Traditional Culture Encyclopedia - Hotel franchise - Please give a high score to the management system of hotel linen room, cleaning room and audit room in detail.

Please give a high score to the management system of hotel linen room, cleaning room and audit room in detail.

General description of the design

I. Design Overview-

This atlas is the construction drawing of interior decoration design of a hotel.

Second, the design standards and design basis

1. The decoration standard of this design is advanced. The selection of material quality, construction process design and requirements conform to the Code for Construction and Acceptance of Building Decoration Engineering JG173-91.

2. The hydropower system in this design is designed according to relevant national standards.

3. The civil blueprint provided by Party A and Party A's relevant requirements for this project.

4. This set of decoration construction drawings includes the general design description, drawing catalogue, floor plan, ceiling plan, floor material layout plan, etc.

5. This set of decorative construction drawings is also equipped with elevation, construction node detail, section and related design requirements.

In addition to the special construction technology, the basic internal design requirements, construction structure and technical problems of this design are based on the Code for Construction and Acceptance of Building Decoration Engineering.

(GB502 10-200 1) and Code for Fire Protection Design of Interior Decoration of Buildings.

(GB50222-95) and refer to the Code for Quality of Interior Design and Decoration Engineering.

(GB 1838-93-93)。

On the basis of retaining the original building structure, building facilities, fire partition and fire-fighting facilities, the use function is improved to reflect the decorative style. The construction and acceptance of this project will be carried out in accordance with the Code for Construction and Acceptance of Building Decoration Engineering (GB502 10-200 1), and some projects will refer to the Code for Quality of Interior Decoration Engineering (GB 1838-93). The acceptance standard of fire control construction is based on the Code for Fire Protection Design of Interior Decoration of Buildings (GB1838-93)

6. The overall construction and verification of the suspended ceiling project shall conform to the construction verification of (GB 50210-2001) 5.1,5.2, 5.3 and 5.6. It is required that the fire protection and fire resistance grades meet the requirements of 3.3. 1 in GB50222-95.

In addition to the above terms, the specific terms and conditions of each classified ceiling project are as follows:

1. Lightweight steel keel gypsum board ceiling: it shall comply with the provisions of (GB 50210-2001) 5.4.1,5.4.3.

2.ppt ceiling: it shall conform to (GB 50210-2001) 5.4.1.

3. Ceiling with wood and plywood: it shall comply with the provisions of (GB 50210-2001) 5.4.1.

4. Aluminum alloy metal decorative ceiling: it shall comply with the provisions of (GB 50210-2001) 5.4.6.

5. Expansion bolts are not allowed to be buried vertically in the ceiling of the bathroom, so as not to damage the floor. It is suggested to use transverse light steel main frame for support.

7, partition wall engineering

The overall construction and verification of the divisional works shall comply with (JGJ 73-9 1) 6. 1, 6.3, 6.5 and 6.6. It is required that the fire protection and fire resistance grade meet the specification of (GB50222-95)3.3. 1.

1. partition of wood and plywood: it shall comply with the provisions of (GB 50210-2001) 6.4.2.

8, facing engineering

Overall construction and verification of facing works: it shall comply with (GB 50210-2001) 7.1,7.2 and 7.7.

Fire resistance and fire resistance grade: it shall comply with the provisions of (GB50222-95)3.4. 1 and 3.4.2.

9. Coating engineering (including water-based coatings, emulsions and various paints)

Overall construction and verification of coating engineering: it shall conform to (GB 50210-20011.1.1.2,1.

Fire resistance and fire resistance grade: it shall comply with the provisions of (GB50222-95)3.3. 1, 3.4. 1 and 3.4.2.

10, glass engineering

Overall construction and verification of glass engineering: it shall comply with (GB 50210-2001) 4.1,4.2, 4.3 and 4.5.

Fire resistance and fire resistance grade: it shall comply with the provisions of (GB50222-95)3.4. 1 and 3.4.2.

Note: Code for Construction and Acceptance of Building Decoration Engineering [GB502 10-200 1] is the national industry standard.

Approval authority: Ministry of Construction, effective date: March 2002 1.

Code for Fire Protection Design of Building Interior Decoration [GJ73-9 1] is a national standard.

Editor-in-Chief: Approved by the Ministry of Public Security: Effective date of the Ministry of Construction:199510.001.

Code for Fire Protection Design of Building Interior Decoration [GJ73-9 1] is a national standard.

Approved by: Ministry of Light Industry, effective date: 199 1 year.

1 1, construction drawing design description

1. Through consultation, this design is architectural decoration design, and the corresponding design of the specialty should be adjusted appropriately according to this design.

2. Where civil structures are involved, construction can only be started after being approved by the architectural design institute.

3. Unless otherwise specified, all wood finishes in the drawing are painted in semi-matte color, and this requirement is not indicated in the drawing.

4. The hardware accessories such as handles and hinges in the drawing are only schematic diagrams, and the actual samples need to be determined through on-site consultation between the owner and the designer.

5. The fire doors indicated in the drawing are customized by professional manufacturers according to the styles provided by designers.

6. Except for veneer, all solid wood edges and wood lines in the drawing should be the same as the related veneer wood.

7. The tube well in the core tube is designed according to the original building except the elevator room and the outdoor room before fire fighting.

8. Materials, lamps, movable furniture, artworks, paintings, etc. What is shown in the figure is only a schematic reference. The final product or design sample provided by the decoration company or the unit entrusted by the owner must be approved by the designer and the owner.

9. Light steel keel plasterboard ceiling in the drawing adopts U50 series auxiliary keel @300X300 reinforced light steel keel (not done here); The main keel is @800X800, the spacing is 800- 1000, and the thickness of gypsum board with 8MM hanger bars is 9.

10. All bathroom door are equipped with automatic door closers.

1 1. All gypsum board joints shall be repaired with putty (joints must be cut), and the fabric joints shall be 100 wide, and the boards and gypsum boards shall be painted with epoxy resin.

12. All stone materials need to be pasted with AB structural adhesive, and stone materials need to be pasted with marble adhesive. Make a dry paste with a wooden board as the bottom.

13. All decorative paints are treated by polyester paint, and both sides of the three bases are painted to keep the same decorative color.

14. Floors with water areas, such as toilets and toilets. All of them are waterproof with polyurethane waterproof coating and waterproof latex paint.

15. All stone materials and floor tiles are treated with permeable waterproof and oil-proof agent for high-efficiency waterproof and moisture-proof treatment.

12, construction instructions

1. Main material requirements:

All materials, brands and colors are determined after the samples are confirmed.

(1). stone wall

Performance requirements

1. The allowable deviation of specifications and dimensions, the allowable limit tolerance of flatness, the allowable limit tolerance of angle, and the technical indicators of appearance quality of the plate all need to meet the JC205-92 standard of excellent products.

2. The mirror gloss unit of the mirror plate can clearly reflect the scenery;

3. The bulk density is 2.50g/cm.

4. The water absorption rate is 5%

5. Dry compressive strength 130MP0

6. Bending strength11.0mp0.

7. Wear resistance 12000 rpm has no obvious wear trace.

8. Acid resistance 0.22%

9. Alkali resistance 0. 12%

10. Shore hardness 85HSD

1 1. The radioactivity level is Grade A. ..

Wall construction technology

1. Check whether the concealed works within the scope of work meet the design requirements, whether the embedded pipes are qualified, and whether the position and quantity of ground sockets are consistent with the drawings of each type of work.

2. Some walls are constructed by dry hanging stone. Stone thickness standard 25; The thickness of dry paste is 20.

3. Adopt high-quality galvanized angle steel with corresponding bearing coefficient as skeleton.

4. For the expansion screw holes installed on the skeleton, attention must be paid to avoid all kinds of pipelines buried in concealed works.

5. Check the quality of stone, with square specifications and smooth surface.

6. Try paving, pre-arranging, numbering and classifying the stones with large area, many lines and great natural color changes, so as to make their patterns, colors and textures even and smooth.

7. Before installation, look for horizontal lines, vertical lines and frame lines.

Technical requirements for ground pavement

1. Check whether the concealed works within the scope of work meet the design requirements, whether the embedded pipes are qualified, and whether the position and quantity of ground sockets are consistent with the drawings of this type of work.

2. Check whether the flatness, verticality and strength of the operating surface meet the design requirements, and whether secondary leveling is needed.

3. Check the quality of stone, with square specifications and smooth surface.

4. Try paving, pre-arranging, numbering and classifying the stones with large area, many lines and great natural color changes, so as to make the patterns, colors and textures uniform and smooth.

5. Look for horizontal lines, vertical lines and frame lines before paving.

6. After paving for 24 hours, it is not allowed to trample or collide with the stone to avoid damage and looseness.

7. The laying of granite ground should be divided into two processes. First, use a 40-thick C20 fine stone concrete leveling layer (see the construction drawing for details when the building number is 50 or 70), and lay the pipeline. After the leveling layer is dried and stabilized, the granite shall be paved with dry 1: 2.5 cement sand, and the paving shall not be completed at one time.

8. Before paving, brush the cement slurry with water cement ratio of 0.4-0.5 on the base (or leveling layer) and spread the cement mortar layer with a brush;

9. Shop hardened cement mortar layer (leveling layer). The length of paving mortar should be greater than 1m, and the width should be 20- 30mm greater than the width of slab. The mortar thickness is 10- 15mm, and the virtual mortar on the ground is 3-5mm higher than the elevation line.

65438+

(2) Wood veneer

Material and process requirements:

1. The main materials are rosewood and mahogany. It is suggested that all veneer be entrusted to a professional manufacturer for construction. Surface decorative wood belongs to AA products that meet international standards.

2. Wood squares, whether made in China or imported, should be Grade A products with the same texture and color as the surface decorative board, and the moisture content should be controlled within 12%.

3. All base wood used for decoration shall be treated with fire prevention and moisture prevention.

4. The color of veneer shall be jointly determined by Party A and the designer.

(3) Ceramic vitrified brick

Product requirements

The product must meet the requirements of the national standard BG/T 4100.1-1999, and must meet the following indicators:

Water absorption: 0. 18%

Fracture modulus: 39 MPa

Length and width:++0.8mm.

Surface flatness: +0. 15%

Edge straightness, edge curvature and right angle: +0. 15%

Gloss: 65

Mohs hardness: 6

Radioactivity: class a.

Pollution resistance: Grade 3

Make a 45-degree profile according to the design requirements.

Ceramic tile construction technology:

65438+

2. Before tiling, choose tiles with uniform color and consistent size, so that the joints are uniform, the bricks are pre-arranged, and the dividing line and vertical and horizontal control line of color change are well played.

3. Paste should start from the bottom, hang the line according to the benchmark, and lay the shop line by line from bottom to top. The back of the brick should be covered with cement slurry, and the thickness is generally controlled within 2-3 mm. After the wall is pasted, it should be struck hard with a rubber hammer to cement the brick. At the same time, use a ruler to level the brick and the epithelium. After laying a row, check each brick again. If it is empty, it should be lifted and pasted in time.

4. After the paste is completed, after the initial setting of the paste cement, clean the brick surface with clear water, fill the joint with white cement slurry (the colored brick should be adjusted with mineral pigments according to the design requirements), and wipe the surface with cotton yarn and cloth after the completion until there is no trace of residual ash.

5. Quality requirements: the varieties, specifications, colors and patterns of ceramic tiles must meet the design requirements and the quality must meet the current standards; Ceramic tile mosaic must be firm, without hollowing, skew, lack of stare blankly, falling corners and cracks; Bricks shall be smooth, clean, uniform in color, free from alkali stains and obvious gloss damage, with dense and straight joints, consistent in width and color. The corner plates of Yin and Yang shall be pressed on the use parts of the whole brick, cut and matched with the sleeve of the whole brick, with neat edges, smooth kicking and no face sticking, with consistent thickness of protruding wall surface, correct slope direction of running water and straight drip line.

6. Allowable deviation: the verticality of the facade shall not exceed 2mm, the surface flatness shall not exceed 3mm, the squareness of the Yin and Yang angles shall not exceed 3mm, and the height difference of the joints shall not be less than 0.5mm.

7. Finished product protection: After the construction, the cement slurry and condensed water on the brick surface should be removed immediately to make the brick surface clean and free of sundries; Make the finished surface clean, seamless, free of debris, damage, firm adhesion or other defects; When the construction operation may damage the ceramic tile wall, protect the ceramic tile wall with protective cardboard or other protective covering.

(4). Latex paint finish

Material performance requirements

1. Cooked rubber powder adopts high-quality imported brands recognized by the owner and design institute.

2. Represents powder, smooth, white and free of impurities.

3. Gypsum powder, with natural gypsum as the main raw material.

4. Latex paint must meet the design requirements. Imported or joint venture brands with fine texture and stable performance are preferred. Try to use natural latex paint (Dulux is recommended).

5. It is recommended to use matching putty and matching primer for latex paint.

Technical requirements for construction

1. Use 1: 2.5- 1: 2 cement mortar to repair the missing edges and corners of the base, and use putty to fill the pits and cracks on the surface, and the surface of the base should be clean;

2. Scrape the putty at the grass-roots level with a scraper. It is required to scrape thin, collect cleanly, and be flat and free of flying thorns. After the putty is dry, use 1 sandpaper to polish it, pay attention to protect the edges and corners, and ensure that the surface is smooth and the line angles are straight and uniform;

3. Repeat step 2 twice, depending on the flatness of the base;

4. Brush the primer, brush it up and down, and the last row is followed by the previous row, which is connected with each other. Be careful not to expose the brush to maintain the consistency of latex paint;

5. Sandpaper: When the sandpaper is polished, it should be lightly polished, and at the same time, be careful not to wear through the primer, protect the edges and corners, and clean it up after the sandpaper is polished;

6. Apply the topcoat for three times: After the topcoat is dried, apply the topcoat for the second time. The consistency of latex paint should be moderate, and the amount of strokes dipped should be appropriate to prevent the brush lines from being too large. When brushing latex paint, attention should be paid to maintaining the consistency of latex paint to avoid brush leakage. Brush up and down when you brush, and the last stroke should be connected with the previous one. Gypsum board oil white (primer 888 three times; Top coat twice).

7. Quality requirements: uniform paint thickness, consistent color, clean surface, no pollution, color difference, overlapping traces, no peeling, alkali bite, brush leakage, sagging and other quality problems.

8. Remove oil stains on the wall and other construction influencing factors.

9. Brush the leveling layer on the original wall and fan the dust for about three times. Each layer must be thoroughly dried and the surface sanded repeatedly.

10. The consistency is too thick, which is easy to cause cracks or exposure and affect the quality.

1 1. is too thick, which is easy to cause cracking, falling off and insufficient adhesion.

12. The surface must be free of brush marks, bubbles and stains.

13. The color is even, smooth and smooth, and there is no blocking feeling.

14. No sag.

15. No bite marks, discoloration or local discoloration.

16. Operation technology and construction procedures must be coordinated.

4. Construction requirements:

1. The newly-built walls of this project are all made of qualified foamed cement board, a scientific research product of Huajun Group.

2. Unless otherwise specified, glazed tiles on indoor walls shall be hung. More than 4m part of the whole wall back bolt dry hanging.

3. Toilets, rooms with plenty of water, etc. It should be 20 mm lower than the building floor, and the ground should make a slope of not less than five thousandths to the floor drain. 300*600 Foshan Grace (W6860 19) Dali Shi Chao Jieliang polished brick (excellent), 300*600 Foshan Grace LW6860 19 Dali Shi Chao Jieliang polished brick (excellent), and the ceiling is paved with PPT board and white latex paint. Moreover, the main keel cannot be vertically attached to the bottom of the upper toilet, so please support the walls on both sides with horizontal steel keel.

4. The flatness tolerance of granite and marble wall and ground is PP% 1mm(2M feet).

5. The construction of wall and ceiling latex paint must be matched with primer and topcoat, and high elastic latex paint should be used for important parts of the ceiling.

6. All dry-hung stone-based steel shall be rustproof.

7. The wooden keel involved in the design should be treated with fire retardant coating for three times.

8. The selected fabrics and soft bags must be treated with flame retardant and fire prevention, so that the materials can meet the fire prevention requirements of B 1. All roller blinds adopt flame-retardant curtains.

9. Building decoration engineering construction must closely cooperate with professional drawings of water, electricity and air conditioning. If contradictions are found, relevant parties should be organized to solve them through consultation in time.

10. Other common room walls, not shown, are all 888-based white latex paint or wallpaper.

Verb (abbreviation of verb) illustrated

1. If the practices of nodes in the figure are different from those in this description, the practices in this description shall prevail.

2. The hole positioning dimensions of walls, doors and windows are the same as those of the original architectural design, except those marked.

3. Where the nodes in the drawings are not perfect, the design unit will improve them during the construction. The site-perfect construction drawings, including design changes, must be signed by the construction site design authorizer designated by the design unit before they become effective.

4. If the ceiling adopts the ceiling part of the specified product, the manufacturer shall provide the main and auxiliary keels, and the hanger builder shall take care of himself.

5. Lightweight steel keel ppt board ceiling is painted with white latex paint.

6. Wet paste 300*600 Foshan Grace (W6860 19) Dali Shi Chao Jieliang polished tile (excellent).

7. The interface between decoration major and related major in the drawing is coordinated by each major and determined according to the site conditions.

8. The elevation modeling and materials of the construction drawing in the renderings shall be subject to the renderings.

If the design atlas is inconsistent with the building structure, the actual situation on site shall prevail. If there is any error between the dimensions marked on the drawings and the site, please take the site dimensions as the standard.

Third, material selection.

1. The materials used in this design mainly include stone, floor tile, wooden foundation and decorative board, gypsum board, wall paint, stainless steel, mirror steel and black mirror. Some of them are imported products. The selection of the above products meets the requirements of national and industrial technical standards.

2. Wires, conduits, various electrical products, keel and other concealed engineering materials should be selected according to the requirements of design and relevant national codes to ensure that they meet the national acceptance standards.

Fourth, the construction technical requirements

1. The original building structure shall not be destroyed during construction. If this design conflicts with the original architectural design in the construction drawing, the architectural design shall be the basic basis.

2. The bathroom wall and floor below1m need to be waterproof, and the construction technology is three-felt and two-oil waterproof technology. The wooden foundation of the bathroom should be well preserved.

3. The moisture content of all kinds of wooden materials should not be greater than 12%, and imported wood glue should be pasted on the wooden connection parts.

4, wood veneer with polyester paint processing, paint film should conform to the national acceptance standards, maintain the color of veneer.

5. All the stones that need to be pasted are pasted with AB structural adhesive, and the joints of the stones are repaired with imported marble adhesive.

6. The installation height of all switches and sockets should be highly consistent, flat and firm.

7, special metal processing and installation process should be in accordance with the requirements of design drawings and process characteristics for processing and installation, should ensure the installation strength requirements.

Five, the construction environment requirements

1, when the wall coating is applied, the indoor temperature should not be lower than 5 degrees Celsius.

2, all kinds of pasting process construction, indoor temperature should not be lower than 65438+/-00 degrees Celsius.

3. When using adhesive, the indoor temperature required in the manual should be strictly observed.

Six, fire prevention process requirements

1. During the decoration construction, the original fire control facilities shall not be destroyed or changed without authorization.

2. Flammable materials used in construction should be treated with flame retardant. It is suggested that Dragon AE- 1 high efficiency organic flame retardant should be used for fire prevention, soaking and spraying.

3, ceiling construction, concealed work must be fire prevention treatment.

4. All threaded metal thin-walled pipes shall be sprayed with flame retardant.

Seven. additional remarks

1. The part of this architectural atlas without special design is a space with consistent style. Please refer to the drawings, and the designer of the construction party will make a plan on the spot after communicating with us.

2. All fa? ades must be set out at Party A's site for approval before construction. ..

3. All lamps, furniture, artistic decorations, etc. It should be customized or purchased in strict accordance with the style specified in the renderings.

4. The theme paintings and calligraphy works in this drawing set need to be redesigned by professional studios or famous artists according to the size of the site.

5. Suppliers of fire fighting, air conditioning, high voltage, low voltage and other related equipment should carry out in-depth design with reference to this atlas, and shall not affect the ceiling shape specified in this design.