Traditional Culture Encyclopedia - Hotel franchise - Dean Mani Hotel

Dean Mani Hotel

Hotel water and electricity decoration sounds complicated, but as long as you master some key points, you can make everything simple. Here are some important considerations.

Preparatory cutting

Before the hydropower transformation, it is necessary to determine all the fixed points of hydropower, including the common equipment points of each room. In this way, we can ensure that there are no omissions and know fairly well. In addition, there are some details that need special attention when planning the wiring of switch sockets.

engineering scale

The installation of water and electricity in the hotel is relatively large, which is different from the installation or decoration of water and electricity in family decoration. Therefore, in the construction process, there are more factors to be considered and the engineering quantity is also greater.

Get ready.

The preparation work of hotel hydropower construction is very important. This includes detailed hotel water and electricity installation and construction design drawings, brands and specifications of water and electricity materials to ensure that the quotation is not much different from the market price. These preparations can ensure the smooth progress of the construction.