Emergency plan for typhoon prevention of residential property

202 1 Model essay on typhoon emergency plan for residential property (5 general articles)

In daily study, work and life, there may be some unexpected accidents. In order to improve the awareness of risk prevention and minimize losses, it may be necessary to make emergency plans in advance. How to write an emergency plan? The following is my collection of 202 1 model articles on typhoon emergency plans for residential properties (commonly used 5 articles), for your reference only, and I hope it will help you.

Emergency Plan for Typhoon Prevention of Residential Property 1 In order to do a good job in typhoon prevention, the Emergency Plan for Typhoon Prevention of Hotels is revised and issued, and all hotels are requested to comply with it.

I. Organizational structure and responsibilities

The hotel set up the emergency headquarters for flood prevention and typhoon prevention. When the typhoon comes, all members of the headquarters must immediately do a good job in flood prevention and typhoon prevention and hotel duty. The organization is as follows:

Commander-in-Chief: Executive General Manager of the Hotel

Deputy commander: the general assistant in charge of safety work in the hotel.

Member units: Housekeeping Department, Catering Department, Front Office Department, Engineering Department, Security Department and Finance Department.

Second, the typhoon prevention program

(1) Pre-typhoon self-inspection preparation

1. Front hall: collect decorations such as banners, lanterns and POP bulletin boards at the door; Put a typhoon information bulletin board in the lobby or elevator entrance, and prepare a typhoon reminder card to the housekeeping department for distribution into the room; Prepare umbrellas and rain gear. Every employee at the front desk should know the typhoon information, answer the guests' inquiries in time, and prepare the emergency lighting at the front desk. The lobby assistant should set up a post in the lobby, do a good job of customer inquiry, pay attention to the situation at the door and lobby and report in time to ensure the normal business order of the lobby.

2. Housekeeping Department, Catering Department and Finance Department: Check and close the doors and windows of all rooms, boxes, walkways and corridors; Do a good job of typhoon prevention for guests, and inform housekeeping department to equip rooms with typhoon warning signs; Prepare emergency lighting;

3. Operator: responsible for understanding the typhoon situation and reporting to hotel leaders and relevant departments in time; Prepare emergency lighting and walkie-talkies, check whether the standby power supply of the switchboard works normally, provide emergency service for power failure under the guidance of the department manager, and do a good job in guest inquiry service.

4. All departments should prepare for the loss of linen 1 day in advance in case of emergency.

5. The Engineering Department will conduct a comprehensive inspection of the hotel periphery, platforms, neon lights, billboards, satellite receivers, doors and windows of various business departments and tenants, and reinforce them with wires, ropes and wooden stakes. And temporarily dismantle the unstable store. Check the important parts such as the underground electrical room, strengthen the hotel door, and cut off the circuit that may cause fire due to short circuit. The pool should be filled with water to ensure the normal supply of water, electricity and gas in the hotel, and sufficient sandbags should be prepared.

6. The comprehensive office is responsible for conveying typhoon information to all employees of all departments, and arranging the heads of all departments to stay in the store for duty.

7. The security department informs the dormitory security guards to be diligent, and cooperates with the engineering department to check whether the sewers and ditches in key parts such as the periphery and roof of the hotel are unobstructed, and prepare lighting appliances, rain boots and raincoats, helmets, flashlights and emergency lights.

(II) Re-inspection: The heads of the General Office, Engineering Department and Security Department shall re-inspect the preparations of all departments according to the above provisions.

(3) When the wind is strong, emergency procedures should be started:

1. The heads of the security department and the engineering department should stay in the hotel, deal with sudden dangers at any time, and ensure that there are enough manpower and material resources to do emergency maintenance and remedial work.

2. If there is water seepage in guest rooms, boxes, linen, drinks and food warehouses, subordinate departments should immediately transfer the contents of the rooms to a safe place, and the engineering department should do a good job of plugging and drainage.

3. The rainwater at the front door may flow backward into the lobby, and the security department and the engineering department will pile sandbags at the door to prevent the inflow. PA class is responsible for sending additional personnel to clean up the accumulated water.

4. Rain from the back door may flow back into the employee elevator. The security department and the engineering department will pile sandbags at the back door to prevent the inflow. The security guard at the back door post is responsible for removing stagnant water. If the rainwater has flowed backward into the elevator, the engineering department should immediately control the elevator to the floor above 1F, and it is forbidden to let the elevator run to-1f-2f.

5. When the wind is strong, the front door and back door should be reinforced with wooden plugs and boards to prevent the glass door from being damaged by the wind. When strengthening, some glass doors should be kept open properly to reduce the wind resistance to the glass doors. The front door glass should be the responsibility of the bellboy and the foreman of the security department. The rear door glass is guarded by the security guard at the rear door post.

6. When the wind is strong, the porter of the past security guard should pay attention to falling objects and guide the guests to park their vehicles in the underground garage. They should wear safety helmets when necessary. The desk lamp and flowerpot placed at the front desk should be put away in the front hall to avoid being blown down by the wind.

7, if there is water in the elevator, the engineering department should immediately start the drainage system, eliminate water, so as to avoid if the wind is strong and the passenger elevator can't run, the dining room screen should be pushed to the elevator.

8. In case of power failure, the Engineering Department will immediately contact the Property Office to generate electricity and restore lighting. The security department maintains the security order of the hotel during the power failure. In case of power failure, the restaurant manager is responsible for taking care of the cashier in place, and the cashier at the front desk is the responsibility of Qianmen Gang and Security Department 02 or 0 1. The assistant manager of the lobby, 0 1 02, should provide elevator service, ask if there are any detained guests and do a good job of comforting them. Floor staff and department managers should be dispersed to all floors and restaurants to explain and appease the guests.

9. When the drainage ditch is blocked, the Engineering Department and the Security Department will send someone to dredge it. Dredging personnel should pay attention to their own safety and must wear safety helmets. If necessary, you should wear a safety rope, and two people should cooperate with each other in tandem. Pay attention to whether the electrical equipment on the roof equipment floor has leakage.

10, when the wind is particularly strong, the office should be responsible for informing the dormitory staff not to go out, and the staff living outside the store should arrange to stay in the hotel. The heads of offices and departments should discourage off-duty personnel from leaving the hotel, and the office should make accommodation arrangements for stranded personnel.

1 1. The switchboard is responsible for understanding the typhoon situation through TV and reporting the typhoon situation to the heads of various departments in time. If the airport, expressway and bridge are closed, they should report to the front hall in time, and the front hall should inform the hotel guests in time.

12. The executive general manager of the hotel, the manager of the engineering department and the manager of the security department should stay in the hotel to make emergency preparations. Whether other department managers stay in the hotel or not shall be subject to the hotel arrangement, and if they leave the hotel, they shall be reported to the hotel administrative director for approval.

(four) after the typhoon caused hotel losses, all departments should summarize and report the losses within two days.

Emergency plan for typhoon prevention of residential property 2 In order to do a good job in typhoon prevention of my construction site, reduce disaster losses and ensure personal and property safety, the emergency response plan of this project department is formulated in accordance with the spirit of the People's Republic of China (PRC) Safety Production Law and relevant documents of the District Construction Bureau, combined with the reality of our company.

First, the basic principles of emergency treatment

(1) This plan is the basic procedure and organizational principle for emergency treatment when the construction site is attacked or affected by a typhoon.

(two) the implementation of emergency treatment to follow the principle of unified command, responsibility, prevention first, rescue first, rapid response, to ensure safety.

Second, the organization and the responsibilities of the supervisor

The project department set up a leading group for typhoon prevention on the construction site.

Team leader: Zhu Jiahua, project manager.

Deputy team leader: Dai Jinquan, deputy manager of the project department, and Zhou, technical director.

Members: Zhang Hua, safety office of the project department, Cai Baobin, quality engineer, Zhang Jianhu, builder and other relevant personnel.

Main responsibilities:

(a) responsible for formulating and revising the emergency plan for typhoon prevention in construction projects;

(2) Before the typhoon comes, inform the construction site to do a good job of typhoon prevention, check the reinforcement of safety facilities on the construction site, and evacuate and transfer workers;

(three) arrange personnel on duty, check the construction site, immediately organize rescue and rehabilitation work, maintain close contact with the higher authorities, and report the emergency treatment at the scene of the accident at any time;

(four) after the typhoon, responsible for convening relevant personnel to summarize the emergency handling of the accident.

Third, the implementation of the plan

(1) received the news released by the Meteorological Observatory, which is expected to be affected by the typhoon:

1, the site project management department issued a typhoon prevention notice, and the relevant personnel of the project department paid close attention to the weather news and the typhoon trend;

2, the project intends to inform the relevant personnel and team, require all staff to cooperate closely, do a good job in the preparations for typhoon prevention.

(two) the typhoon approaching our city will affect our region within 48 hours, and the Meteorological Observatory will issue a typhoon warning:

1, the project department arranges the construction reasonably and stops the process that must be continuously constructed;

2, the project department should cooperate with the branch to do a good job of safety inspection before the typhoon, including whether the construction elevator is firm, scaffolding and other facilities are firm, whether the temporary work shed is safe, etc. And take measures to strengthen and eliminate potential safety hazards.

(three) there may be a typhoon in our area within 24 hours, and when the Meteorological Observatory issues an emergency warning:

1, the typhoon prevention leading group of the project department is in place, and personnel are arranged to be on duty;

2. The construction site stops and the construction personnel are evacuated to safety;

3, the project intends to organize personnel to patrol the scene, cooperate with the company's leading group to further check the implementation of various defensive measures, and ensure that the on-site rescue team is in place and in a state of war;

4. During the typhoon, the safety accidents with casualties on the construction site shall be implemented in accordance with the Company's Emergency Rescue Plan for Major Safety Accidents in Construction Projects.

Emergency plan for typhoon prevention of residential property 3 In order to reduce the losses caused by natural disasters, prevent the occurrence of major sudden dangers and ensure the safety of life and property of enterprises and employees, a typhoon prevention and flood control working group is specially established:

(1) Organizational structure and responsibilities

1. Chief Commander: The general manager of the company is mainly responsible for the personnel arrangement of typhoon prevention and flood control organizations and the overall arrangement of typhoon prevention and flood control work;

2. Team leader of typhoon prevention and flood control: the person in charge of the comprehensive office is fully responsible for typhoon prevention and flood control during typhoon prevention and flood control, timely adjust personnel and materials as needed, and inform the commander-in-chief and the competent government departments within 24 hours;

3. Members of typhoon prevention and flood control team: obey the arrangement of the leader of typhoon prevention and flood control team and do a good job of typhoon prevention and flood control under the leadership of the operation chief;

4. Logistics support: responsible for logistics support during typhoon prevention and flood control, and organizing personnel to evacuate safely in case of emergency; During typhoon prevention and flood control, as a temporary command center, it is responsible for external communication with government departments and supervisors to ensure timely and accurate information transmission;

5. Power group: responsible for normal power supply and power generation at any time during typhoons and flood control;

6. Equipment group: responsible for the normal operation of all typhoon and flood prevention equipment, and also responsible for the maintenance of factories and other places in urgent need;

(2) Hazard identification and risk.

Whenever the typhoon flood season comes, according to the forecast of the meteorological department, determine the emergency response level of the enterprise in time:

1, yellow warning (mild): typhoons below magnitude 6 can operate normally;

2. Red warning (moderate): For typhoons with magnitude above 6 and magnitude below 8, the leaders of all departments are on duty, and the warehouse organizes some personnel to participate in emergency disaster prevention;

3. Black early warning (height): In case of typhoon of magnitude 8 or above, the company will stop operation and fix various equipment and facilities. Irrelevant personnel should be evacuated from the site, and leaders at all levels should take the lead in participating. It is necessary to organize all personnel to cooperate closely under the leadership of the commander-in-chief and go all out to prevent typhoon and flood control;

4. Key prevention parts of the enterprise: staff quarters, various areas of the company, various types of equipment, high-voltage distribution room, office, financial room, etc.

(3) Conditions for starting the emergency plan

1, all employees of the enterprise have the right and obligation to report to the enterprise leaders as soon as they know that the disaster weather is coming;

2. Team leader of typhoon prevention and flood control: according to the actual situation, announce the level of emergency plan, confirm personnel, do a good job in typhoon prevention and flood control, and report the progress to the commander-in-chief at any time;

3. Under the unified arrangement of the team leader, typhoon prevention and flood control work should closely cooperate, support each other, communicate information in time, and report directly to the general manager in case of special circumstances;

(4) Emergency equipment and facilities

1. Emergency Command Center: During typhoon and flood prevention, it is guaranteed that someone will be on duty 24 hours a day, and communication is convenient, with 4 walkie-talkies;

2. The power distribution room, materials and electric power departments are on duty 24 hours a day to ensure power supply. Materials are equipped with shovels, pumps, raincoats, flashlights, sandbags, etc. , easy to use. In addition, there are many cars and trucks, which can be called at any time when needed;

3. For special emergencies, you can ask for help from the local 1 10 or 120;

(5) Emergency skills and resources

1. The emergency command center is close to the company's production office area, with fast and convenient information transmission and high management efficiency;

2. Once the rainstorm comes, the post managers are instructed to send typhoon prevention and flood prevention materials to key parts quickly and timely, and make preparations for disaster prevention in advance;

3. During typhoon prevention and flood control, all communication equipment will be turned on 24 hours, and the telephone lines of the command center and warehouse will be connected directly, and all instructions will be understood at any time and stand by at any time;

(6) Protective measures

1. During typhoon prevention and flood control, security personnel will be mainly responsible for the security work of important parts of enterprises such as the finance department and organize personnel to evacuate safely in time;

2. The logistics department is mainly responsible for the evacuation of temporary places to ensure the normal supply of food;

(VII) Information release and employee education

1, according to the actual situation of each stage, the typhoon prevention and flood control team leader will release relevant information in various forms through normal channels with the consent of the chief commander;

2. We should increase awareness of prevention in publicity and education at ordinary times. When we enter the pre-plan state, all the work will be carried out under the unified command of the typhoon prevention and flood control team leader;

3. According to the weather forecast data, employees are required to avoid passing through the tuyere on their way to and from work.

(eight) targeted training and drills.

1. Every year from July to September, all employees of the company are mobilized and the front-line employees of the company are trained. Training subjects include: sandbag, generator test, material dispatching, emergency repair, equipment protection, personnel rescue, security and so on;

2. In order to consolidate the training results and enhance employees' awareness of typhoon prevention and flood control, organize employees to conduct drills before the flood season every year to improve the comprehensive ability and team spirit of enterprises in typhoon prevention and flood control.

(nine) the method of continuous improvement of emergency plan

The team leader of typhoon prevention and flood control records the drill site of each employee, corrects the underestimation in time, adheres to the good aspects and promotes it;

Emergency Plan for Typhoon Prevention of Residential Property 4 This plan is formulated in order to implement the spirit of the Notice on Doing a Good Job in Flood Control and Typhoon Prevention issued by the East China Regional Administration of Civil Aviation and the relevant requirements of local governments at all levels, combined with the emergency plan for flood control and typhoon prevention of X Airport.

This plan is used in conjunction with the emergency plan for flood control and typhoon prevention at X airport.

I. Working principles

In accordance with the principles of "prevention" before the arrival of a typhoon, "avoidance" when the typhoon arrives, and "rescue" after the arrival of a typhoon, the emergency response work for preventing the frontal attack of a typhoon will be carried out in an orderly manner.

Second, organization.

The emergency treatment of X airport to prevent typhoon frontal attack is carried out under the unified leadership of X airport flood control and typhoon rescue headquarters.

Third, the responsibilities of various departments.

After receiving the warning notice of typhoon attack, under the unified leadership of emergency headquarters in flood control and typhoon prevention at X Airport, all departments should act quickly and make preparations and implementation of "prevention", "avoidance" and "rescue" according to their respective responsibilities. The responsibilities of each department are as follows:

1. Airport Office: After receiving the warning notice of typhoon attack, inform the company leaders and airport departments in time. After obtaining the consent of the company leaders, start the plan, arrange personnel to be on duty, and assume the responsibilities of the X airport flood prevention and typhoon rescue headquarters office.

2. On-site command center: After receiving the typhoon attack warning and start-up plan notice, timely cooperate with the airport construction management office, maintenance support office and security inspection station to bind, reinforce or dismantle the parked aircraft and apron facilities and equipment, and timely report the relevant information to the emergency headquarters Office for Flood Control and Typhoon Prevention of X Airport.

3. Air traffic control center: after receiving the warning notice of typhoon attack, do a good job of liaison between the scheduled flights and the transfer of existing flights; Wind prevention, drainage and reinforcement of navigation station; Do a good job in emergency communication support; According to the requirements of the bureau, the contents of the "Airport Air Traffic Control Plan" to prevent typhoon frontal attack were implemented.

4. Maintenance Department: After receiving the warning notice of typhoon attack, according to the requirements of the emergency plan for wind damage of the maintenance department, the parked aircraft will be parked and special vehicles will be put into storage. For special vehicles that cannot be put into storage, they should be parked far away from the parked aircraft, and brakes should be set and wheel gears should be added. The equipment and facilities on the apron should also be put into storage with windproof measures and anti-collision cones, and the traction rods and working ladders should be put into storage or fastened to prevent other facilities from being damaged by wind. Strengthen the personnel on duty and keep the communication open.

5. Airport Construction Management Office: After receiving the warning notice of typhoon attack, strengthen the protection of power supply system, make preparations for emergency repair of power supply, and ensure normal power supply. Windproof measures should be taken for the equipment and facilities on the tarmac. Immediately after the gale, patrol the airport roads and lighting facilities to prepare for the opening of the airport.

6. Security checkpoint: After receiving the warning notice of typhoon attack, reinforce and bind the covered bridge to prevent accidents.

7. Freight Center: After receiving the warning notice of typhoon attack, take windproof measures for freight equipment and facilities outside the freight warehouse, and transfer the freight equipment and facilities on the tarmac to the freight warehouse.

8. Airport Public Security Bureau: After receiving the warning notice of typhoon attack, all fire-fighting vehicles and air defense guard vehicles should be put into storage or parked downwind in time, and equipped with brakes and wheel chocks. All police officers are on standby, ready to accept the dispatch of emergency headquarters for flood control and typhoon prevention at X airport and participate in emergency rescue work.

9. Other departments: stand by at any time according to the duty requirements of the emergency plan for flood control and typhoon prevention at X airport, and keep the communication smooth.

Fourth, the job requirements

1. Responsibility in place, clear division of labor. According to the Emergency Plan for Flood Control and Typhoon Prevention at X Airport and the Emergency Plan for Typhoon Frontal Attack at X Airport, all airport departments can formulate implementation rules, define the responsible person and the specific responsible person, and decompose the typhoon prevention tasks determined in the plan to the specific responsible person, forming a horizontal and vertical work network and a flexible and efficient contact and response mechanism.

2. Full preparation and effective measures. All departments should organize experienced and capable personnel to deal with emergencies according to the typhoon prevention plan. When a strong typhoon attacks or affects the airport head-on, emergency rescue personnel should stand by and gather at the specified time to prepare for the war, as well as emergency materials, equipment, transportation tools, etc. Should be arranged in the front line in case of emergency call. Report to the Municipal Emergency Office in a timely manner and contact socialized emergency materials, equipment and tools. And make emergency preparations.

3. Strengthen vigilance and deal with it in time. The office of the flood control and typhoon rescue headquarters arranges personnel to master and develop flood dynamics, report in time when they encounter over-alert, abnormality or danger, and organize evacuation, emergency repair and reinforcement in time. In case of emergency, while reporting to the superior, we should take the initiative to take emergency measures, seize the favorable opportunity, implement emergency treatment and eliminate hidden dangers.

4. Emergency duty and smooth communication. After receiving the warning notice of typhoon attack, the office of flood control and typhoon prevention and rescue headquarters and all departments implement the 24-hour duty system to keep the information flowing. The heads of all departments and the personnel in charge of typhoon prevention in their own departments turn on their mobile phones day and night to track the rain, water, customs, disasters and secondary disasters, hold timely consultations and start relevant emergency procedures according to different situations.

Verb (abbreviation of verb) supplementary clause

1. The Airport Company is responsible for the interpretation and implementation of this scheme. And revised in time according to the actual situation.

2. This scheme shall be implemented as of the date of promulgation.

Emergency plan for typhoon prevention of residential property 5 I. Purpose:

Establish an emergency plan for flood prevention and typhoon rescue, strengthen the flood prevention and rescue ability of the management service area through the training and actual combat drills of emergency teams, eliminate dangerous situations more effectively and timely, reduce losses to a minimum, and ensure that the flood prevention and typhoon rescue work is foolproof.

Second, responsibilities:

The director of the management office is the commander-in-chief of flood prevention and typhoon rescue;

The person in charge of the management office is the deputy commander, who is responsible for the overall work of the equipment group;

The safety promoter is the deputy commander, responsible for the overall work of the rescue team;

The environmental organizer is the deputy commander-in-chief, responsible for the overall work of the logistics team;

The control center is responsible for the accurate transmission and coordination of information;

All off-duty personnel in the management office are emergency rescue team members for flood prevention and typhoon prevention.

Third, the division of responsibilities of the group:

3. 1 rescue team: it is composed of all the off-duty safety officers in charge of safety.

3. 1. 1 Take all measures to deal with the dangerous situation;

3. 1.2 Responsible for filling, handling and stacking flood control sandbags;

3. 1.3 use various methods to eliminate dangerous situations in time.

3. 1.4 Division of labor

3. 1.4. 1 Two off-duty central posts are responsible for loading sandbags;

3. 1.4. 2 2 No.2, No.3 and No.4 are responsible for transporting sandbags;

3. 1.4.3 Two off-duty No.6 and No.8 are responsible for piling sandbags on site and taking other measures for emergency rescue;

3. 1.4.4 The safety sponsor leads the rescue team to take all other effective methods to do all rescue work well.

3.2 Equipment group: consists of the manager of the management office and two technicians of the management office.

3.2. 1 Responsible for starting various pumps and power supply equipment;

3.2.2 Provide technical guidance to the rescue site;

3.2.3 Conduct emergency maintenance on the field equipment.

3.3 Logistics Group: It consists of environmental sponsors, domestic helpers, lifeguards, front desk attendants, cashiers and club attendants.

3.3. 1 Ensure the normal supply of all kinds of relief materials;

3.3.2 Be responsible for the rescue of the wounded on site;

3.3.3 Actively assist other groups;

3.3.4 Division of labor

3.3.4. 1 Two off-duty No.5 posts are responsible for logistics and material support;

The front desk attendants, cashiers and club attendants in 3.3.4.2 are responsible for evacuating people and rescuing the wounded, transferring the wounded to a safe place and reporting to the municipal emergency center in time;

In 3.3.4.3, lifeguards and domestic helpers are responsible for property rescue.

3.4 personnel on duty

4. 1. 1 When the personnel on duty find the danger, they shall promptly notify the center and the leaders on duty;

4. 1.2 After receiving the information, the attendant in the center shall take emergency gathering and other measures to call off-duty personnel to relieve the danger in time;

4. 1.3 The personnel on duty in the center shall immediately notify the management office manager, management office supervisor and safety director;

4. 1.4 center attendant reports to each duty post;

4. 1.5 Maintain the order of posts on site and guide personnel and vehicles;

4. 1.6 The attendant in the center should pay close attention to the site situation and seek other support when necessary.

4. 1.7 Before the typhoon comes, all posts in the management office should carefully check the potential safety hazards within their posts, eliminate the danger in time, and report the serious cases to their superiors in time.

Note: all members must obey orders, obey orders; All members should pay attention to their own safety during emergency rescue.

;