Traditional Culture Encyclopedia - Hotel franchise - How to write a bidding announcement for the conceptual scheme design of a four-star hotel decoration
How to write a bidding announcement for the conceptual scheme design of a four-star hotel decoration
I will send you a case study. The format of each bidding announcement is similar, just change the content.
Tender Announcement for Decoration Design of Xiwei Hotel
1. Project Overview
1. Project Name: Xiwei Hotel (designed according to four-star hotel standards )
2. Project location; Yisu River, Xiangtan City, Hunan Province
3. The total construction area of ??the hotel is 35,000 square meters
4. The main functions of the hotel:
Floors 1-3: Supermarket
Floor 4: Chinese and Western restaurants
Floor 5: Cinema
Floors 6-8: Deluxe rooms
Floors 9-15: Business rooms
Floors 1-2 underground: parking lot and logistics.
II. Bidding scope
1. The overall interior decoration design plan of the hotel;
2. Guest rooms, bathrooms, elevator halls and corridors of the hotel guest room building etc.;
3. Hotel Chinese and Western restaurants, bathrooms, elevator halls, corridors, etc.;
4. Overall decoration design plan for the hotel lobby;
5. Hotel Indoor environment greening, soft furnishings, etc.;
6. Decorative design of other related parts.
3. Qualification requirements for design units
1. The design unit must have a Grade A qualification for architectural decoration engineering design issued by the Ministry of Construction. The person in charge of the designer must have a senior technical title in the corresponding profession or a registered professional qualification of the corresponding level, and have design experience in a four-star or above hotel (see the attachment for detailed requirements).
2. The design unit can also be a domestic or foreign consortium. Domestic design institutions should meet the requirements in point 1 above.
3. The design unit must submit at least one example of interior decoration of a four-star or above hotel designed in the past three years (examples of proposed main designers).
IV. Requirements for scheme design results
1. Design according to four-star hotel standards, and provide scheme design instructions (including cost estimates, etc.).
2. Drawings (including floor plan of each floor; renderings of entrance, lobby, passenger elevator front room, restaurant, conference hall, guest rooms, etc.).
3. Submit a plan booklet with A3 (297mm×420mm) specifications. The booklet should include the design description and the above drawings. The written text of the above documents is in four sets.
5. Pre-qualification application and submission
Method 1: Design units interested in participating should submit the "Pre-qualification Documents" and similar projects in the past three years before 18:00 on October 25 Achievements (at least one example of decoration plan text for a four-star hotel or above) should be submitted to Xiwei Coffee Chinese and Western Restaurant, No. 2 Dahu Road, Yuhu District, Xiangtan City, Hunan Province. Participating units must provide business licenses, qualification certificates, and key designers when submitting information. Original (copy) of practicing qualification certificate. Those who pass the pre-qualification will be invited to participate in the design of this plan.
Method 2: Design units interested in participating should submit the "Pre-Qualification Document" and the performance of similar projects in the past three years (renovation of four-star or above hotels) before 24:00 on October 20 (subject to postmark) At least one example of the plan text), business license, qualification certificate, copy of the main designer's professional qualification certificate with the official seal of the unit, EMS to Xiwei Coffee Chinese and Western Restaurant, No. 2 Dahu Road, Yuhu District, Xiangtan City, Hunan Province, after being invited to participate in the design of this plan Original certificates should be provided afterwards. (This question is answered by China Real Estate Investment Network)
6. Scheme design time
It will be completed within 20 days from the date of formal invitation for scheme design.
7. Plan modification
The design unit is obliged to make necessary modifications according to the owner's opinions.
8. Design Commission
The design unit of the design plan adopted by the owner will be given priority as the decoration design unit. If it is officially entrusted as the design unit, the owner will not pay compensation for the project cost, and both parties will sign a separate "Decoration Design Contract".
Tendering unit: Hunan Xiwei Catering Chain
Address: Xiwei Coffee Chinese and Western Restaurant, No. 2 Dahu Road, Yuhu District, Xiangtan City, Hunan Province
- Related articles
- Will Dongguan Prince Hotel reopen?
- What are the detailed rules for hotel decoration supervision?
- Where is Shahe Shang Ya Hotel?
- How far is Kunming from red river valley Rehai Hotel in Yuanjiang?
- What about Fangchenggang Century Liyuan Hotel Co., Ltd.?
- The plot of the movie "Ghost Lights the Lamp"
- What should I bring to the hot spring?
- Where are the two-part allegorical sayings?
- What is the first level of Marriott Galaxy?
- How about before Xiamen Bay? OK or not? Is it worth buying?