Traditional Culture Encyclopedia - Hotel accommodation - How to make the soft package background wall?

How to make the soft package background wall?

One, three common soft bag background wall production process:

1, made of traditional soft bag background wall.

Pave the base first, then add a layer of 3-5 cm thick foam pad on the base, and finally use fabric or leather as decorative surface.

2. The production of soft package background wall.

Firstly, the profile is fixed on the wall according to the design requirements, and the middle is filled with sponge. Finally, cloth or leather can be inserted into the profile with a knife.

3, leather carving soft bag background wall production.

Leather carving soft bags need to be formed by high temperature hot pressing with special molds. Generally, there are two methods, one is direct paving method, which is simple to operate, but requires high smoothness of the base. The other is the mosaic method of prefabricated pavement, which is more troublesome and requires horizontal, vertical and accurate dimensions. After determining the specific method, it is necessary to make positioning marks, and then calculate the materials according to the design requirements and cut the fabric.

Second, the production method of soft package background wall:

1, paste the fabric.

If you use direct paving method, decorate the wall with fine wood first, and then brush the border after completion. You can stick the fabric only after this quantity is done. If the mosaic is paved in advance, the fabric can be pasted first. According to the design drawings and modeling requirements, first paste the filler, then fix the filler cushion on the prefabricated mosaic floor, then straighten the fabric up and down according to the positioning marks, and finally paste the fabric.

2. Decorate the sideline.

After painting, prefabricated and embedded decorative boards were installed. After meeting the design requirements as far as possible, it can be fixed and decorated with the base, and then painted with wrapping paint.

3. Trim the soft bag.

If the wall installation is in a relatively late stage, it is easier to trim the soft package. If the wall is installed first, the maintenance will be more difficult because the finished protective film has been added. At this time, it is necessary to clean up the dust and nail the nail holes and glue marks of the protective film.