Traditional Culture Encyclopedia - Hotel franchise - What should be paid attention to in the completion acceptance of new house decoration
What should be paid attention to in the completion acceptance of new house decoration
In the decoration inspection, it is easy to see the problems of ceiling and wall tiles, with the most problems and the incidence rate as high as 25%. The main problems are brush marks, bumps, sagging and secondary damage caused by insufficient protection of finished products in the later stage. Wall tiles are also the "hardest hit" for decoration, and there are mainly problems such as lack of edges and corners, damage, hollowing, lax jointing, unevenness, poor materials and insufficient protection of finished products. In addition, there are some problems in door engineering, such as knocking, nailing, scratching and insufficient protection of finished products.
Don't ignore the wires on the wall.
Wires hidden behind wall switches are often overlooked. After renovation, when many consumers use some water heaters and air conditioners with high power consumption, switches and sockets will heat up or even burn down. This situation is probably caused by the electrician's failure to follow the construction requirements when installing sockets, switches and lamps. When using in summer, be sure to check whether the wiring is qualified and whether it is hot.
Concealed engineering to prevent hidden dangers
Checking whether there are special checkpoints and saddles for hydropower pipelines is also one of the experiences of investigating the difference between professional hydropower and cottage teams. The nodes for mutual acceptance after construction are: after the hydropower transformation, before the tank body is sealed; After the wall and floor tiles are laid, the ground and walls shall be leveled and painted. Where hanging cabinets and mirror cabinets need to be installed on the walls of kitchens and bathrooms, they need to be installed with impact drills. When drilling holes and nailing wooden wedges, we must pay attention to the direction of water and electricity pipelines; Never punch holes in the pipeline, and whether the threading pipe of electric wire takes the shortest distance from point to point; If you take a 90-degree square, you wound it on purpose.
The sewer pipe should be unobstructed.
The sewer pipe must be inspected during acceptance. A few construction teams may directly pour concrete fragments containing a lot of cement and sand into the sewer, which will cause the problem of poor sewer pipes in the future. After the waterway construction is completed, fill all basins, basins and bathtubs with water to see if the sewer pipes are unobstructed.
Substrate treatment should be done well.
Before brushing latex paint and paving wall and floor tiles, the base of the wall or ground must be handled well. For new houses, the substrate treatment generally only needs to be polished with coarse sandpaper, and the original paint layer does not need to be removed. The walls of ordinary old houses need to be removed before the next process can be carried out. In the construction of wall and floor tile paving, you should pay attention to the fact that ceramic tiles cannot be directly laid on the surface of lime mortar, lime paste, paper reinforced lime paste, hemp knife lime paste and latex paint.
Water and electricity lines should be unblocked
Nowadays, buried pipes are generally chosen for family decoration, and can only be buried after the walls and floors are slotted. Before construction, reconfirm the direction and position of the pipeline with the construction team leader. According to different wall structures, the requirements for slotting are also different. Slotting is not allowed in the indoor load-bearing wall, and the surface of the wall with insulation layer is easy to crack after slotting. When slotting in the ground, more attention should be paid not to damage the floor, which will bring trouble to the residents downstairs. In addition, we must let the decoration company leave a "pipeline map", draw the direction and specific location of the wires, indicate the location of the upstairs, downstairs and adjacent walls, and indicate the joint position of the pipeline.
- Related articles
- An American movie is about several young people driving out.
- How big an Allen wrench does it take to replace the glass door hanger in the bathroom?
- Perforated aluminum ceiling
- The loss of a 23-year-old calf in Hefei, Wuxi attracted attention. What is hidden behind this matter?
- Where is the isolation point of Xi 'an refuge?
- One-day tour of Yinchuan, must go to scenic spots?
- How to open Kunming B&B
- What is the longitude of Shuixing Tower in Changde City?
- It's best to go to Beijing on weekends. Where do couples in Beijing spend their weekends?
- How to evaluate the movie Spider-Man: Heroic Expedition? What are the highlights of this film?