Traditional Culture Encyclopedia - Hotel accommodation - Six work plans of the engineering department
Six work plans of the engineering department
Work plan of engineering department 1
I. Personnel arrangement
According to the requirements of operation mode and post management, the number of engineering personnel remains unchanged at present to ensure the operation of hydropower system. In order to ensure the timely and effective handling of emergencies, the system of attending classes at night is implemented within the existing staffing.
Second, the work plan
(1) Strengthen the service consciousness of the engineering department. At present, in terms of service, the engineering department needs to further improve the service level. What is abnormal is the way and quality, which needs further improvement. Our department will regularly and irregularly carry out training on service awareness and methods to improve the service quality and efficiency of our employees.
(2) improve the system, clear responsibilities, to ensure the benign operation of the department. In order to give full play to the role of engineering department as a good communication and caring link between property and merchants, we should improve and perfect the working system according to the service form to make it more suitable for the current work. From the system of equipment management and personnel arrangement, the work is truly rule-based and standardized. Through the implementation of the system, clear responsibilities, to ensure the sound development of departmental work.
(3) Strengthen equipment supervision and cost awareness. The engineering department is responsible for the maintenance and management of all facilities and equipment, which is directly related to the control of property costs. Be familiar with the operation and performance of the equipment to ensure the normal operation of the equipment. When operating according to the specifications, the engineering department will supervise the gravity area according to the requirements of relevant work to ensure the equipment is equipped, maintained and effective; And plan the maintenance of facilities and equipment to specific individuals.
(4) Carry out training, strengthen study and improve skills. At present, the service scope of the engineering department is still relatively limited, and the abnormality is limited to the structure of its own knowledge. In order to further improve their work skills, it is necessary to properly carry out theoretical study, learn from each other's strengths and improve the service level of the whole team.
(5) According to the characteristics of facilities and equipment maintenance, formulate corresponding maintenance plans and refine work objectives.
Third, do a good job in energy control and management.
Energy consumption usually accounts for a large proportion of the daily cost of property companies, and energy saving and consumption reduction is an effective means to improve the efficiency of companies. The key to energy management is:
(1) Improve the energy-saving awareness of all employees.
(2) Formulate necessary rules and regulations.
(3) Take necessary technical measures, such as market advertising, renovation of street lighting facilities, etc., and adjust the time of switching lights in time according to the season to minimize energy consumption; Corridor lights are transformed into energy-saving lamps, and control switches are transformed into touch delay switches.
(4) Internal assessment and control of equipment operation and maintenance costs to avoid and reduce unnecessary waste.
(5) Copy and summarize the water and electricity meters regularly every month, and do a good job of energy saving and consumption reduction.
Work plan of the second part of the project
First, the overall thinking of the work
According to the current progress of the project, the Engineering Department will gradually plan the specific work ideas for the next year while actively and steadily completing the finishing work of the existing project, as follows:
? Two structures? Refers to the team building, combat effectiveness and cohesion of the engineering department; Construction project management system and project management system. Engineering construction? Three goals? It means that the project schedule goal, quality goal and cost goal should be reasonably balanced, coordinated and unified, so as to promote the completion of the comprehensive goal of the project.
Second, the project management indicators
1. The indoor lighting renovation project of Lebin Department Store was completed.
The floodlight project on the eaves of New World Plaza was completed.
C, the engineering qualification rate reached 100%.
D, zero major safety accidents on the construction site
Three. working face
(1) Construction and its scale
In 20XX, with the support of the company and relevant departments, the engineering department started the indoor lighting renovation of Lebin Department Store and the floodlighting project of the outer eaves of New World Plaza according to the scheduled commencement date of the company.
(2) Quality control objectives
Excellent projects reached 80%, and qualified projects reached 100%. All the master control projects are qualified, and the general projects have been accepted.
(3) schedule management objectives
Complete the annual plan target issued by the company and realize the schedule management contract target.
(D) Cost control objectives
Complete all kinds of cost control targets issued by the company, and complete cost control contract targets and schedule control targets. (5) Safety etiquette measures
Safety courtesy measures mainly come from the following two aspects;
1) qualification certificate management
First, the business cooperation unit safety production qualification examination and filing management
B, construction machinery testing for the record.
C, special operations personnel certificate review for the record
D, professional technology, professional management security personnel qualification examination for the record.
2) Main construction scheme and system management.
A, the construction site layout review
B, civilized construction management measures implementation
C, warehouse management scheme, scaffolding scheme, construction temporary electricity scheme, construction machinery erection scheme, aerial work control scheme, construction survey control scheme, etc.
D, workers living environment management system
E, site construction environment management system
F, safety and civilized construction inspection appraisal and reward and punishment system
(VI) Internal construction of departments
1, team building:
Focusing on next year's work objectives, the team building of engineers in the department is particularly important. Engineering department to improve this department? Team cohesion? And then what? Team fighting capacity? As a basis, encourage employees to participate in the activities organized by the company, participate in the construction of corporate culture of the company, and strive to promote the coordination among employees and the team building of the company; Fully stimulate the work enthusiasm of employees and improve the overall combat effectiveness of employees.
2. The institutional system construction of the institutional system engineering department is mainly reflected in the following aspects;
A, improve the internal rules and regulations of the engineering department;
B, clear the division of responsibilities within the engineering department;
C, constitute the internal work and business process contact with other departments;
D, with the management rules and regulations of engineering business cooperation units;
Fourth, pay attention to the problem.
(A) a clear mode of construction
While the company's construction mode is gradually clear, the engineering department will quickly sort out the ideas according to the company's construction mode and complete the docking with the company's model at the first time.
(2) Reasonable planning of contracts and contracting methods
According to the characteristics of the project, plan and determine the contract and contracting method suitable for our company's project characteristics. After reasonable planning and mode determination, the profit of the project is maximized.
(III) Establish and improve the project management mode suitable for the Company.
According to the company's project management model, the engineering department will improve various rules and regulations based on this model to form a complete and feasible management plan.
Verb (abbreviation of verb) expects support and help.
In terms of human resources and team building, we hope to get strong support from the company. In addition, the project construction mode will be determined as soon as possible.
Work plan of the third project
After 20XX years of hard work, all the colleagues in the engineering department have completed all the tasks, but the next workload is very large. What year is 20XX? Guarantee acceptance? A crucial year. In 20XX, the central task of the engineering department is to ensure the smooth acceptance of the park at the end of the year through project management. While ensuring acceptance and grasping the progress, we should not relax the quality and safety of the project, but grasp the progress with quality and safety. In order to resolutely implement the company's important decision that the completion and acceptance of Fuguoshan Life Memorial Park must be completed by the end of 20XX, the work plan for this year is formulated according to the actual situation of the engineering department as follows:
First, strengthen team building and improve service level.
1, Manpower Allocation and Sustainable Development of Engineering Department
The organizational structure of the engineering department should be streamlined and meet the needs of project construction. At present, the staffing is 65,438+0 for the head of engineering department and 65,438+0 for the head of civil engineering, which is reasonable for the current company's projects. But this does not meet the needs of the company's project construction, and it needs to inject fresh blood to increase and train managers. It is proposed to recruit hydropower engineer 1 person, budget officer 1 person, office librarian 1 person, and 3 * *.
2, strengthen internal communication and exchange, enhance the combat effectiveness of the department.
A good team is first of all a team with strong discipline and execution, and it is not relaxed to complete the established tasks on time. 20XX is the year of park construction acceptance. To improve the cohesion of department personnel, we must pay great attention to the team building of the department and strive for more humanized management. Company leaders should keep abreast of engineers' ideological trends and difficulties, communicate with engineers more, understand their difficulties and do their ideological work in time.
Division of labor and cooperation, strengthen internal communication, create a good working atmosphere, encourage and advocate different opinions, carry forward the spirit of unity and cooperation, clarify departmental goals and personal work goals, carry out work in a planned and orderly manner, take the company's goals as the guide, and properly handle contradictions in departmental work and post work.
3, carry forward the spirit of unity and cooperation, strengthen the service thought, improve the service level. The engineering department should set up all builders of park construction. A family? The idea is to strengthen communication and exchange with other departments, construction units (at all levels), supervision units, local governments and departments of the company, give play to the personality charm of engineers, be familiar with the characteristics, skills and adaptability of colleagues, communicate with colleagues frequently, and create a good working atmosphere. We are required to establish the overall concept, the idea of serving the construction, the spirit of dedication and hard work, and regard the whole park construction as a big team, with unified thinking, unified understanding, unified goals and unified actions.
The second is to strengthen the enterprising and positive work style and improve work efficiency.
The engineer should be nearby? Guarantee acceptance? The big goal is to serve the construction ideas and deal with problems in time without delay. Involving other departments, we need to take the lead in forging ahead and cooperate with the previous work.
In 20XX, we should continue to strengthen every engineer's consciousness of strict management and enthusiastic service, avoid the negative working attitude of waiting, relying on and procrastinating, take the project as our own responsibility, strengthen self-awareness, be strict with ourselves, pursue perfection, set an example and establish a good professional image; Adhere to a good work attitude and service awareness, work hard, be dedicated and pragmatic, and dare to take responsibility.
Take the initiative, be serious and responsible, complete the tasks assigned by superiors with high quality and efficiency, ask for instructions and report in time when encountering problems, feedback and improve in time when finding problems, implement and track the work in time, and upload and issue quickly and accurately. Follow up and implement their respective tasks and give timely feedback, strengthen their sense of responsibility and dedication, give play to everyone's skills, and maximize the value of life.
Three, do a good job in daily work, strengthen learning, and constantly improve the level of business management. 1 and 20XX, the construction of various professional projects in the park was fully rolled out. All employees should strengthen the study of various professional knowledge, learn from each other among engineers, improve their professional quality, and be a qualified engineer of Party A with strong comprehensive skills. Strive for the support of company leaders and organize other excellent parks to visit and study.
2. Formulate the engineering system and post responsibility system, and define the post responsibilities.
3, participate in the work of the blue prints.the design construction.
4, presided over the construction plan, total schedule, quality control plan, as well as the examination and approval of the project division and witness plan. Make detailed quantitative analysis of all quality objectives, formulate targeted quality control plans for all engineering projects and supervise their implementation.
5. The personnel of the project management department should seriously study the relevant national standards, local standards, company management manuals and relevant construction quality specifications, strictly manage the site, list the important parts, key technologies and construction materials that are difficult to control, influential and inexperienced as quality control points, implement key control, and correct the deviations in time when found.
6. Regularly check the quality, safety and progress of the project department. Fourth, the specific schedule of the engineering department in 20XX.
For the specific working time nodes of the engineering department in 20XX year, see Annex I Schedule of Project Progress Control Nodes in 20XX year.
20XX is a crucial year for the engineering department, with large construction area and tight construction period. All employees in the engineering department are required to take project management as the core, strictly control the project quality, go all out to implement it quickly, comprehensively promote the development of all work in the engineering department, and ensure the successful completion of the 20XX annual project construction goal.
Work plan of the fourth project
I. X-month Work Plan of Engineering Department
1. Ensure the normal operation of the equipment in the process of continuous inspection and maintenance.
2. Follow up the engineering problems left by 20xx, and put forward effective rectification measures.
3. Conduct training in strict accordance with the annual training plan, especially the induction training for new employees.
4, the establishment of facilities and equipment maintenance plan, in strict accordance with the plan.
9, to do a good job of secondary decoration data review and inspection, to ensure the safety of decoration construction.
10, do a good job in selecting and signing the maintenance unit of outsourced facilities and equipment.
1 1. Organize all housing information and establish files.
12, cooperate with the completion of the work of the marketing department and various departments.
13, do a good job in paid non-permanent service for engineering maintenance of business households.
14, establish equipment files and do a good job of equipment data archiving.
15. Strengthen the training of employees' business skills.
16. Strengthen the staff's concept of property service, understand the working data of the engineering department and how to maintain the equipment and facilities.
17, strengthen the maintenance concept of maintenance workers on equipment and facilities.
Second, the engineering difficulties and solutions
1. visited various projects nearby, and found that our company's engineers have low salaries and few personnel. We hope to get the support of senior leaders, so as to improve the quality of life of our engineers.
2. The underground garage cannot be powered by some lighting points in the diesel generator room of Building 2, which seriously affects the use of industrial garages. Ask the group to coordinate with relevant departments to solve the problem.
3. Door and fence access locks of residential units are expected to be solved as soon as possible.
4. It is expected that the leaders of the property management company can mobilize the management responsibilities of various departments, manage the past living habits of the owners, and manage the use of unit doors and basement access doors to reduce losses and maintenance costs for the property. I look forward to serving the owners better and building a trustworthy property management company for them in the new year.
Work plan of Engineering Department 5
A, the overall work of the engineering department:
In order to ensure the normal operation of hotel electric power work, it is necessary to further strengthen the maintenance and operation management of equipment and strengthen planned maintenance. Equipment inspection to ensure the normal operation of fire fighting, elevators, power distribution, central air conditioning, water supply system and kitchen equipment and facilities. Further strengthen energy management, strengthen cost awareness, improve material management, and vigorously do a good job in repairing the old, utilizing the waste and tapping the potential. Strengthen personnel training, skills training, strive for multi-functional talents, make full use of human resources, establish the idea of backstage service for front-line departments, and promote the work of by going up one flight of stairs.
Second, the key work is as follows:
1, pay close attention to the training and assessment of engineering personnel, starting from etiquette, courtesy, gfd, service awareness, service process and service quality. Improve work skills, improve work efficiency, improve work image, realize multi-function and cultivate a comprehensive mechanic;
2, strengthen the initiative and coordination with various departments, between the front desk, between the lower departments, do a good job in time, don't shirk, do more work;
3, do a good job of safety first, prevention first policy, put an end to the occurrence of industrial accidents;
4, according to the maintenance system, pays special attention to the planned maintenance of large key equipment, check and register every day, as the assessment basis for the department team;
5, establish a sense of saving, control costs, strengthen the repair of old and waste, and further reduce costs.
1) Grasp the engineering quality of maintenance work, ensure no rework, reach the operation cycle and reduce the maintenance cost.
2) Track the quality of large parts to achieve the operation cycle.
3) Strictly control external repair projects, and conduct self-study as much as possible.
4) Strengthen the maintenance of waste parts and minimize the cost of the hotel.
5) Intensify technological innovation and create new small benefits. (such as cleaning and descaling of water heaters)
In a word, no matter how big or small, doing well is the best. We believe that there is no best, only better. Only we are self-pressured, looking for the stimulation of work, full of energy for the cause, full of enthusiasm for the work, full of true feelings for the enterprise, and full of affection for customers. A comfortable hotel is bound to make its customers feel at home.
Work plan of engineering department 6
First, continue to make, revise and implement product quality standard documents.
After a period of work, I realized that there are some requirements and actual deviations in the current product quality standards, some because the standards are unreasonable and some because they are not implemented seriously. In the future, it is necessary to adjust and improve in time to ensure that the quality management work has rules to follow, and at the same time, it is necessary to strictly control the implementation, so that the product quality is as close as possible to the standard requirements until it is consistent.
Second, standardize incoming inspection work
In the past, only bulk and important raw materials were inspected, and the inspection items were not comprehensive enough and the inspection records were not complete enough. Sometimes, the poor quality of incoming materials will affect the quality of products. Since the beginning of September, all purchased bulk materials have been tested by aql sampling; Conduct a full inspection of valuables or raw materials that have a significant impact on quality; For raw materials that are difficult to verify, suppliers are required to provide quality guarantee. For all incoming inspection work, leave complete inspection records according to materials. For the abnormal quality of incoming materials, timely issue car (Notice of Abnormal Quality) to correct, and follow up the results of inspection and improvement.
- Previous article:How many hours does it take from Qian 'an to Shijiazhuang?
- Next article:Why are many hotels in Zhuji closed recently?
- Related articles
- Documentary heritage! Unfortunately, only 778 people have seen 8. 1 distracted works.
- Accommodation guide of Laoting seaside tourist area
- How deep is the swimming pool in the hotel?
- The road with the most trees in the east of Zhengzhou
- How to get to Shijiazhuang Railway Station from Hanting Hotel (Taoyuan Store)
- Brief Introduction of Nanjing E Wave House Theme Hotel
- Delicious restaurants around Hangzhou Hotel
- How to take a bus from Shapingba Xinyang Square to Casa International, No.1 Bridge in Yuzhong District?
- Why is Zhongmu Yanming Lake Villa cheap?
- What are the free scenic spots and places to catch the sea in Rizhao?