How to sign a hotel renovation contract

According to the Economic Contract Law of the People's Republic of China and the relevant regulations of the decoration industry, this contract is signed by both parties through consultation, and both parties shall perform it jointly.

First project

Party A entrusts Party B to undertake the following home improvement design tasks: project address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Project Address

Article 2 Design Fees and Payment Methods

(1) The design fee of this project shall be implemented according to the national and current market charging standards.

Party A and Party B agree that the design fee is RMB/m2 (usable area of the suite, excluding computer renderings), and the estimated total cost is RMB, in words.

(II) Mode of payment

Party A and Party B adopt the following terms of payment

65,438+0. Prepayment before measuring the house 1 0,000 yuan (including 200 yuan door-to-door measurement fee and 800 yuan scheme fee);

2. After the scheme is passed, a full set of construction drawings will be issued, and the customer can pay the balance and take away the full set of drawings;

3. Computer renderings, price: 800 yuan/Zhang (A4);

Article 3 Agreement on Design Content and Completion Date

(1) The design drawings provided by Party B shall have detailed design descriptions.

(2) Front plan view

1, original room plan

2. Schematic diagram of wall reconstruction

3. Layout of plane furniture

4. Ground map

5. smallpox map

6, the elevation of the furniture site (according to the actual situation or not)

7, door elevation (according to the actual situation or not)

6. Partial elevation of kitchen and bathroom (except customized kitchen)

7. Front view of TV background wall

8. Site elevation of other walls to be built.

(3) the side.

1, indicating the material, material, color, etc.

2. The outline of the door window cover

3. Introduction to the entrance

4. Introduction to smallpox

5. Introduction of TV background wall

6. Other sections that need construction.

(4) Hydropower construction drawings

(5) Party A and Party B agree to complete the plan within 7 days from the effective date of the contract;

After the scheme is approved by Party A, Party B shall complete the full set of construction drawings within 7 days.

Article 4 Responsibilities of both parties

(I) Party A's responsibilities

1. Submit the data required for design (floor plan and structural plan approved by the property) to Party B as scheduled, and ensure the quality of the submitted data meets the engineering design requirements;

2. Pay advance payment and engineering design fee to Party B according to the agreed date and quantity;

3. If the processing and ordering of the building materials and equipment of this project need the cooperation of Party B's designers, the required expenses shall be borne by Party A;

4. After Party A and Party B determine the scheme, the original design scheme needs to be changed in the construction drawing design stage due to Party A's reasons (such as changing the overall style and overturning the overall scheme). , excluding the local modification of individual room layout and furnishings), Party A shall pay Party B 30% of the design rework fee in one lump sum, and then carry out the second scheme design;

(II) Party B's responsibilities

1. Party A shall pay the design documents specified in this contract on schedule and ensure that the quality of the design documents meets the requirements of relevant national laws and regulations, as well as the construction and use requirements of Party A;

2. Be responsible for the design disclosure before the commencement of the engineering design projects listed in this contract (limited to one time);

Article 5 Liability for breach of contract

(1) If the design documents cannot be submitted within the time stipulated in this contract due to Party B's reasons, Party B shall compensate Party A for the design delay loss of 100 yuan/day as a penalty from the day after the overdue date;

(2) When Party B fails to perform the contract, it shall double the advance payment of Party A and return all the design fees except the advance payment received;

(3) If Party A fails to pass the scheme made by Party B, Party B will refund the scheme fee in the advance payment of Party A, but not the measurement fee, and the scheme drawings shall be owned by Party B;

(4) If Party A passes the scheme but does not approve the construction drawing, Party A will not refund all the advance payment or take away the construction drawing.

Article 6 Entry into force, suspension and termination of contracts

(1) This contract shall come into effect after being signed by Party A and stamped with the official seal of the legal entity by Party B (the official seal of the unincorporated company is required). The effective date of this contract shall be the date when the last party of Party A and Party B signs (seals). ..

(II) This contract shall be terminated on the date when Party B provides Party A with all the home improvement design documents stipulated in this contract, and Party A pays all the design fees according to this contract, unless otherwise agreed in this contract.

Article 7 Methods of settlement of contract disputes

In case of any dispute during the performance of this contract, if both parties cannot reach an agreement through negotiation, the following option shall be adopted for settlement:

1. Apply to the Consumer Council for mediation;

2. Bring a lawsuit to a people's court with jurisdiction;

Iii. Other schemes: _ _ _ _ _ _ _ _ _ _.

Article 8 Matters not covered and additional clauses

(1) Matters not covered in this contract shall be determined by both parties through consultation, and a written agreement shall be signed as an annex to this contract.

(II) The additional clauses of this contract are as follows:

1, the designer is responsible for the design disclosure before the commencement of the engineering design projects listed in this contract (only once);

2. The designer shall provide free technical problems related to the design during the project construction (second on-site service);

3. The designer participates in the project completion acceptance (site drawing acceptance) for free (once);

4. Designers provide accompanying furniture and soft decoration services (once);

Article 9 Contract Text

1. This contract shall come into effect after being signed (sealed) by both parties.

2. After signing this contract, Party B shall not subcontract the design project.

3. This contract is made in duplicate, with each party holding one copy.

Fourth, the contract will be terminated automatically upon completion.

Party A: Party B:

Signature: signature:

Signing address: Signing address:

Date of signing: Date of signing: