Traditional Culture Encyclopedia - Hotel accommodation - Introduction of construction projects in puning station?

Introduction of construction projects in puning station?

Puning station, located in Liusha South Street, Puning City, Guangdong Province, belongs to Guangzhou Railway (Group) Company. It is the intermediate station and passenger station in xiamen-shenzhen railway, and the only high-speed railway station in Puning City, Guangdong Province. There are 7 main lines, arrival and departure lines and 3 platforms.

In 20 14 years, puning station * * * sent more than 0.4 million passengers/kloc-0, with an average of more than 4,000 passengers per day; During the period of 20 17 in Spring Festival travel rush, about 2 1000 passengers enter and leave puning station every day.

Puning station station scale

Stand side by side in puning station, with 7 main lines and arrival-departure lines and 3 platforms (including basic platform, second platform and cargo platform, each 1), with a total construction area of 6,000 square meters. It will be built into a whole, including railway, long-distance passenger transport, bus and taxi transfer, South Passenger Transport Station, Oriental Jade Hotel, Cultural Square and Kangmei (Puning) Chinese Medicine.

geographical position

Puning station is located in Liusha South Street, Puning City, north of Mazha Road, east of Xiangjiang Road, 30km east of Chaonan District of Shantou City, 50km west of Jiexi County, 40km south of Huilai County and 62km away from Chaoshan Airport.

Auxiliary project

The total investment of supporting projects around Puning high-speed railway station is 65.438+0.7 billion yuan. The project includes infrastructure such as the South Passenger Station, the square in front of the station, the entrance road and the public security monitoring system. By then, there will be zero transfer of high-speed rail, buses, taxis and passenger buses.

The entrance roads such as Xiangjiang Road, Square South Road, Square North Road and Zhanqian Road have been paved with asphalt pavements and street lamps, and the construction of related power supply, water supply, communication and sewage facilities has been basically completed.

The North Second Ring Road Project connecting high-speed railway station-Shanpu Expressway and Pu Jie Expressway has a planned total investment of 940 million yuan, with a total length of about 12 km, a planned road width of 60 meters and a roadbed clearing of 7 km. Most road sections have completed subgrade earthwork backfilling and cushion laying.

Puning high-speed railway station Supporting Project is not only an important supporting part of puning station, but also an important channel connecting Shanpu Expressway, Pu Jie expressway Network, National Highway 324 and Puning Avenue. After the completion of the project, it will better serve the inbound and outbound passengers and promote Puning's integration into the three-hour coastal economic circle composed of Hong Kong, Shenzhen, Zhangzhou and Xiamen, which is of great significance for optimizing Puning's traffic environment, promoting urban expansion and upgrading, and promoting Puning's construction as a capital of trade and circulation and a sub-central city in eastern Guangdong.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.