Fire prevention is not put on record, which proves that fire prevention is not put on record.

Do dry powder fire extinguishers need to be filed by the fire department?

According to the scale, this is filed in the public security fire control institution, not necessarily in the fire station. Small areas are registered in the local police station, and areas over 300 square meters are registered in the fire brigade.

How many square meters of fire protection changes do not need approval?

Fire protection renovation with a building area of not more than 300 square meters does not require approval. Where the building area is 300 square meters or more, the fire protection design of the decoration project shall be declared for the record, after completion, it shall be declared for the completion acceptance fire protection record, and before opening, it shall be declared for the fire safety inspection. Change the business entity, even if it is not renovated, it is necessary to declare fire safety inspection or apply for change.

What do you mean the fire record is not drawn?

Most construction projects need to report the fire protection design to the housing and construction department for the record before construction, and need to report it to the housing and construction department for completion acceptance for the record before completion and use. After the record was passed, the legal fire control procedures of the construction project were obtained. If the filing is not selected, that is, when the number is selected for filing, the selected number can be directly constructed or put into use without filing review or completion acceptance, which saves the time and energy of the construction unit and is a convenience measure.

Can a house be put on record?

Of course, the house can be filed.

2. However, not all houses have to declare fire control acceptance. Villagers' self-built houses do not belong to the scope of fire control acceptance or fire control acceptance filing.

3. DecreeNo. 1 19 of the Ministry of Public Security "Regulations on Fire Prevention and Management of Building Projects" Article 2 These regulations are applicable to the fire prevention and management of building projects such as new construction, expansion and reconstruction (including indoor and outdoor decoration, building insulation and change of use).

These Provisions do not apply to the construction activities of temporary buildings in non-crowded places such as residential interior decoration, villagers' self-built houses and disaster relief.

How to register an intelligent fire engineer in China Institute of Management?

The construction unit of fire control facilities project shall apply to the Municipal Fire Bureau, and provide basic information such as the name of the unit, legal representative and the original relevant qualification certificate. After the written preliminary examination of the application materials, the detachment will send personnel to inspect and review the tendering units. After the examination and approval, the leadership of the fire department will discuss and issue the Approval Form for the Registration Certificate of Construction Enterprises, allowing bidding for construction. Fire control completion acceptance shall not be carried out for fire control construction units and construction enterprises that have not been put on record or failed to pass the record review.

The registration certificate records the basic information of the construction enterprise, the qualification grade, the project undertaken in our city and other detailed information, which provides a basis for the construction unit to bid.