Traditional Culture Encyclopedia - Hotel franchise - How big is the marble on the hotel wall?
How big is the marble on the hotel wall?
It is best to choose Anji beige or California color. The cheap and high-grade gold wire wall is yellow (the price is moderate and the effect is good), and the hypotenuse size is 50* 100cm.
If it is a large area tooling, it is best to use structural dry hanging. If it is wet, marble is heavy, easy to fall off and unsafe. Others are relatively troublesome and unsafe.
Jia Zhuang recommends dry hanging and point hanging. You can wet paste a small area, but I always feel that it will fall off at any time.
If it is a large area tooling, it is best to use structural dry hanging. If it is wet, marble is heavy, easy to fall off and unsafe. Others are relatively troublesome and unsafe.
Jia Zhuang recommends dry hanging and point hanging. You can wet paste a small area, but I always feel that it will fall off at any time.
1. Dry hanging of steel structure; Second, the cement mortar wet paste; Third, hang; Four, copper wire and grouting.
Wet sticking and dry hanging construction, but wet sticking marble on the wall is more likely to produce stone lesions.
Dry hanging: dry hanging is connected with steel skeleton.
Wet hanging: the back of marble is waterproof, and the opening is connected with copper wire by steel skeleton or bolt, and concrete is injected. Other construction techniques are usually bonding to a relatively flat pad.
Supplementary matters:
"Dry hanging" generally refers to the construction method of connecting steel skeleton and stone with stainless steel pendants.
"Dry bonding" generally refers to the construction method of using dry powder adhesive as bonding material for marble stone base and cement mortar as base before paving.
"Wet hanging" generally refers to the construction method that cement mortar is used as the bonding material of marble stone base, and the board is hung first and then the mortar is poured.
"Wet pasting" generally refers to the construction method that the marble stone base uses cement mortar as the pasting material, and the base uses cement mortar to make the base before paving the board.
Introduction of dry and wet suspension:
Dry hanging is to cut one side of the plate, make expansion screws on the wall, hang the perforated angle iron as a beam, then put the pendant in the slit opened in the stone, screw the pendant into the eye of the angle iron with screws, and stick the pendant with marble glue. Another method is to insert a long plug-in into the wall instead of using angle iron as a beam, and fix the rest with glue. Wet hanging is to fix the position of the plate (usually a nail is hit on the wall and the other end of the copper wire is fixed on the stone). A plate is usually two nails), and then cement is poured into the joint between the plate and the wall.
Generally, it is used for both wet and dry purposes. Dry hanging is generally a large-area external wall, and wet hanging is basically gone now. Only the tiles (bathroom, kitchen) are wet. There is basically no wet hanging in the project, and now it is basically installed and repaired at home.
Wet pasting refers to pasting 3-4cm cement mortar on the back of stone, while dry hanging refers to fixing marble stone with steel keel pendant. The difference between the two is that the way to fix the back is different, but the cost is also different. Dry hanging is much more expensive than wet sticking.
- Related articles
- How about Zibo Taidu Hotel?
- Is there a venue with a better environment in the main urban area of ??Changsha?
- Friend hotel
- What hotels are near Shandong University New Campus? How about the price and quietness?
- Who knows about a local Chinese-run travel agency in Bangkok, Thailand....
- How about Haihuatang? OK or not? Is it worth buying?
- How many fire elevators should the hotel be equipped with?
- Explanatory composition
- The 10th goat milk family invited those big stars.
- Hangzhou Xiaoshan Airport arrives at night 12, and requires an overnight plan within 100 yuan (for example, soaking in a 24-hour bathhouse). Innovative specific design will be rewarded: including rout