Traditional Culture Encyclopedia - Hotel franchise - What if the hotel decoration is not well designed?

What if the hotel decoration is not well designed?

Prepare relevant materials: a copy of the enterprise identity certificate, a copy of the house lease contract, a copy of the first unit's real estate license, the first unit's fire protection design review opinions, the first unit's fire protection acceptance opinions, a full set of decoration drawings, the qualification of the decoration unit, and the decoration design documents, such as the material fire protection grade, the first floor plan of the building, and the building plan.

1. Online filing requires opening the "Fire Protection Network" on the Internet, filling in relevant information and submitting it. If selected, you need to submit the prepared materials to the local fire department within 5 working days. If it is not selected, it can be directly built, but the materials for online declaration must be improved.

2. Send for inspection. After getting the decoration permit, you need to get the permission of the fire department to decorate the culvert before construction. You also need to send samples of materials for decoration to the fire department for inspection, such as fire doors, fire retardant coatings, carpets and so on.

3. accept. You can apply for acceptance after the completion of the consumption project. The fire department will arrange relevant staff to go to the site to check whether the materials are consistent with the submitted materials. After obtaining the approval certificate, you can start business.