Traditional Culture Encyclopedia - Hotel accommodation - Treatment of boards passing through wires
Treatment of boards passing through wires
Installation method of electric wire for floor
When laying solid wood floor pipes, the ground should be slotted. The slotted wires should be protected by pipes, and there should be no connectors in the pipes. After the pipe is well managed, it is fixed, the ground is leveled and waterproof measures are taken before the floor laying process can be carried out. There are two concepts in the laying of solid wood floor, one is keel.
Another kind of self-leveling straight paving has little to do with the grounding of the wire of the keel. If it is self-leveling, there are two different routes. One is floor heating. If there is no floor heating, there will be a trough. If there is floor heating, you have to walk by the side. If you don't slot, you have to wear cement slurry to smooth it.
- Previous article:Where does Cujin Community belong?
- Next article:Do I have to pay for clothes when I go to Sheraton International Hotel for an interview?
- Related articles
- How far is it from Zhuankou Development Zone to Wuhu?
- What about Wuhan Yinhe Kitchen Equipment Co., Ltd.?
- Lanting Hotel Longhua
- Middle school students' winter vacation diary
- Longquan Sunshine City Jinhong Holiday Inn
- Koroke took his whole family to visit Neverland, but he never thought that there was a whole other world here.
- Hu' nan huatian hotel co., ltd. flagship shop
- The Sherlock Holmes Detective Collection, is Sherlock Holmes gay?
- How far is it from Shangqiu to Yongcheng?
- Recommended mountaineering route of Daming Mountain in Lin 'an, Hangzhou