Traditional Culture Encyclopedia - Hotel franchise - What kind of brick is used for the bathroom wall, there must be relevant specification requirements.
What kind of brick is used for the bathroom wall, there must be relevant specification requirements.
Water supply and drainage drawing standard? GB/T? 50 106。
Code for design of building water supply and drainage? GB 500 15 .
Code for design of reclaimed water in buildings GB 50336.
Code for acceptance of construction quality of building water supply, drainage and heating engineering GB 50242.
Technical specification for building water supply polyethylene pipeline engineering CJJ/T 98.
Technical specification for building water supply polypropylene pipeline engineering? GB/T? 50349。
Technical specification for building drainage rigid PVC pipeline engineering CJJ/T 29
However, it is necessary to reverse the bottom beam of plain concrete. Aerated bricks, sintered gangue bricks or autoclaved lime-sand bricks can be laid on it. Except for rooms with plenty of water, ordinary concrete small hollow blocks use skirting lines (slabs) to cover possible shrinkage cracks at the bottom of infilled walls, mainly to improve the waterproof effect of the bottom of infilled walls in rooms with plenty of water.
Extended data:
The details shall be constructed first, and the grooves, holes and wall-penetrating pipes of each drainage pipe shall be closed. Scour the ground, clean up the accumulated water in time, and the washed water shall not flow out of the construction scope to prevent leakage from damaging the downstairs. Make sure there are no floating dust, sand and debris. After cleaning the walls and floors, flush the pipes with water to prevent the pipes from being blocked.
In large-scale construction, the wall shall be constructed first, and then the ground shall be constructed, and there shall be no construction omissions. For the treatment along the entrance, the water stop along the entrance should be added according to the existing materials on site. If the height meets the test conditions (there is water on the toilet floor), it is best not to affect the laying of the entrance stone.
The construction is completed. Finally, check whether there are any defects in the waterproof layer construction as a whole to ensure that there are no omissions in the construction process. Pack up the cleaning tools. In principle, cleaning water should not be spilled in the room to prevent it from leaking to the downstairs room. Before leaving the site, if there are no other construction workers, the water diversion valve, main water valve, main power switch and doors and windows must be closed.
Baidu Encyclopedia-Waterproof Construction of Toilet
Baidu encyclopedia-bathroom
- Previous article:Jinan Dongyi Risheng Recruitment
- Next article:What should I pay attention to when purchasing hotel room furniture?
- Related articles
- Ikea Dalian Hotel Haixing Park to Dalian Airport
- Hotels near the East Gate of the Temple of Heaven in Beijing?
- How can Zhaoqing find the facilities around the Academy of Fine Arts?
- List of Free Scenic Spots in Heilongjiang Province on China Tourism Day —— A Summary of Ticket Promotion Activities in Scenic Spots
- Comprehensive information on the Grand Canyon of the United States
- Hotels in Dubai are very expensive.
- What are the architectural styles of the Blue Mosque and Hagia Sophia in Turkey?
- What are the exquisite contents of Han Yongrui Hotel?
- What is the most convenient way to get to Nara from apa Hotel in Kyoto?
- Can I go during the epidemic in Gaozhuang Township of Huixian County?