Traditional Culture Encyclopedia - Hotel franchise - Installation method of integral floor drain in Japan
Installation method of integral floor drain in Japan
1. Choose a good location: the floor drain should be close to the water source and drain pipe to facilitate drainage.
2. Make a construction plan: Make a reasonable construction plan according to the ground materials and the installation of floor drain.
3. Reserved space: When the floor is laid, the space required for floor drain should be reserved to ensure that the interfaces are attached to each other during installation.
4. Connect the drain pipe: connect the drain pipe to the floor drain and fix it with tape or screws.
5. Waterproof treatment: Before the floor drain is installed, the surrounding area should be waterproof to avoid water leakage.
6. Fix the floor drain: fix the floor drain on the ground and seal the gap with glue to ensure no water leakage.
7. Integral splicing: the floor drain and the drain are spliced into a whole to ensure the joint and avoid water backflow.
In short, when installing the integral floor drain, it needs to be taken seriously and fully considered to ensure the installation quality and use effect.
- Related articles
- What is massage essential oil?
- There are triple rooms and double rooms in the housekeeping department of a hotel for a fee.
- Perfect match between leopard print shirt and stockings
- Famous landmarks of Xiamen Yongshun Custer Hotel
- How to get from Hangzhou Diaoyifu Hospital to Zhejiang New Century Hotel by bus?
- Where is the best wedding in Hangzhou Old Yuhang?
- Is there a hotel in Shangqiu Guantang?
- How about Changde Shangshang Education Consulting Service Co., Ltd.?
- Is there a hotel nearby?
- How to tower Gao Legao screen door