Renovation contract mode of hotel renovation project
Contractor (hereinafter referred to as Party B)
According to the General Principles of Civil Law of People's Republic of China (PRC), Bidding Law of People's Republic of China (PRC) and other relevant regulations, and following the principles of equality, voluntariness, fairness, honesty and credit, Party A and Party B have reached the following agreement on the contracting of this decoration project through consultation.
1, project overview
1. 1 project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1.2 Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1.3 Project content: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1.4 contract scope: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1.5 Decorated building area: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2, the engineering quality
2. 1 The quality of this project shall meet the national, local or professional quality inspection standards, design standards or other standards agreed by both parties.
2.2 National, local or professional standard: Code for Indoor Environmental Pollution Control of Civil Building Engineering (GB50325-200 1).
2.3 agreed standard: qualified.
3, time limit for a project
3. 1 Total working period: _ _ _ days (calendar working period).
3.2 Commencement Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
3.3 Completion Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _.
3.4 Delayed commencement: If Party B fails to start construction on schedule, it shall notify Party A in writing three days in advance. If Party A fails to reply within three days, it shall be deemed as agreeing to postpone the commencement, and the specific commencement date shall be agreed separately. If Party A does not agree to postpone the commencement, the construction period will not be postponed; If the commencement of construction needs to be postponed due to Party A's reasons, it shall be agreed by Party B, and the losses caused thereby shall be borne by Party A, and the construction period shall be postponed accordingly.
3.5 Suspension of construction (shutdown): If Party A requests Party B to suspend construction, it shall put forward handling opinions to Party B within 24 hours, and Party B shall properly protect the completed project. If Party A fails to put forward treatment suggestions in time, Party B may continue the construction, and the losses caused thereby shall be borne by Party A. If Party B requests to resume work, Party A shall give a reply within 12 hours. If Party A fails to reply on time, Party B may return to work on its own.
3.6 the construction period shall be postponed
3.6. 1 In case of any of the following circumstances, the construction period will be postponed, and Party B will not be responsible:
(1) Party A fails to provide the starting conditions as agreed in the contract.
(2) Increase of engineering quantity and design change.
(3) Party A fails to accept the concealed works on time.
(4) Party A fails to supply the materials and equipment agreed in the contract on time.
(5) Within 7 days, the construction can't be started if the water and power are cut off for more than 8 hours for reasons other than Party B's.
(6) Party A fails to pay the project payment on time.
(7) The construction period is delayed because Party A or Party A's representative insists on the wrong instructions.
(8) Work stoppage caused by force majeure and other reasons not attributable to Party B. ..
3.6.2 In case of the above situation, Party B shall promptly notify Party A in writing; If the construction period is delayed due to Party B, Party B shall bear the responsibility and the construction period will not be postponed.
3.7 time limit for a project in advance
3.7. 1 The condition of early completion is to adopt feasible new technical measures, and any violation of process standards and cutting corners shall not be used as a means of early completion. Both parties shall sign an early completion agreement, and Party A shall approve Party B's revised schedule and new technical measures within 2 days, and provide necessary conditions for speeding up the work progress.
3.7.2 The early completion agreement shall include the following contents:
(1) in advance.
(2) Technical measures taken by Party B ..
(3) Conditions provided by Party A for implementing new technical measures.
(4) The cost of implementing new technical measures increases.
Step 4 design
4. 1 Design drawings and technical documents:
Party A provides for Party B.
4.2 Design changes
4.2. 1 When Party A requests to change the design, it shall notify Party B 2 days before the construction of the divisional or sectional works. Party B shall immediately stop the construction and preparation activities of relevant parts.
4.2.2 If Party B's materials are overstocked due to design changes required by Party A, Party A shall be responsible for handling and bear corresponding losses.
4.2.3 The losses caused by Party B's rework due to Party A's proposed design changes to the completed project shall be borne by Party A. ..
4.2.4 Design changes shall be confirmed by Party A's representative through consultation, and Party B shall change the construction progress plan, submit it to Party A for approval, and adjust the project price.
4.2.5 When design changes are involved, the design drawing provider shall provide the changed design drawings and material samples as the basis for pricing and construction.
5 project contract price
5. 1 Total contract price of this project: RMB.
Capital RMB _ _ _ _.
5.2 Project settlement: confirm the engineering quantity on site and settle according to the facts.
5.3 Payment of Project Price
Payment sequence accounts for _ _% of the total price, payment amount (yuan) and payment time.
First payment
Second payment
Third payment
5.4 Without the consent of Party A's supervisor, the quantities increased by Party B beyond the design drawings and the quantities increased by rework due to Party B shall not be measured.
6. Supply of materials and equipment
6. 1 party b shall purchase materials and equipment for this project in accordance with the requirements of design specifications, construction drawings and relevant technical data standards, provide quality and environmental protection certificates of materials and equipment products, and be responsible for the quality of purchased materials and equipment.
6.2 The materials and equipment purchased by Party A for Party B shall be notified to the other party before reaching the designated place as agreed, and both parties shall make equal acceptance of the materials and equipment. The materials and equipment supplied by Party A shall be handed over to Party B for management and use after acceptance.
6.3 The main materials of this project shall be selected by both parties. The samples are sealed after acceptance by both parties, which will serve as the material standard for material supply and completion acceptance.
6.4 The main engineering materials provided by both parties shall conform to the Limits of Hazardous Substances in Interior Decoration promulgated by AQSIQ.
7. Representatives of both parties are stationed in this project.
7. 1 The representative of Party A in this project is _ _ _ _ _ _ _ _ _.
7.2 The representative of Party B in this project is _ _ _ _ _ _ _ _ _.
7.3 The representatives of both parties stationed in the construction site of this project shall exercise the rights and perform the obligations of their respective senders according to this contract.
8. Rights of both parties
8. 1 Rights of Party A
8. 1. 1 has the right to replace the representative and supervision engineer stationed at the construction site according to the needs of the project, but shall notify Party B in writing 7 days in advance. After the replacement, the rights and responsibilities of the representative or supervision engineer remain unchanged.
8. 1.2 has the right to supervise Party B's performance of various contractual obligations.
8. 1.3 has the right to examine and approve the construction progress plan prepared by Party B. ..
8. 1.4 has the right to supervise the project quality and construction progress, and participate in materials and equipment, concealed works and completion acceptance.
8.2 Rights of Party B
- Previous article:What wine is commonly used in rural wedding banquets in northern Jiangsu now?
- Next article:Please give a name to the baby born in year of the snake. My father's surname is Wu and my mother's surname is Wei. The baby is not born yet. I don't know if it's a boy or a girl. Please give each boy
- Related articles
- How about Holiday Inn Lin Yin Hengyang?
- How many routes are there to Tibet?
- What are the delicious dishes at Fushun Hongyu Hotel?
- Want to know: How to take the bus from Hourui Station (Metro Line 1) to Aiwen School in Shenzhen?
- Where is the address of del Mare, the Royal Villa of Zhangzhou Manor?
- Where do I get off from Shenzhen Airport to Lanting Hotel in Shenzhen recently?
- Baotou Kaibin Hotel Address
- Hotel rooms at Qingdao Qianshao Hotel
- Which travel agencies received free 1-yuan garden tour tickets in Suzhou?
- What is the shuttle bus time of Baiyun Airport Huizhou Terminal?