Tooling construction process

How to find a decoration company for commercial space decoration? Next, Yingke Decoration will talk to you about the decoration process:

1. The construction drawing should be determined in advance: it needs to be negotiated with the owner in advance, and some need to be approved by the property management bureau and some need to be approved by the housing management bureau, and the approval time is about 7 days.

2. Knocking on the wall for repair: it must be arranged before renovation.

3. Hydropower projects:

1) The acceptance of this hydropower material requires signature (customer or person in charge).

2) Check with (customer/designer) in advance when choosing ceramic tiles in construction to avoid unnecessary obscurity.

3) Wang Gong signs and takes photos for acceptance (client/person in charge)

4. Cement engineering:

1) After the kitchen is completed, we must first make the overall cabinet layout accurate (customer).

2) When the toilet is completed, the ceiling shall be accurately laid out (by the customer).

3) The completion acceptance shall be signed, which may be signed by the customer or the person in charge.

5. Woodworking project: hardware such as handle, clothes drying rod and trouser rack need to be purchased during construction.

6. Paint project: during this period, buy lamps, sanitary wares, switch panels, wallpaper, soft clothes, etc. (Such customers or tooling designers need to choose in advance).

7, water and electricity installation and maintenance health

8. Sign the completion acceptance and take photos for acceptance (client and person in charge)