As far as hotel decoration design is concerned, the design fee charged by general design companies is 150 yuan, which is relatively expensive in decoration, as follows:

A, bricklaying:

1. Floor tile laying: 30 yuan/m2 (cleaning time)

2. Wall tiles: 30 yuan/m2 (clean)

3. Brick skirting line: 12 yuan/linear meter (cleaning accessories)

2. Contractor (contractor, contractor): 1 10 yuan/meter.

Third, do waterproof:

1. Waterproof cleaning: 30 yuan /m2.

2. Waterproof contracting material: 55 yuan /m2.

Four. Wall painting (contractor): 1, Meishili: 20 yuan/square meter.

2. Dulux (second generation) five in one: 26 yuan/square meter.

3. Dulux Gold Full Effect and Nippon Hardcover Full Effect: 28 yuan/square meter.

4, Dulux Haolang full effect, Nippon hardcover net taste full effect: 33 yuan/square meter

5. Wall sticker: 8 yuan/m2 (common)

Five, metope grassroots processing:

Packing: 22 yuan/m2, with Meichao Yiping YGP800 putty.

Cleaner: 16 yuan/m2

Gypsum leveling 15/ m2 (local), gypsum line (contractor and contractor): 15 yuan/yanmiqi. Ceiling:

1. gypsum board flat roof (contractor): 90 yuan /m2.

2. Gypsum board formed roof (including lamp pool formed roof) (contractor and contractor): 130 yuan /m2.

3. Gypsum board linear ceiling (contractor): 80 yuan/Yanmi 4. Aluminum gusset ceiling (contractor): 1 10 yuan/m2.

5. Lifting steps of aluminum gusset plate (contracting for work and materials): 80 yuan/Yanmi.

6. Plastic-steel ceiling (contractor and contractor): 80 yuan/m2.

7.PVC ceiling (contractor and contractor): 60 yuan /m2.

Eight, do partition:

1. Lightweight steel keel gypsum board partition wall (contractor and contractor): 90 yuan /m2.

2. Lightweight brick partition wall (contractor and contractor): 120 yuan /m2.

Nine, waterway reconstruction:

1. Ming Guan (contract and materials): 45 yuan/Yanmi.

2. Concealed pipe (contractor and contractor): 55 yuan/Yanmi X. Circuit transformation:

1. Opening (contract and materials): 25 yuan/Yanmi.

2. Hidden line (contractor): 35 yuan/Yanmi.

XI。 Other projects:

1, wall smashing: 30 yuan /m2 (cement precast hollow slab wall) 45 yuan /m2 (brick wall) 80 yuan /m2 (reinforced concrete wall).

2. Garbage removal: 200 yuan/household (two-bedroom) refers to the labor cost of moving to the designated place of the property, excluding foreign transportation.

3. Lighting installation: 200 yuan/household (two-bedroom) is labor cost.

4. Hardware installation of sanitary ware: 200 yuan/household (two bedrooms)

5. Thermal insulation wall cement board, embedded with polystyrene board or rock wool (contractor and contractor): 120 yuan/Ping.