quality, and force industrial transformation and upgrading.

(5) supervising the ecological environment. All localities should carry out special supervision and rectification of illegal sewage outlets and illegal development and construction in drinking water sources and nature reserves.

Third, the work measures

(1) Strengthen leadership and pay close attention to implementation. All localities should earnestly fulfill the responsibility of territorial management, strengthen the organization and leadership of rectification of outstanding environmental problems, formulate rectification plans for problems and hidden dangers that have not been rectified in major inspections, clarify rectification measures, objectives and time limits, increase supervision, and achieve "three misses" (unclear tasks, unfulfilled responsibilities, and inadequate measures); For the environmental problems and hidden dangers that have been rectified, it is necessary to "look back" through self-inspection by enterprises, special inspection by environmental protection departments and comprehensive supervision by the government, and the rectification will be announced to the public in a timely manner. At the same time, it is necessary to strengthen daily supervision and inspection, and promptly investigate and rectify environmental problems that have not been investigated in major inspections.

(2) Severe punishment and serious accountability. All localities should strictly implement the Environmental Protection Law and other environmental protection laws and regulations, focusing on cracking down on malicious illegal sewage discharge and data fraud. Enterprises with serious violations of the law should be severely punished according to law and rectified within a time limit. During the rectification period, it is necessary to limit production and discharge, and those that still fail to meet the requirements after rectification should be closed according to law; For enterprises listed in the "blacklist", it is necessary to suspend the examination and approval of new, modified and expanded projects. It is necessary to improve the system of investigating and handling major cases and improve the linkage mechanism between administrative law enforcement and criminal justice. For suspected criminal cases with serious nature and bad influence, the environmental protection department should jointly supervise with the judicial organs, and resolutely overcome the phenomenon that the case is finalized, the case is difficult to move, and the punishment is replaced by punishment. At the same time, it is necessary to warn the responsible units and supervision units with poor rectification and slow progress; If the circumstances are serious, such as practicing fraud and committing crimes against the wind, the responsibility should be investigated seriously.

(3) Strengthen dispatching and smooth information. All localities should strengthen statistical analysis of information, do a good job in information disclosure and submission, report the progress of rectification of outstanding environmental problems (including construction project cleaning) every month, and report the development of the work every quarter. According to the principle of "whoever fills in the report will cancel the numbering", all localities will be responsible for canceling the numbering of the list of environmental problems step by step, and report the rectification of environmental problems (including the clean-up of construction projects) to the provincial government before the end of October, and send a copy to the provincial environmental protection department, explaining the reasons for the problems that cannot be rectified and cancelled one by one. The provincial environmental protection department will report the supervision situation according to the sales number of the environmental protection inspector inventory system, notify the local development situation every month, conduct warning interviews on serious problems, and publicly expose them in the major media in the province.

Contact: Zhu, Provincial Environmental Protection Law Enforcement Bureau

Tel: (Fax:

E-mail:

_ Provincial Environmental Protection Department

June 20(th), 2008

Post-inspection rectification notice option 5

Mei Jiali Property Management Co., Ltd.:

Since the residential area was used for 20 years, the property service has been insufficient. The confusion of property management has caused a bad influence among the owners. To this end, after discussion and deliberation by the residential owners' Committee, we now propose a rectification notice to the residential property company. The problems in urgent need of rectification are summarized as follows:

I. Safety management issues

1. The safety responsibility is unclear, the process is unclear, and the personnel access management is chaotic. Security guards chat with idle people during working hours. People who enter the park do not register, and outsiders do not ask, so that all kinds of advertising leaflets are spread all over the community.

2. The security etiquette is not dignified (no security clothes).

3. The security arrangement is unreasonable and there are too few people in the same position. Patrol at ordinary times and at night is insufficient. It's rare to see security patrols.

4. The fire extinguisher is damaged, and some public facilities are damaged and not repaired.

5. Some street lamp wires are exposed and not handled in time, which has great hidden dangers to the personal safety of the owners.

Second, vehicle management.

1. The owner's vehicles in the community are not counted.

2. The parking management of vehicles in the community is poor, some vehicles are parked in the green belt, or some garage vehicles are blocked.

3. When foreign vehicles enter the community, the doorman does not register and never tracks them, which causes foreign vehicles to occupy the roads of the community at will and crush the green space of the community, resulting in damage to the greening of the community.

4. There are many dead ends of garbage, and the problem of littering affects the community environment. It is necessary to clean up the garbage in the community in time and remove the garbage and sundries piled up at will.

Small advertisements can be seen everywhere in the community, which seriously affects the beauty of the community. It is necessary to strengthen the inspection work of cleaning staff and remove small advertisements in time. Third, the issue of cleanliness.

1. Life, the garbage in the pool can't be cleaned in time.

2. The sanitary corner of the corridor cannot be cleaned in time.

Fourth, greening.

1. The greening of the owner's residential community and some public * * * areas was seriously trampled on and not repaired in time, which reduced the landscape and greening level of the community.

Verb (abbreviation for verb) financial problems of the community

1. The property shall publicize various charging standards.

3. For the * * * property with financial income in the community, a financial disclosure system should be established. Publicize the financial revenue and expenditure of the community. Financial openness and transparency.

The above contents that need to be rectified require your company to complete the rectification before 20__, April 16, when the members of the community industry committee will accept the rectification on behalf of all the community owners.

I hereby inform you.

Mei Jiali Property Management Co., Ltd. was ordered to take out written rectification measures before April of 1, 20__. In the next six months, we will solicit the opinions of all owners according to the property rectification and consider whether to pay the property management fee for the coming year; And whether to sign a property service contract with Mei Jiali Property Management Co., Ltd. in the coming year.

___

Date, year and month

Select rectification notice 6 after inspection.

Notice of rectification of construction project

Project name:

Number:

Project manager:

Dongli scaffold

Person in charge:

Full-time security officer:

Date:

Inspection parts: potential safety hazards of steel pipe scaffold and portal scaffold.

Rectification content:

1, the portal scaffolding on the east and north elevation of the first floor is not integrally connected.

2. The lap joint of the bracing steel pipe in the north facade does not meet the specification requirements. (steel pipe scaffold lap length and fastener shortage, etc. )

3. The inside of the corner of the pedestrian walkway along the street is not connected with the fixed sweeping pole.

4. Some parts of the scaffolding in the north facade are short of fasteners, and some parts of the scaffolding are not fastened firmly, and the number of wall supporting connectors is insufficient.

5. The pedestrian protection shed of the main building passage of the hospital is only provided with a single protective ceiling, but not with a double protective ceiling according to the requirements of the specification.

6. The location of the bar, the west facade of the podium, and the springboard erected by the pedestrian walkway shed are not fixed by steel wire binding, which has potential safety hazards.

7. According to the requirements of the supervision unit, the cantilever scaffold at the reinforcement must be dismantled before, otherwise the site construction cannot be resumed.

8. For the pedestrian walkway protection shed on the west facade, the distance between the hard protection springboard on the top floor is not tight, and the springboard and the steel pipe frame are not tied and fixed with steel wires, which has certain security risks.

9. After the pavement of fastener scaffold protective net on the west facade is completed, it is loose, and some of it has been opened, which affects the image of civilized construction at our site, and it is ordered to complete the maintenance before June 4, 20__. Attachment: Site photos (10)

Signature of person in charge:

Signature of full-time security officer:

Signature of project manager:

Date, month, 202.

Select rectification notice 7 after inspection.

Number:

In order to promote the overall improvement of the rural landscape, according to the requirements of the new urban area, the environmental sanitation on both sides of the national, provincial and municipal ring roads will be thoroughly cleaned up, and the "messy" phenomena such as littering, littering, sewage and out-of-store operation will be put an end to.

After receiving this notice, please comprehensively rectify the surroundings of your unit and the central line of expressway before 20_ _ _, and implement the "three guarantees in front of the door" to ensure a clean environment and orderly parking of vehicles.

If your unit fails to complete the rectification within the specified time, the township government will order it to suspend business for rectification and start business only after the environmental sanitation reaches the standard.

After the completion of this centralized rectification, if it is found that your unit has domestic garbage piled up at will, sewage turbulence, out-of-store operation, etc., 500 yuan sanitation and cleaning fee will be levied.

I hereby inform you.

_ _ People's Government (official seal)

20_ _ _ _ _ _