0 1.
What is the standard for superelevation zoning?
1. What kind of partition can be called superelevation partition?
Ultra-high type (elevation 9m- 18m) can be called ultra-high partition, which is a common movable partition system in many high-star hotels. Ultra-high partition can effectively divide the space of banquet hall and conference center, and achieve the purpose of multi-purpose and non-interference in one hall.
2. Here is a case to share with you:
Suzhou International Expo Center is a relatively high movable partition in China at present, with a height of 15m and a width of 48m.
So what's the difference between this partition and the guide rail partition we usually see in hotels? Usually, the partition we see is a 100 movable partition with a thickness of 100mm, and the maximum height of this partition can reach 12m.
▲ General 100 movable partition
The partition used in Suzhou International Expo Center is the ultra-high partition wall of 100 automatic turnover system, and the maximum partition can reach 18m. Adopt all-steel frame structure, spiral telescopic structure, internal bottom bearing, adopt silent pulley, and the safety maintenance is relatively simple.
Equipped with automatic steering system, there are professional guide blocks in the guide rail.
When the movable partition is pushed to the turning or stacking place, the guide block will automatically guide the partition door to slide to the designated track. The weight transmission system of the vice can ensure that more than 70% of the weight of each door panel acts on the ground after being fixed to the ground, effectively reducing the load of the top steel frame and track, solving the stability problem and improving the durability of the partition.
1) The automatic turnover system of ultra-high partition wall has the following characteristics:
2) Structural analysis:
▲ Door leaf structure
▲ track structure
▲ Node details
3) Door system inside the door: the movable partition can be a single door or a small door, and the door lock is pre-installed to form an integral door leaf.
02.
What are the precautions for the installation of ultra-high partition?
1. Installation site example of super-high partition in an engineering hotel:
▲ Deepen the plane map, click to view the high-definition map.
▲ The manufacturer deepens the drawings.
▲ The manufacturer deepens the detailed node map, and click to view the HD map.
2, construction matters needing attention:
1) Observe the overall construction environment of movable partition, carefully observe the surrounding environment and investigate the current construction environment. Investigate the construction environment of the partition to be installed, the main purpose is to draw the conclusion that the furniture on site does not have the installation conditions, and carefully record the position of the beam and column on the roof and the reserved space, as well as the position of the air conditioning piping system, so as to customize the final construction scheme;
2) According to the measurement and positioning, according to the requirements of the construction drawing, release the position control line of the movable partition wall on the indoor ground, and lead the position line of the partition wall to the side wall and roof; When rewinding, the installation position line of the fixed parts should pop up; The installation height of the track must be discussed with the construction team that installed smallpox, otherwise it will breed a lot of unnecessary troubles.
3) Steel structure and rail fixture installation The steel structure is a load-bearing structure connecting the ceiling and the rail, and the steel structure is related to the safety of the whole movable partition wall system, so designers should pay special attention to it; By calculating the weight of the movable partition, the load borne by the track, the specifications and fixing methods of the embedded parts are determined, and then the fixed parts such as the track are selected according to the design requirements.
3, the construction process:
1) Install the track
Suspension guide rail: The suspension guide rail is fixed by installing a pulley on the top surface of the partition and connecting it with the upper suspension guide rail. The track and pulley should be selected according to the bearing weight. Light movable partition wall, the track is fixed on the wooden frame or steel frame along the top with wooden screws or opposite screws. Heavy movable partition walls and tracks are fixed on the steel skeleton with opposite screws or welding.
Support track: the fixed way of support and guidance is that the pulley is at the lower part of the partition and forms a lower support point with the ground track. The track is fixed with expansion bolts or track embedded parts, and the guide rail is installed on the wooden frame along the top.
Installation of track: according to the specific situation of track, install the reserved opening of pulley or track in advance (generally, 1/2 partition fan is close to the wall).
2) Install the movable panel
According to the installation method, accurately draw the pulley setting line on each panel, and then fix the pulley fixing frame on the upper stile or the lower stile of the partition with screws; Then put the panels into the track one by one, and adjust each panel to be vertical to the ground, which is flexible to push and pull. Finally, connect and fix each panel, usually connecting adjacent panels with hinges.
3) Finishing
According to the requirements of hotel interior design, soft package, cold-packed solid wood board, decorative board, glass panel, etc. Generally used for facing decoration; Paint finishing or edging shall be carried out after finishing the facing, and the decoration construction of the facing shall be carried out according to the corresponding requirements of the second standard, so as to make the choice of hotel-style facing.
4) Debugging:
After the installation of the movable panel is completed, it is necessary to debug the panel height, sealing and other details. After debugging, clean up the site and complete the installation work.
4, the scene signal:
Foshan ge xian sheng activities geduan manufacturer
Focus on one-stop movable partition engineering service
Undertaking large and small projects all over the country can be measured at home.
- Previous article:How to get from Chebeinan to Vienna Hotel (Guangzhou Luogang wanda plaza Branch)?
- Next article:Is the telephone number 95298 137 true?
- Related articles
- Which faction of Jining Cuidu International City belongs to?
- How about Shenzhen Baiyusihaohang International Freight Forwarding Co., Ltd. Guangzhou Branch?
- Zheng Chenggong's mighty statue in Nan 'an is 400 words.
- How about Longhai Hotel in Yangzhou?
- What is the star rating of Hangzhou Bund No. 1 Hotel?
- How long will it take to build Yuecheng in Jinwei Territory, Nanchong?
- Which bus should I take from Guiyang North Station to Vienna International Hotel (Southwest Trade City Store)?
- Interior decoration wallpaper picture
- Is there a comprehensive job fair in Shanghai recently? Specific time and place.
- Which bus should I take from No.252 Moganshan Road, Hangzhou to Building E, Xiasha Campus, Zhejiang Gongshang University? Is there a subway?