What do you mean by half-package and full-package of decoration company?

Definition of semi-package: package accessories+construction. That is, the contractor is only responsible for the construction of the decoration project and the purchase of auxiliary materials, and is generally not responsible for the design. The owner's main concern is the procurement and transportation of main materials.

Advantages: 1 You can control the quality of materials by buying large pieces of main materials yourself, which is relatively more economical.

2. In the process of semi-package decoration, the construction party can adjust the decoration style appropriately according to the specific color and shape of the items purchased by the owner, and the decoration process is relatively flexible.

Disadvantages: 1, it takes a lot of time to run into the building materials market, and it is likely to be repeatedly selected. The purchased materials do not meet the building standards and the materials are not transported in time, which may delay the construction period.

2. If you didn't do your homework in advance, you bought a lot of materials yourself, which didn't achieve the expected effect of saving money. On the contrary, there may be a phenomenon of buying low-quality products at high prices.

3. If the specific purchase items that both parties need to provide are not determined in advance in the contract, the result of buying everything may appear later, which is very passive.

Turnkey definition: design+main materials+auxiliary materials+construction. That is, the construction party is responsible for the design, construction and material procurement of the whole decoration process, and you only need to participate in the examination and determination of the design scheme and budget and the final acceptance of the project.

Advantages: 1, save worry and effort. What we need to do is to communicate with each other in time, fully let each other know their intentions, and supervise the basic progress and quality of the project.

2. Regular decoration companies have rich experience in construction and decoration, and the construction period will be much shorter than the other two methods.

3. The design, construction and material selection are all completed by the same company, and the final effect will be more complete and the style will be more unified.

Disadvantages: 1, finding a good decoration company needs to be considered in many aspects.

2. All-inclusive decoration. After the decoration drawings are approved by the owner at the beginning, the decoration will be carried out in strict accordance with the design drawings, and the chances of changing them again are relatively small. All-inclusive and semi-inclusive clearing package

It is no exaggeration to say that going through a transformation will make people mature a lot. Among them, there are not only the joy and sense of accomplishment of building a small family by hand, but also all kinds of regrets and hardships. But the most practical question is, in the face of such a decoration market, what kind of way should we choose to build our new house? Here are some suggestions, each with its own advantages and disadvantages.

All-inclusive: close the contract

Save trouble index: ★★★★★★★

Money saving index: ★

Decoration effect: ★★★★★

The so-called all-inclusive, that is, all materials and projects are contracted to decoration companies, as long as there is money.

This method is the most time-saving and labor-saving, but it is also the easiest to be cheated by bad companies.

To choose this method, we must close the contract. In addition to reviewing the rationality of various expenses, it is also necessary to indicate the brand, model and color of the required main materials, and beware of the decoration team stealing columns. At the same time, in addition to signing a unified renovation contract, you can also sign a supplementary contract with the company to clarify various rights. The specific version can be downloaded online.

In addition, we must grasp the acceptance and payment links of key nodes. If possible, we must attend every acceptance and payment. In addition, you can hire an independent supervisor to supervise the work of the construction team.

Half a pack: beware of wrangling.

Save trouble index: ★★★★

Money saving index: ★★★★

Decoration effect: ★★★★★

Compared with the whole package, the half package means that some main materials are purchased by themselves, and the decoration team buys auxiliary materials and is responsible for the project.

In the specific operation, the responsibilities of the landlord and the decoration team need to be clearly defined in advance. For example, if the floor is purchased by itself and installed by the decoration team, it is necessary to specify in advance who is responsible for the purchase fee, camphor wood block and moisture-proof pad. In addition, the materials purchased by each party must be accepted by the other party when entering the site, and the construction can only be carried out after approval.

Now many manufacturers of large materials provide installation services, which are installed by manufacturers. In case of quality problems, just keep an eye on the manufacturer, and there will be no wrangling.

Bao Qing: You must go for further study first.

Save trouble index: ★

Money saving index: ★★★★★

Decoration effect: ★★★★

The most economical way is to clear the package, that is, all the main materials and auxiliary materials are purchased by themselves, and the decoration team is only responsible for the construction and earns labor costs. Although this method is good, it will take up a lot of time. When decorating, there is basically one person in the family who is responsible for the coordination work on the construction site full-time, works as a decorator part-time and replenishes goods at any time.

Buying materials by yourself may not be satisfactory-buying building materials requires professional knowledge, so if you really want to buy good materials, I suggest you go to the decoration forum to make more bubbles and learn from previous experience. Some forums will also provide offline "renovation university" training activities, which can be attended several times before renovation to accumulate knowledge. By the time of renovation, even if you take a two-month long vacation, the saved material costs can basically offset your salary. Many websites also buy building materials, which can not only get relatively favorable prices, but also websites and netizens as third parties to supervise the quality of manufacturers.

However, the contractor's decoration team must be experienced, otherwise it will easily leave all kinds of hidden dangers, or make the decoration style of the home inconsistent, which will cause regret. What are the half-package and all-package projects that decoration companies often say include?

When decorating a house, once the price is negotiated, the designer of the decoration company will ask you whether you want to do half-package or all-package. Many customers sometimes don't quite understand, whether it is half-package or all-package, as the owner's total decoration budget, it is fixed in his heart. The difference is probably who the money comes from; But that's not the case.

First of all, what does the half package include:

1, all labor and garbage bagging costs of the demolition project.

2, build by laying bricks or stones wall all labor and material costs.

3. All labor and material costs for water, electricity and waterproofing (excluding lamps and lanterns and switch socket panels).

4, gypsum board ceiling all labor and material costs.

5. Manual and auxiliary materials for tiling (cement sand, adhesive)

6. All labor and materials of latex paint (excluding art paint, diatom mud and wallpaper).

7. Installation of switch socket

8. Installation of Hardware

9. Lighting installation

10 installation of sanitary ware

The above projects are basically semi-package projects, among which, according to their own needs and the standards of decoration companies, the brand differences of materials will be great, and the process gap will be great, so the prices will be high and low.

In fact, the concept of all-inclusive is relatively large. Generally speaking, the whole package does not include furniture and home appliances, but everything else is included. But sometimes some decoration companies will omit some things that owners are not easy to pay attention to in order to reduce the price, and finally let the owners buy them themselves. Let's talk about what might be included in an all-inclusive project:

1, half package all projects.

2. Floor tiles and wall tiles

3. Threshold stone

4. Water deflector

5. Quartz stone countertops

7, skirting board

8. Wood products and hardware products

9, doors, hardware, door cover

10, cabinet sink

1 1, basin

12, faucet

13, shower room

14, shower set

15, floor drain, angle valve, hose

16, curtains

17, lamps and lanterns

18, switch socket panel

19, empty

20, integrated ceiling

2 1, wallpaper

22. Bathroom cabinets

23. Bathroom

24, balcony window sealing

25. Other decorations

These projects are probably all-inclusive projects of decoration companies, such as some hardware, floor drain angle valves, faucets, sinks, curtains, lamps, etc., which are often ignored; As for all-inclusive projects, they are actually decided by the owners themselves. Some things can be bought by yourself if friends or acquaintances can get more cost-effective. If they go through the decoration company, someone else's company will definitely make money. If this company offers a low price, it will consider the product quality.