I live in Gongyiqiao, and I just recently saw a project called Niutuo Hot Spring Peacock City. The price is pretty good, and it only takes an hour to drive. Has anyone bought it? I want to refer to

The house has been closed down and there are many problems with the house! The following is a summary of the problems with the first phase of house resumption in Niutuo Hot Spring Peacock City (a subsidiary of China Land Development) summarized by the owners of the first phase of house resumption

1. The road in the community is too narrow, driving in both directions, and making a U-turn is difficult.

2. Public parking spaces should be provided in the first phase.

3. The roads in the community are bumpy.

4. The sewage well in the garden is blocked by the common wall between neighbors and cannot be opened.

5. The sewage manhole covers and weak current manhole covers in the garden are both below the ground. After the garden is leveled, both manhole covers are buried under the ground.

6. There are differences between the exterior walls and the model rooms. Nowadays, the courtyard walls are all made of ordinary exterior wall paint, while the model rooms are all made of real stone paint.

7. Some hot spring water outlets are only located in the garden, and there are no reserved pipes on the first, second and third floors indoors.

8. The water system landscape zone has been greatly compressed, and currently only one hot spring remains.

9. 0422 A row of hot spring outlets and parking spaces are together, so it is impossible to build a hot spring pool.

10. The front and back yards are full of construction waste (too many steel bars and cement blocks)

11. The building video intercom system and wall-mounted boiler, and the basement sewage treatment system are in use during house closing. None. The inspection and acceptance personnel said that they would be issued after the renovation, but they did not implement it on paper.

12. The low partition wall at the entrance to the 1051 stacked courtyard is obviously skewed. Ask for a change of direction!

13. Not only the paint of the garden fence is different from the sample room, but also the appearance is different. The garden fence lacks a brown cap. The requirements are consistent with the sample room!

14. The material of the roof bricks of the second-story terrace partition wall is completely different from that of the roof of the low entrance ladder partition wall. The roof bricks of the terrace partition wall are very rough, like foam bricks. The requirements are consistent with the sample room!

15. The design of rainwater drainage is unreasonable. The overlapping rainwater drainage pipes lead water to the terrace on the second floor. Ask for a makeover!

16. The greening at the north entrance of 1051 is too poor. The bare asphalt road directly connects to a row of bare stone parking spaces, and then directly connects to the bare exterior wall. Ask for a makeover! Increase the green area!

17. When I bought the house, I was told that there was no electric box. After I paid the money, I saw that there was an electric box on the package. It was explained as 150x60 cm. After checking the information, it was harmless to the body. I accepted it, but when I closed the house, It’s a really big electrical box, I’m so angry! Naked deception! Greening around the electrical box is required!

18. The hot spring water was priced at 15 yuan per ton at the time, but when I closed the house it became 25 yuan per ton. When I asked why, I was told that the salesperson was talking nonsense. Is it the salesperson talking nonsense or the developer talking nonsense? ! Find the solution!