Traditional Culture Encyclopedia - Hotel franchise - How to level the ground?
How to level the ground?
The simplest leveling method is to put a horizontal line first. As long as Mo Dou is added to the plastic horizontal pipe, it can be used by masons and carpenters. After leveling around the line, scrape it with a 2-meter-long scraper. Better level the floor. According to the line, start from the highest point, add pads to the lower point, and lay the keel to lay the floor. Check and adjust with a level when laying.
- Previous article:Introduction of scenic spots in Oriental Salt Lake City
- Next article:Sleep naked, okay?
- Related articles
- Which street does Huangdao Yinling International belong to?
- What grade does Zhefei Hotel belong to?
- How to book Itha underwater restaurant in Lido, Hilton Port, Maldives? Should I make an appointment with the hotel after I go to the island or with the travel agency before I go?
- How far is MGM International Hotel Dongwan from Fengtai Sports Center?
- Hongyuan Group (China's leading real estate development company)
- Does Shanghai Pujiang Tourism Group Co., Ltd. need political review for recruitment?
- How to get off the expressway in Xi'an to Jindu Weiai Hotel
- How about Guo Rui Xishu? OK or not? Is it worth buying?
- Where is the ticket purchase point for Sanya high-speed rail?
- Good words and sentences describe tall buildings