Traditional Culture Encyclopedia - Hotel franchise - Installation method of integral floor drain in Japan

Installation method of integral floor drain in Japan

Integral floor drain is a common drainage facility in family toilets, kitchens and other places, and the following points should be paid attention to during installation:

1. Choose a good location: the floor drain should be close to the water source and drain pipe to facilitate drainage.

2. Make a construction plan: Make a reasonable construction plan according to the ground materials and the installation of floor drain.

3. Reserved space: When the floor is laid, the space required for floor drain should be reserved to ensure that the interfaces are attached to each other during installation.

4. Connect the drain pipe: connect the drain pipe to the floor drain and fix it with tape or screws.

5. Waterproof treatment: Before the floor drain is installed, the surrounding area should be waterproof to avoid water leakage.

6. Fix the floor drain: fix the floor drain on the ground and seal the gap with glue to ensure no water leakage.

7. Integral splicing: the floor drain and the drain are spliced into a whole to ensure the joint and avoid water backflow.

In short, when installing the integral floor drain, it needs to be taken seriously and fully considered to ensure the installation quality and use effect.