Engineering Department Personal Work Summary Do you know how to write it? What achievements has been made in the work carried out by the Engineering Department in the past year, and what needs to be improved in the coming year. The following is a summary of my personal work in the Engineering Department that I have compiled for you. You are welcome to read it.

Summary of the personal work of the Engineering Department 1

In the blink of an eye, 20__ has passed quickly in the intense busyness, and the new year is about to come. Looking back on the work history of the Engineering Department this year, Summarize the work experience and lessons learned in the past year. Under the correct guidance of the company's leaders, all employees of the engineering department have the purpose of creating profits for the company, work hard at all times, and successfully complete the work assigned to the engineering department by the company as scheduled. Looking back on the past, we need to summarize and continue to make progress; looking forward to the future, the work is still arduous and long, and there is a long way to go. The following is a summary of the work of the Engineering Department this year.

1. Highlights of the Work of the Engineering Department

__The project has received attention from leaders and attracted public attention. But for now, everyone hopes to use natural gas as a new energy source as soon as possible and get rid of the current situation of queuing for gas. Natural gas entering __ is a timely rain. The construction of the __ project is solving this urgent need for car owners. Under the correct leadership of the company leaders and the efforts of the employees, the __ project was successfully completed and will be put into production soon!

2. Suggestions at work

Every time a project is received, According to the characteristics and scale of the project, the organization personnel start from the organizational structure and complete the work within the scope of the project. In order to clarify responsibilities and implement target management, the engineering department signed target responsibility letters with the heads of each responsible unit. The target responsibility letter has clear requirements for project quality, construction period, civilized construction, safe production and project cost, etc., which effectively guarantees the implementation of the renovation project.

Further understand the basic situation of the project and lay a good foundation for the construction of the project. Pay attention to personnel skills and professional knowledge, use spare time to strengthen professional knowledge training and on-site field work, and combine theory with practice. The department's overall self-knowledge has been updated, and technical work has reached a new level. In the work process, we do not rely on people to manage people, but rely on rules and regulations to constrain and standardize people's behavior. We rely on systems to urge every employee to work proactively, and truly achieve the goal of "everything is someone responsible, someone is supervising everything, and everything has rules to follow." , Everything is well documented.”

3. The direction of future work

Coordinate the relationship with other departments such as the production department and safety department of the company, and also coordinate the relationship with the outside world. The engineering department is a department in the company that communicates more with the outside world. Whether it is the construction party or the supervisor, we must mobilize their enthusiasm and use their own potential to cooperate with our work. Efforts should be made to ensure the forward-looking and advanced nature of the project, and every project should be completed based on the principle of economy to avoid unnecessary waste and duplication of construction.

Under the correct guidance of the company’s leaders, we have made greater progress in our continuous development. The process was full of hardships, and we overcame factors such as complex construction environments and cold weather, and achieved great results. This is what we expect. of. In the next step of work, we will be pragmatic and realistic, do our best for the project work, and take another step forward!

Personal Work Summary of the Engineering Department 2

Time flies like an arrow, and the sun and the moon fly by. One year is indeed a short time, and before you know it, 20 years have passed. The new year is coming again. On the occasion of the transition between the old and the new, summarize the past, think about the future, learn from the strengths of the past, make up for the shortcomings of the future, and summarize your work so that you can do better in the new year. to complete their own work.

I joined the company's engineering department in 20__ and am mainly responsible for the technical, construction and cost-related management of HVAC, water supply and drainage. In the process of work, we must abide by the company's rules and regulations, strictly demand ourselves, be honest and self-disciplined. I am conscientious and responsible at work, able to integrate theory with practice, cooperate with colleagues in the engineering department and related departments, and successfully complete various tasks assigned by the company leaders.

1. In terms of technical management

1. Be able to patiently and meticulously review drawings, and cooperate with supervisors and relevant design units to implement water supply, drainage, heating, gas and other pipes in the community. The location and direction of the network, try to find unreasonable plans and designs, put forward your own plans and ideas, actively communicate with designers, and improve the design of plans and construction drawings. For example, the Zhongrong International project has many underground structures, and the underground garage and underground civil air defense are connected to each building, which will prevent the drainage pipes of the community from being discharged in the future. Therefore, it was proposed to the leader in charge that a channel should be left between the 2#, 3#, 4#, and 5# buildings and the underground garage and underground civil air defense. Otherwise, the community drainage pipe network will not be laid. Another example: the design institute designed the heating, water supply and drainage pipelines of the connector on the Hankou Street side, but there was no place to lay so many pipelines on the Hankou Street side. After asking for instructions from the leader in charge, it raised objections to the design unit in a timely manner. After review by the design unit, the design was changed.

2. External coordination: For an engineering project, external coordination is of great help to the smooth development of the project. My main job is to cooperate with various professional companies (tap water, heating, gas) to complete the pipeline network supporting design work of the project under the guidance of the supervisor. Under the correct leadership and help of the leaders, we have maintained good cooperative relations with various professional companies. The supporting designs of various professional pipe networks are being carried out as scheduled. At present, the design of water supply and drainage pipe networks, and the design of gas and heating pipe networks have been completed. In progress. During work, we can actively cooperate with various professional designers to complete various tasks from the company's interests and perspective.

2. In terms of construction site management

As soon as I entered the construction site in April, I began to study the water use plan for the construction site with the leaders. After the plan was implemented, I assisted the leaders to complete the relevant procedures and Design work. We also cooperated with the water company to complete the construction work of temporary water supply for Zhongbaiyi Reservoir and on-site construction water, ensuring that the project started as scheduled. Before foundation excavation, with the help of leaders and colleagues, the laying of drainage pipes at the construction site was completed according to the actual conditions on site, solving the drainage problems of foundation excavation for each construction unit.

During the planning process, plastic drainage pipes were used based on the actual project. After drainage, the pipes can also be used for smoke exhaust holes, saving the company a certain amount of money. After the project entered the main construction stage, a meeting was organized in a timely manner for the supervisors and the plumbing squad leaders of each construction unit to address the hidden parts where problems were prone to occur, and clear requirements were put forward for the materials and production of waterproof casings, and problems that were likely to arise during the project were discussed. After technical briefing, each construction unit is required to prepare a model room before each process of construction. Construction can only continue after passing the inspection by Party A and the supervisor, ensuring the quality of the project.

During the construction of the project, because the supervision company's professionals sometimes do not arrive in time, they must frequently inspect and check the location and specifications of various pipelines to see if they meet the design and specification requirements. Problems should be discovered and dealt with early to avoid affecting the construction of subsequent projects. For example, raising the elevation of the drainage pipe out of the household solves the problem of the drainage pipe being too low on the Hankou Street side. During the construction management process, we can adhere to the design documents as the basis and conduct inspections in strict accordance with the requirements of the construction specifications.

3. In terms of project cost management

Be able to strictly review the construction visa on site, follow the principles of construction visa, effectively control various factors that affect the project cost, and carefully Review the materials list proposed by the construction unit and correct problems and errors in a timely manner if found.

The above are some of the work done in the past year. In the past year, some achievements have been achieved, but there are also some shortcomings. We sum up past experience and strive to correct the past work. In the future work, we will have stricter requirements. While doing our job well, we should continue to learn and accumulate, constantly ask questions, solve problems, constantly improve ourselves, and ensure high efficiency and high quality of work. Do your best for the development of the company.

Summary of the individual work of the Engineering Department 3

In ____, the Engineering Department followed the standard requirements of the hotel. Under the correct guidance of the hotel leaders, all employees of the Engineering Department worked closely with various departments. Cooperation, unity.

The Engineering Department successfully completed various tasks assigned by the hotel leaders this year, ensuring the safe operation of all hotel equipment and achieving certain good results. In this year (January-November), the Engineering Department *** Maintenance Order 1832 Zhang, 7899 items, 2638 repair items were reported by phone, totaling 10537 items.

1. Since entering ____, all comrades in the Engineering Department have been able to conscientiously convey, implement and understand the spirit of the meeting in accordance with the spirit of each relevant meeting held by the hotel leadership, and implement the spirit of the meeting into practice At work, a weekly department meeting system has been formulated to improve work efficiency and service quality. In daily work, every employee in the engineering department: sees with the eyes; smells with the nose; listens with the ears and models with hands. If equipment defects are found, eliminate them promptly to avoid future troubles.

2. At work, the employees of the Engineering Department are responsible for the maintenance of all hotel equipment, as well as the normal operation of water supply and power supply equipment. With the normal operation of the annex building rental, the normal operation of the dormitory rental Operation, hotel star rating review, the workload of the engineering department has increased a lot. The engineering department has overcome the small number of personnel and the large amount of maintenance, and has implemented the principle of compulsory repairs and repairs. Equipment that should be maintained regularly must be maintained well every day. Every piece of equipment has an owner, who inspects every day and handles equipment defects and abnormalities in a timely manner. During this year's inspection, it was discovered that the high-voltage power distribution facilities have been used for many years, the transformers are noisy, the oil level of the high-voltage oil circuit breakers is low, and the cable joints and insulation Aging, if continued to be used, can easily cause phase short circuit explosion, causing major damage to the equipment, with disastrous consequences. In order to solve this major hidden danger.

Our engineering department employees reported to the manager in time. After discussion, we formulated a maintenance and construction safety plan: processing the cable joints, adding high-voltage insulation, tightening the switch joints and busbar joints, and tightening the high-voltage Electrical distribution undergoes comprehensive cleaning and sanitation. The aging of the equipment has attracted the attention of the department, and a comprehensive inspection of other equipment has been carried out. It was found that some equipment has aged, and the cable connection points on the 7th floor and the cable connection point on the 1st floor are hot. If they continue to be used at full load, it will cause interphase A short circuit caused major damage to the equipment. After a meeting and discussion, it was decided to carry out repairs; employees had to carry out repairs in narrow places on the ceiling and low-voltage power distribution. During the process, the employees were not afraid of getting dirty or tired. They overcame all difficulties and each performed their best. The skills of each person are used to ensure the normal operation of the hotel's electrical equipment.

3. All employees of the Engineering Department are very proactive in business learning, communicate with each other, learn from each other's strengths, and continuously enhance their business knowledge. Using the meeting time, we received various trainings from the hotel’s top ten telephone calls, as well as basic knowledge of smart lock maintenance and safe operation of elevators, with special emphasis on the maintenance of facilities! The training was carried out in a planned manner and received quite good results The new employees have strengthened their business and technical learning and training, and conducted planned training, which has achieved very good results, enabling them to become familiar with various hotel equipment as soon as possible, and to be well trained to independently troubleshoot common equipment faults. Work.

4. The engineering department manager often uses regular meetings to emphasize safety and work precautions. In order to ensure the safe and normal operation of hotel equipment, it is necessary to improve the professional and technical level of employees and their ability to respond to unexpected accidents. Make accurate judgments and quickly eliminate various equipment faults to ensure the normal operation of the hotel's equipment.

5. In terms of saving energy and reducing energy consumption. According to the hotel's new requirements for the engineering department, the engineering department must be transformed into a profit department. With the support of the general manager and various departments, our engineering department first identified the hotel's water, electricity, air conditioning and other equipment and facilities that can be improved immediately and those that cannot be improved and should be considered in future renovations. Analyze and investigate, and make energy-saving plans and measures.

1. We have strengthened the management, inspection and maintenance of air conditioners. This summer, we have increased the cleaning of air conditioner cleaning nets to improve the cooling effect. At the same time, our department also flexibly controls the air conditioners according to temperature and customer sentiment. During the on and off times, set the air conditioner temperature above 26 degrees.

2. For large-power electromechanical equipment, strengthen inspections to ensure that motors and water pumps are in good operating condition, and to eliminate the phenomenon of running, popping, and leaking.

3. The downlight lighting switches in restaurants and halls are changed to segmented control. Change those that do not need to be bright during the day to individual controls.

4. The solar heat-absorbing panels are cleaned twice a month to enhance heat absorption and reduce the frequency of boiling water due to insufficient hot water. In May this year, the engineering department renovated the solar water return pipe. , reduce the loss of hot water in pipelines and make full use of solar hot water. Compared with the same period last year, gas expenses decreased by 30,000 yuan.

5. This year’s star rating review required the hotel to carry out several rectification and maintenance projects. The engineering department undertook this project, saving the hotel tens of thousands of dollars.

The hotel has implemented a daily report system for the operating equipment of the engineering department. It conducts combined analysis of the operation monitoring statistics of water, electricity and other equipment with the room occupancy rate every day. If any abnormalities occur, the reasons will be found immediately to strengthen the awareness of energy conservation.

Over the past year, all the comrades in our engineering department have done their best to do a lot of work for the hotel. They can take the initiative to do both within and outside their duties. However, some tasks are not in line with the requirements of the leaders. There is a certain gap. We are determined to seriously summarize the gaps that have existed in the past year in our future work, further improve the ideological quality and personal skills of each employee, and make further contributions to our hotel and to the third-level hotel.

Engineering Department Personal Work Summary 4

The end of the year is here in a blink of an eye, and the new year is immediately ushered in. At the end of the year, I would like to make a detailed summary of the work I have done in the past year.

At the beginning of this year, a detailed inspection and maintenance was carried out on the entire fire protection system of this building. A comprehensive and detailed inspection was conducted on fire fans, fire water pumps, fire broadcasts, gas fire extinguishers and the overall automatic fire alarm system. Each system unit is tested one by one for control, alarm, and information feedback. During this test, it was found that some fans, smoke detectors, water pumps and fire dampers were faulty. Afterwards, we immediately summarized the existing problems and arranged repairs. During this maintenance, some faults were historical issues that had not been resolved for many years. Our professionals will actively check the information and immediately repair the root cause of the fault. Some faults cannot be repaired by our professionals. After confirming the fault, we will immediately contact the manufacturer and ask the manufacturer to send someone to repair or replace it. During this inspection, testing, and maintenance of the fire protection system, the largest workload was the maintenance of fire dampers throughout the building. Fire dampers are generally installed at the inlet and outlet of air ducts. There are a large number of valve bodies in the stuffy roof. Whenever a valve body is repaired, the maintenance personnel always have to carry a high ladder. Either they work on the high ladder or they have to do it themselves. Drill into the roof for construction. The seemingly simple work is actually very difficult to repair, and sometimes the entire fire damper has to be dismantled and then reinstalled in its original position after repair. At this time, the system alarm test of the faulty valve must be carried out. After confirming that the fault has been eliminated, the next maintenance shall be analyzed and summarized, and maintenance records shall be made. According to statistics, during this maintenance, more than 20 fire dampers in the building were overhauled.

As the popularity of the building increases, some well-known large companies have also begun to move into the building, including Japan's Carbio, China TravelSky, Hitachi, etc. In order to generate income for his own company, this professional actively undertook the comprehensive wiring work of the company he stayed in. This also paved the way for the overall wiring level of the building and quick inspection and maintenance in the future. During the wiring construction of these companies, our professionals took the initiative to work overtime and made great efforts to ensure that the construction was completed on time. During the construction process, some wire troughs were in the ceiling, and the wiring personnel had to get into the ceiling and guide the wrist-thick cables from the floor room to the user's computer room and equipment room along the bridge. , may cross this user rental area in the middle. It can be seen that the difficulty of construction is very great, and the construction quality must be ensured with few professionals. In the correct integrated wiring construction, because the customer is special, the wiring requirements It is very strict and requires four long-distance optical fibers to be led to the user's computer room. In actual construction, the first problem is to protect the optical fiber and penetrate the meter-long optical fiber into the sheathed wire. This kind of work is very difficult. Through the efforts of all the staff in this profession, the pipelines were finally threaded skillfully and completely, and the project was finally submitted on time and received the customer's approval.

During daily maintenance and inspection, in order to quickly troubleshoot various equipment faults, our professionals first conducted a detailed inventory of the fire protection system in the building, and then printed out all the module address labels, checked and pasted them one by one. Label.

This job is actually very time-consuming. First, you must confirm the actual installation address of the module from the fire host, and then bring a ladder to the site. Fire protection modules are often installed at the top of the room. The professional has to climb up to the roof, search for the module in the roof, and after finding it, make sure it is consistent with the host label and put the label on it before leaving. After nearly a month of hard work, more than 800 small points in the building were checked one by one and labeled.

At the same time as these works were being carried out, inexplicable malfunctions occurred in the security system. Multiple loops are always disconnected without regularity. After this kind of failure occurs, the security monitoring system fails and the patrol system cannot work normally. Our professionals immediately carried out emergency repairs on the entire security system. After many efforts and the manufacturer's assistance, the fault was finally confirmed and the system equipment was replaced. In this difficult fault confirmation work, it took more than a month of professional work to finally restore the security system to normal.

Because it has been more than two years since the building was built this year, the fire probes in the building should be cleaned once according to fire protection system regulations. Before cleaning, there were indeed a small number of smoke alarms that falsely reported fire alarms that could not be reset and eliminated immediately, which had a certain impact on the fire protection system. So the professional immediately outsourced manufacturers to clean the smoke and temperature sensors in the building. The workload of cleaning smoke sense is huge. Because there are nearly 2,000 smoke and temperature detectors in the building, each one requires climbing a ladder or pushing a lift. Our professionals overcame the difficulty of a small staff and a large workload. After more than a month of hard work, they finally removed the smoke and temperature sensors in the public area and a small part of the rental area in the building and sent them to be cleaned and labeled one by one. Good record. After statistical analysis, more than 100 smoke detectors have been cleaned. Then, in the automatic fire alarm system, they were closely observed and smoke tests were conducted one by one. In the next two or three months, minor faults in the smoke and temperature sensors returned after cleaning were immediately repaired to ensure that there was no fault in the fire protection system.

When I look back on these past events, it’s like yesterday. After more than a year of hard work, our professionals’ contribution to the entire company or the entire building is visible to everyone. But for now, despite the hard work done in the past, new problems are always emerging and new faults are always occurring. Professionals like me will continue to work hard at their posts, create a safer, more comfortable and more ideal office environment for our company and our customers, and raise our banner of First Pacific Raytech high in the property circle.

Engineering Department Personal Work Summary 5

Time flies and 2021 is fleeting. Under the correct guidance of the engineering department manager and company leaders, with the active cooperation and cooperation of colleagues and various departments, With strong support, I successfully completed various tasks of the company and other tasks assigned by the leadership. Recycle the past and look forward to the future, in order to work to a new level in the new year and better complete the company's various work indicators, the summary is as follows:

1. Work Summary

< p> 1. I am mainly responsible for the procedures for reporting the start of the project to the quality supervision station, reporting structural engineering during the construction stage, reporting for completion acceptance of the main body of the project, on-site construction management of the project department, and applying for night construction permits; Deal with the remaining problems of the project, arrange maintenance and customer return visits in a timely manner for existing housing quality problems; assist the construction company's construction department to handle the declaration work of __ building, __ building ___, __; on-site management and visa processing Collect, handle, and coordinate related matters with the District Law Enforcement Bureau.

2. In accordance with the national policy on energy-saving return, prepare all materials related to energy-saving and submit them to the district energy-saving office, and successfully apply for the return of energy-saving subsidies of more than __ million yuan.

3. Handling the completion procedures of the project

(Transfer all civil engineering, water and electricity data of the __ building to the archives, coordinate the budget department to handle the completion settlement of the Yaju Garden project, and report to the government affairs department Apply to the lobby window and handle the completion filing form. This work requires more than __ million yuan and has been reported to the leader;

(2) All civil engineering, water and electricity data of the building will be handed over to the archives, and coordinated with the budget department_ For the completion settlement of the building project, report to the window of the Government Affairs Hall and apply for the completion registration form. This work is currently being coordinated because the insulation material did not pass the fire acceptance inspection.

4. Construction site management: Mainly supervise the construction of city projects in strict accordance with relevant national laws, regulations and standards, implement quality supervision and technical management of the project, be responsible for the safe and civilized construction management of the project site, and ensure There were no safety incidents such as major casualties. Coordinate technical changes and organize on-site visa work for engineering projects, and do a good job in acceptance of the main body and sub-projects of the project.

5. Project progress: The engineering department is the department in charge of production progress. The speed of project progress directly affects the nerves of every employee in the engineering department. Whether it is the project progress indicators signed by the project department with the company at the beginning of the year, Whether it is the house sales contract signed by the company to the customer, it invisibly urges the engineering department to speed up the construction progress. To this end, the Engineering Department makes every effort to do every job for the rapid advancement of project construction. The Engineering Department's management functions for the construction progress are mainly reflected in the preparation, adjustment, execution, correction and guarantee measures of the production plan. The construction process of the project is a very complex production activity. Not only does it include organizing thousands of professional construction workers of various types and a large number of various types of construction machinery and equipment to be put into project construction in an orderly manner, but it also includes organizing a wide variety of buildings weighing tens of thousands or even hundreds of thousands of tons. Production, transportation, storage and supply of materials, products and components, organizing the supply, repair and maintenance of construction machinery and equipment, and arranging various temporary buildings required for production and life at the construction site. The organization and coordination of these tasks are of great significance to carry out project construction quickly, efficiently and cost-effectively.

2. Work plan for next year

2021 is an extraordinary year. Through the joint efforts of all employees, the company has achieved comprehensive success in all its work and can It is said that it has made rapid progress and achieved fruitful results, with all operating indicators hitting record highs. In the new year, I will continue to accumulate experience, work hard with all my colleagues, work diligently, study hard, strive to improve cultural quality and various work skills, and dedicate myself to a better tomorrow.

Engineering Department Personal Work Summary 6

__ year is about to pass, and the new year is coming. Standing at the end of the year and the beginning of the year, looking back on the work of the past year, I have many feelings. I would like to report to the company leaders and colleagues the work summary of __ and the work plan for 2021.

1. Review of work in __ years

(1) Main work content:

1. Coordinate the working relationships between the company’s functional departments in construction management, Such as: related work between design, bidding, business, planning, materials, property, administration and other departments;

2. Organize and coordinate the construction tasks and construction management processes of all participating units, such as:

3. Coordinate construction management relationships among various disciplines, such as organizing and coordinating professional construction process disclosures, on-site work surface handovers, and technical disclosures etc.;

4. Assist in resolving industry requirements and mediating interference with project construction, such as contacting government industry authorities, dealing with villagers interfering with project construction, and handling construction workers making trouble, etc.;

5. Implement the work responsibilities and working relationships of all professional engineers in the engineering department and supervision units, such as: clarifying the work content of each department, clarifying the work responsibilities of each professional engineer, organizing tasks for professional engineers, explaining processes, and establishing work relationships among professional engineers Contact and coordinate the construction relationships between various disciplines;

6. Responsible for arranging and implementing all mechanical and electrical projects in municipal and housing construction, such as: water supply and drainage, electrical, HVAC, gas and other mechanical and electrical installations for all participating units ;

7. Responsible for arranging and implementing all civil construction and water and electricity projects in the villa area, such as masonry, waterproofing, water and electricity, doors and windows, etc.;

8. Responsible for arranging and implementing model houses and Fine decoration projects for public buildings, such as: preliminary decoration work for high-rise model houses, villa model houses, sales departments, corporate clubs, golf clubs, etc.;

9. Assist in the implementation of municipal roads and water systems, greening, Various construction links of fences and other projects, such as: water and electricity, site and related water and electricity construction, etc.;

10. Assist in the implementation of daily maintenance and rectification work in the building;

11 , Responsible for the use and charging management of water and electricity;

12. Participate in the formulation of schedules, quality control, safety management, technical plan review, bidding cooperation, contract review, project payment review, etc.;

(2) Summary of the above work content

In the past year, we actively responded to the company’s leadership in terms of project progress, quality, cost control, coordination, cooperation and other management aspects. instructions, conscientiously implement every job, and devote yourself to the work diligently and wholeheartedly.

But at the same time, the conventional management model has been changed, and the emergency work ability has been greatly improved, and the ability to deal with construction problems has been greatly improved. Measures have also accumulated certain experience

2. Experience

(1) The impact of design and construction on the project

Tianlong Sanqianhai Project, With high positioning and quick start, the purpose is to build domestic and foreign real estate and seize the market. Under this circumstance, the Sanqianhai project entered the construction stage too hastily. In the actual construction industry, the planning stage, preliminary design stage, design stage, and construction stage , every item in the completion and verification stage is very important, especially the engineering design is the most important engineering document to guide the implementation of the project, and the Sanqianhai project started construction in a hurry without careful design review, and the phenomenon of design and construction at the same time From this, for example, changes began to occur from the early stage of piling, and later there were many versions of design drawings for curtain walls, water, electricity, water systems, gardens, decoration, etc., and there were many projects that were repeatedly deepened, and many of them were even constructed based on imagined on-site disclosures. The important guiding role of drawings has been lost. There are many projects that occur sporadicly, resulting in frequent disconnection between design and construction. Many construction tasks are handed over and implemented in a hurry, resulting in more errors and affecting the direction of the entire project. The forward movement has a greater impact and also makes construction management very difficult.

(2) The impact of deficiencies in the budget form on construction management (quota labor)

(3) Planning objectives

(4) Materials

3. Constructive opinions

(1) Establishment of management structure system

(2) Management personnel configuration, tasks and responsibilities

(3) Enterprise Management Measures (Manual)

(4) Management of Supervision Units

(5) Management of Construction Units