Traditional Culture Encyclopedia - Hotel franchise - How much is the hotel decoration design per square meter?
How much is the hotel decoration design per square meter?
A, bricklaying:
1. Floor tile laying: 30 yuan/m2 (cleaning time)
2. Wall tiles: 30 yuan/m2 (clean)
3. Brick skirting line: 12 yuan/linear meter (cleaning accessories)
2. Contractor (contractor, contractor): 1 10 yuan/meter.
Third, do waterproof:
1. Waterproof cleaning: 30 yuan /m2.
2. Waterproof contracting material: 55 yuan /m2.
Four. Wall painting (contractor): 1, Meishili: 20 yuan/square meter.
2. Dulux (second generation) five in one: 26 yuan/square meter.
3. Dulux Gold Full Effect and Nippon Hardcover Full Effect: 28 yuan/square meter.
4, Dulux Haolang full effect, Nippon hardcover net taste full effect: 33 yuan/square meter
5. Wall sticker: 8 yuan/m2 (common)
Five, metope grassroots processing:
Packing: 22 yuan/m2, with Meichao Yiping YGP800 putty.
Cleaner: 16 yuan/m2
Gypsum leveling 15/ m2 (local), gypsum line (contractor and contractor): 15 yuan/yanmiqi. Ceiling:
1. gypsum board flat roof (contractor): 90 yuan /m2.
2. Gypsum board formed roof (including lamp pool formed roof) (contractor and contractor): 130 yuan /m2.
3. Gypsum board linear ceiling (contractor): 80 yuan/Yanmi 4. Aluminum gusset ceiling (contractor): 1 10 yuan/m2.
5. Lifting steps of aluminum gusset plate (contracting for work and materials): 80 yuan/Yanmi.
6. Plastic-steel ceiling (contractor and contractor): 80 yuan/m2.
7.PVC ceiling (contractor and contractor): 60 yuan /m2.
Eight, do partition:
1. Lightweight steel keel gypsum board partition wall (contractor and contractor): 90 yuan /m2.
2. Lightweight brick partition wall (contractor and contractor): 120 yuan /m2.
Nine, waterway reconstruction:
1. Ming Guan (contract and materials): 45 yuan/Yanmi.
2. Concealed pipe (contractor and contractor): 55 yuan/Yanmi X. Circuit transformation:
1. Opening (contract and materials): 25 yuan/Yanmi.
2. Hidden line (contractor): 35 yuan/Yanmi.
XI。 Other projects:
1, wall smashing: 30 yuan /m2 (cement precast hollow slab wall) 45 yuan /m2 (brick wall) 80 yuan /m2 (reinforced concrete wall).
2. Garbage removal: 200 yuan/household (two-bedroom) refers to the labor cost of moving to the designated place of the property, excluding foreign transportation.
3. Lighting installation: 200 yuan/household (two-bedroom) is labor cost.
4. Hardware installation of sanitary ware: 200 yuan/household (two bedrooms)
5. Thermal insulation wall cement board, embedded with polystyrene board or rock wool (contractor and contractor): 120 yuan/Ping.
6. Ground leveling (contract and materials): 24 yuan/m2.
- Related articles
- Hotel weak current system construction scheme?
- Is it convenient for Huizhou Shanhai Lanting to take the bus? How to calculate the floor area ratio?
- What is the charm of falling in love with the gambling king Stanley Ho and letting Jet Li lay down his life to love Nina Li Chi?
- Can I send it by express during the quarantine period?
- Are there any short-term rental family apartments in Hangzhou? Where can I find them? What is the price environment like?
- How about auspicious Qian Shan? OK or not? Is it worth buying?
- The antonym of temperature
- Has Enshi Lichuan Tianzong City Belt been decorated?
- What is the mode of transportation in volcanic island?
- How to get from Shaoxing East Station to furama hotel, Ke Qiao?