Traditional Culture Encyclopedia - Hotel accommodation - How to install central air conditioning in a room

How to install central air conditioning in a room

Central air conditioning is a centralized cooling and heating air conditioning system, suitable for large offices, hotels, shopping malls, hospitals and other public places. The installation of central air conditioning requires professional construction. The following is the specific method of installing central air conditioning in a room.

1. Determine the type of air conditioning system: Central air conditioning systems are divided into air-cooled and water-cooled types. Determine the type of air conditioning system according to the size of the room and the needs of air conditioning.

2. Measure the size of the room: Before installation, first measure the size of the room and confirm the power of the air conditioner and the number of air outlets to ensure the operating effect of the air conditioner.

3. Develop a detailed installation plan: Developing a detailed installation plan is a very critical step. According to the structure and needs of the room, determine the model and quantity of air conditioners, the location and quantity of air outlets, and the direction of pipes and wires.

4. Install the air conditioning host: Before installation, you must first determine the installation location of the host. The host needs to be placed in a ventilated, dry, and unobstructed place. When installing, you need to pay attention to the distance between the host and the wall, which should generally not be less than 30 cm.

5. Install air-conditioning vents: Install air-conditioning vents according to the plan. The installation position of the air vents needs to be reasonable to ensure the circulation and even distribution of air.

6. Pipe laying: Pipe laying should be carried out according to the plan. Pipe laying should avoid leakage at bends and connections as much as possible.

7. Wire connection: To connect the power cord, you need to install a special junction box and switch, and follow the electrical safety regulations for wire connection.

8. Acceptance and debugging: After the installation is completed, acceptance and debugging will be carried out, including the operating status of the host, temperature control and air flow balance at the air conditioning outlet.

The installation of central air conditioning requires consideration of many factors. To ensure safety and effectiveness, it is best to find a professional installation company for construction.