Traditional Culture Encyclopedia - Hotel franchise - How to install the water pipes in the hotel bathroom?
How to install the water pipes in the hotel bathroom?
2. Inlet water shall be equipped with an indoor master valve. Before installation, check the water pipes and connectors for damage, sand holes and cracks.
3. The installation position of the water meter should be convenient for reading, and the distance between the water meter and the valve and the wall should be appropriate for easy use and maintenance.
4. If there are water softeners, water purifiers and kitchen treasures in the kitchen, it is necessary to consider reserving the location of water supply and water supply in advance.
Both cold water pipes and hot water pipes are plugged into the wall. Check the groove depth when slotting, and the hot and cold water pipes cannot be in the same groove.
6. The shower mixing valve is positioned right and left, installed in the middle of the bathtub (determine the size of the bathtub first), and the height is on the bathtub 150-200mm. The outlet of the jacuzzi is reserved according to the model. The hole spacing of the mixing valve is generally kept at 150mm (concealed installation) and 100mm (exposed installation). The outlet position of connecting rod shower should be determined according to the height of the room and the personal needs of the owner.
7. The water inlet and outlet of the toilet should be placed where it can be blocked by the toilet. One-piece toilet should be located at the outlet according to the model, and generally should be left at the middle of the lower outlet of the toilet 200 mm.
8. Electric water heaters generally need to be fixed on the load-bearing wall. In case of special circumstances, it needs to be fixed on the non-bearing wall, and there should be enough places on the top floor to fix it. It is necessary to communicate with the water heater manufacturer in advance to determine the location of the water heater outlet.
9. When installing the water inlet and outlet of the water heater, the water inlet valve and air inlet valve must be considered and installed in corresponding positions.
10. When installing kitchen and bathroom pipes, the final size of wall tiles should be considered when the pipes leave the wall, that is, the thickness of wall tiles should be considered in advance.
1 1. When designing water pipes, the installation position of washing machine faucet and the layout of launching water should be considered. At the same time, pay attention to whether the location of the power socket is appropriate. Put the drum washing machine in the cupboard. Be sure to determine the size of the washing machine and kitchen cabinet in order to maintain a good water supply and discharge position.
- Related articles
- What exciting hotels are there in Shaodong?
- How to reply to an invitation letter to a full moon party
- Dreaming about staying in a hotel on a business trip is a sign
- Customize the wardrobe door. What handle looks good?
- Best diving time on the island of Thailand
- How about Heilongjiang Peng Yun Hotel Management Co., Ltd.
- How far is Dazhongsi Station from Hui Jin International Business Conference Hotel?
- Which railway station is the Hilton World Trade Center in Tianjin Eco-city near?
- Which decoration company is good? Recommended by Top Ten Decoration Companies
- What's the contact number of Shajiao Castle?