How long does it take for the hotel to install water and electricity?
The time required to install water and electricity is generally determined according to the engineering quantity, difficulty and number of workers. For example, for a new house of 100 square meter, the time limit for the complete renovation of water and electricity can be completed in almost one week.
The circuit transformation process includes on-site disclosure, on-site finished product protection, circuit elastic line positioning, slotting, ground garbage cleaning, fixed wire box, elbow, fixed wire tube, threading, wiring, electrical box and on-site acceptance. Waterway reconstruction process includes on-site disclosure, on-site finished product protection, waterway positioning and elastic line positioning, slotting, cleaning up ground garbage, drilling and fixing pipe clamps, connecting water pipes, plugging, pressure test and on-site acceptance.
- Related articles
- Can I travel after six months of pregnancy?
- What's the princess waiter doing on stage? Want the inside story of the answer I have done or I know, thank you.
- Yuxi company registration: How to name the company?
- How about Huianyuan Commercial Street? OK or not? Is it worth buying?
- How much is the monthly salary of the US group food delivery staff?
- How to get to Wanfang International Hotel in Beijing Railway Station?
- Japanese crime drama recommendation
- What should I say on the back of the photo?
- Cheap hotels near Shanghai Metro Line 2
- Qualification honor of Shenzhen Tieren Ecological Environment Co., Ltd.