Traditional Culture Encyclopedia - Hotel franchise - Supply agreement
Supply agreement
Seller (Party B): xxxxxxxx
According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, Party A and Party B sign this contract on the basis of voluntariness, equality, fairness, honesty and credit for the procurement of building decoration materials (hereinafter referred to as goods).
Article 1 General situation of goods used in the project
1. Project name: xxxxxxxxxx
2. Project location: xxxxxxxxxx
Article 2 Payment Terms
1. Payment according to supply quantity:
From the date of signing this contract, after Party B's payment for each supply reaches100000 yuan, Party A shall pay the payment for this batch of goods within xx days, and Party A shall pay all the payment in one lump sum within xx days after all the goods agreed in this contract are supplied.
Article 3 Method of Delivery (Delivery)
1. Delivery (delivery) method: Party B is responsible for delivery.
2. The consignee of the goods designated by Party A:
Name (house maintenance contract)
telephone
identifier
Article 4 Acceptance of Goods
1. Party B shall issue the certificate of conformity and ex-factory inspection report of the goods, present the original inspection report issued by a legal and qualified inspection agency and provide a copy; Where the production license management is implemented, the production license shall be produced; Import goods shall also provide import documents such as customs declaration forms. If Party B fails to provide the above information, Party A has the right to reject the material supply contract.
2. Party A shall check and verify the variety, trademark, specification, model, quantity and appearance packaging of the goods on the spot when the goods are handed over, and record the acceptance on the invoice and sign it. Have objections to the goods.
3. Party A has the right to request that the samples of the goods be sealed and the quality of each batch of goods be rechecked.
If the quality of the goods does not meet the agreed technical quality requirements, Party A has the right to return them.
Article 5 Other obligations of both parties
1. obligations of party a
(1) Party A shall confirm with Party B the specific time, place and consignee of delivery. Xx days in advance.
(2) Party A shall settle accounts and pay the payment according to the contract.
2. Party B's obligations
(1) Party B shall supply the goods on time, with good quality and quantity as agreed in the contract.
(2) Party B shall provide technical disclosure information on the storage and use of the goods.
(3) Party B shall clearly inform the shelf life or validity period of the supporting products.
Article 12 Other agreements
1. This contract shall come into effect as of the date of signature and seal by both parties. This contract is made in xx copies, with xx copies for Party A and xx copies for Party B, all of which have the same legal effect.
Party A: Party B:
Tel: Tel:
Supply Agreement 2 Orderer (Party A):
Signing place:
Seller (Party B):
Signature time:
According to the Contract Law and relevant laws and regulations, Party A and Party B enter into this contract through consultation.
Article 1 The breed and coat color of single pig shall be determined by both parties through consultation.
diversification
Coat color
Article 2 theme. Delivery date, quantity, weight and price:
1. Party B shall sell pig heads to Party A before _ _ _ _ _.
2. The price depends on the market situation, and Party A and Party B shall purchase according to the current market price.
3. The weight of each pig sold by Party B shall not be less than kg.
4. If either Party A or Party B delivers the goods in advance or delays the delivery, it shall notify the other party in advance, and both parties shall reach a new agreement separately, and both parties shall continue to perform the contract.
Article 3 Delivery, acceptance and settlement methods:
1. Live pigs are purchased by Party A in China and accepted by both parties face to face.
2. The payment for goods shall be paid by Party A to Party B, and settled in cash on the spot. Party A does not owe any money.
Article 4 Force Majeure
1. If either party is unable to perform or fully perform the contract due to force majeure, it shall inform both parties of the reasons as soon as possible, and after providing corresponding certificates, it may be partially or completely exempted from the liability for breach of contract as appropriate.
2 because of growth, breeding and other reasons can not be slaughtered pigs, can negotiate ahead of schedule, ahead of schedule or postpone the date of slaughter.
Article 5 Liability for breach of contract
1. During the performance of the contract, if Party A returns the goods, it shall pay Party B a penalty of 5%- 15% of the total value of the returned goods.
2. If Party A refuses to accept pigs without reason, it shall pay Party B a penalty of 5%- 15% of the value of the rejected pigs.
3. If the delivered quantity of Party B is less than the quantity stipulated in the contract, Party B shall pay liquidated damages according to the value of the delivered quantity (1%- 15%).
4. Party A has the right to refuse to sell dead pigs or other pigs harmful to health.
Article 6 Modification and rescission of the contract
When either party requests to change or terminate the contract, it shall notify the other party in time. The contract is still valid until both parties reach an agreement. When both parties reach an agreement to change or terminate the contract, they will sign a written agreement.
Article 7 Methods of settlement of contract disputes
Disputes arising from the performance of this contract shall be settled by both parties through consultation; It can also be mediated by the local administrative department for industry and commerce; If negotiation or mediation fails, it may apply to an arbitration institution for arbitration or bring a lawsuit to a people's court.
Article 8 This contract shall come into effect on _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 9 This contract is made in triplicate, one for each party and one for the record of the industrial and commercial authorities.
Party A:
Party B:
Date:
Supply Agreement 3 Party A:
Party B:
In order to ensure the timely and good supply of experimental animals, Party A and Party B have reached the following terms through consultation:
I. Responsibilities of both parties:
(1) Party A: supply animals in time according to Party B's requirements, and ensure that the supplied animals have good experimental conditions.
(2) Party B: At the beginning of each semester, provide Party A with the species, quantity and use time of animals needed in this semester; After each use, Party B shall record the use; At the end of the semester, Party B shall pay all expenses to Party A in cash according to the actual usage.
(3) During use, Party A and Party B shall take their respective responsibilities, and notify each other 1-2 days in advance in case of emergency.
Second, the price standard:
(1) Rats: 4.5 yuan/rat.
(2) Rabbits: The standard is 3-4 kg each. The average price is around 5 yuan/Jin. If the price deviation is too large, Party A shall explain it to Party B before use.
1. After the experiment, the rabbit died on the spot. The usage fee is calculated according to the current market price, and the freight is calculated according to the floating 15%.
2. After the experiment, the rabbit did not die on the spot, and the rabbit was taken away by Party A, and Party B calculated the usage fee according to 7 yuan/animal/time.
Three. This agreement is tentatively scheduled to be implemented in the first half of 20xx, and will take effect after being signed by both parties.
Party A:
Party B:
Date:
Supply Agreement 4 Buyer:
Supplier:
Through friendly negotiation between the supplier and the demander, this contract is voluntarily signed for the supplier to supply stone to the demander, so that both parties can jointly implement it.
Article 1 Overview of Demand Side Projects
Project Name: RuiJ Hotel Breakwater Project in Yalong Bay, Sanya
Construction content: According to the buyer's demand, the supplier will provide various specifications of stones needed for breakwater, sand retaining dike and revetment.
Proposed construction period: May 20XX 1 day to July 30, 20xx. Due to the need to extend the construction period, both parties shall renew the supply and demand agreement within 5 days before the expiration of this contract.
Article 2 Specification and price of stone materials provided by suppliers
Specification quantity (M3) unit price
10 ~100kg of rubble 175400
150 ~ 300 kg block stone
300 ~ 500 kg of rubble 18805
500 ~ 1000 kg block stone 17250
300 ~ 600 kilograms of stone 8900
100 ~ 200 kg block stone 9000
Gravel 9000
Two stones 3000
Total 258355
The price of the above-mentioned stone includes the expenses incurred by the supplier in the process of production, transportation and loading and unloading.
Article 3 Procurement and visas
1. The supplier must deliver the required specifications of stone to the buyer in time according to the time and place notified by the buyer's stone purchase order. The supplier must reserve enough stones of various specifications for the buyer when supplying the goods to the buyer. Within the validity period of this contract, the supplier shall not deliver the goods within 6 hours after receiving the buyer's purchase order. If it fails to do so, the supplier will violate the contract.
2. The supplier will send the stone purchased by the buyer to the weighbridge installed by the buyer, and then transport it to the construction area designated by the buyer, and submit a weighing list to the site construction party as the basis for the settlement of payment between the supplier and the buyer.
Article 4 Stone Quality Requirements
1. Before the stone is supplied, the supplier must send stone samples of various specifications to the buyer, and the buyer will submit the samples to the department designated by the owner for inspection. It can only be supplied after inspection.
2. The buyer shall keep the sealed sample sent by the supplier, and both parties shall take this sample as the acceptance basis for each supply when executing the contract. If the stone provided by the supplier is inconsistent with the sealed sample, the buyer has the right to refuse the supply of this batch of stone. The expenses arising therefrom shall be borne by the supplier.
Article 5 Payment for goods
Party A shall pay the stone payment (85% of the estimated payment) to the supplier every five days with the commencement date of the project as the starting date. When the supplier receives the payment for stone from the buyer, the supplier shall issue an invoice to the buyer.
Article 6 Liability for breach of contract
The supplier must have the production and transportation capacity to supply 3000 ~ 4000 cubic meters of stones with different specifications every day (24 hours), and deliver them in time according to the specifications of the buyer's stone purchase order, otherwise it will be regarded as the supplier's breach of contract.
Article 7 Others
This contract shall come into effect as of the date when the buyer submits the stone purchase list. This contract is made in quadruplicate, with the buyer and the seller holding two copies respectively. Matters not covered in this contract shall be supplemented by both parties through consultation, and the supplementary agreement shall have the same legal effect as this contract.
Demand side:
Supplier:
Date:
Supply Agreement V Construction Unit: (hereinafter referred to as Party A)
Supplier: (hereinafter referred to as Party B)
According to the Contract Law of People's Republic of China (PRC) and the Construction Law of People's Republic of China (PRC), based on the principle of equality and justice, the following agreement is reached by both parties through consultation for mutual compliance:
I. Project name:
Second, the place of supply:
3. Name and quantity of supply: crushed stone (subject to actual quantity) and stone chips (subject to actual quantity)
Four. Unit price and settlement method:
1. Gravel unit price: 95 yuan /m3. Unit price of stone chips: 60 yuan /m3.
2. Settlement method: 80% of the advance payment is paid, 15 working days after the entertainment project is completed.
Verb (short for verb) Responsibility of both parties:
1. Party B shall supply the materials arranged by Party A on time with good quality and quantity, and shall not affect Party A's construction.
2. Party B shall obey the dispatch and overall arrangement of Party A's site management personnel according to Party A's material demand.
3. When Party A and Party B perform the contract normally, there is no third party.
6. This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature by both parties.
Party A: (Seal) Party B: (Seal)
Signature time: Signature time:
Supply Agreement 6 Demander: (Party A)
Supplier: (Party B)
On the basis of supplying Party A with raw materials needed for construction, Party A and Party B have reached the following agreement on the principle of equality, mutual benefit and consensus through consultation.
1. Name, specification, unit of measurement and unit price of raw materials:
Second, the quality requirements:
1, the crushed stone meets the requirements of quality standards for highway building materials:
2. The materials shall be transported in the stone factory agreed by Party A. If there is any change, Party A shall be informed in advance, and the materials can only be put into use after being verified by Party A's technicians to meet the standards. The number of entries is subject to the actual entries.
3. Projects to be protected:
(1) The appearance inspection of the quality inspector shall be free of clods and other impurities.
(2) The entry materials shall not contain weathered rock, and the content of weathered rock shall not exceed 0.5%.
(3) The water content of incoming materials shall not exceed 65438 0% (except in rainy days).
Three. Place of delivery:
The place designated by Party A is, and Party B is responsible for transportation.
Four. Delivery time: Party A shall notify Party B of the quantity and arrival time by telephone or fax, and the delivered quantity shall be settled according to the actual quantity.
Verb (abbreviation of verb) price: The unit price includes ex-factory price, freight and tax.
Settlement method of intransitive verbs:
1, bank transfer or bank remittance.
2. At the time of settlement, Party B shall issue a formal invoice to the tax authorities.
Seven. Party A's responsibilities:
The materials supplied by Party B shall be inspected and measured by the quality inspector and receiver of Party A, and signed by them. Materials that do not meet the requirements of the agreement shall not enter the site. Once found after admission, Party A will investigate the responsibilities of the above-mentioned personnel, and Party B will be responsible for removing the unqualified materials from the factory.
1. Party A shall take the beating party for measurement.
2. For Party B's failure to supply the raw materials needed by Party A with good quality and quantity on time, Party A has the right to terminate the contract and impose a fine of 5% of the total payment on Party B according to the actual situation.
Eight. Party B's responsibilities:
A) From the date of signing the contract, Party B must supply the goods on time, with good quality and quantity according to Party A's notice. ..
B) If Party B has any problems during transportation, Party B shall be responsible for them.
C) If Party B opens a bill of materials or changes the mountain field without authorization, all consequences shall be borne by Party B..
Nine. Once this contract is signed by both parties, it must be strictly performed. Without the consent of the other party, neither party may change or terminate this contract. Otherwise, it shall bear all losses caused to the other party due to its modification and termination of this contract.
X any dispute arising from the performance of this agreement shall be settled by both parties through consultation. When the lawsuit is settled, both parties may bring a lawsuit to the court where Party A is located.
XI。 Matters not covered in this contract shall be settled by both parties through consultation.
12. This contract is made in quadruplicate, three for Party A and one for Party B, and a copy of Party B's ID card is attached. ..
Party A (seal): Party B (seal):
Unit representative: Unit representative:
Tel: Tel:
Date: Date:
- Related articles
- What's interesting about Gulangyu Island in Xiamen?
- How long does it take for Kuqa Shunfeng to reach Tarim Township?
- Hotel name
- How about Shanghai Megalin Tian Chun Hotel Co., Ltd.
- How to write strengths and weaknesses on your resume?
- Lily of Ma Qianli, ranghulu district, Daqing City defaulted on her salary.
- Work Report Materials of Chamber of Commerce (2)
- Is Garpais E-sports Hotel safe?
- What are the main aspects of the development of tea culture in China?
- Most of the raw materials are water bamboo, and the crests, tails, burst joints, scars, and miscellaneous branches are removed, and then the mats are made after cutting, scraping, boiling, drying, sel