Traditional Culture Encyclopedia - Hotel franchise - Construction organization design scheme of three-star hotel decoration project?

Construction organization design scheme of three-star hotel decoration project?

What is the specific content of the construction organization design scheme of the three-star hotel decoration project? Zhong Da Consulting will answer your questions below.

1, construction preparation

1. 1. 1 Before construction, the construction design drawings and main material samples shall be fully determined with Party A. ..

1. 1.2 Before construction, make a detailed material plan according to the engineering quantity and complete the preliminary work of ordering the main materials.

1. 1.3 Organize workers to learn the joint review construction drawing, make technical disclosure of drawings and construction technology to various professional construction teams, and issue relevant technical disclosure cards, quality management cards, quality inspection sheets and other documents.

1. 1.4 Do a good job in the preliminary work for the entry of machines, tools and materials.

2. Construction deployment

According to the characteristics of layered distribution of construction operation surface, combined with the material transportation situation and the sequence of personnel entering the site, it is proposed to divide the whole construction site into three construction operation areas: the first area is the first to third floors above ground, the first floor courtyard and the facade; The second area is the basement, the fourth to tenth floors above ground and the roof; The third area is electromechanical installation and reconstruction projects. Set up section construction foreman, at the same time, adopt professional construction teams in three construction areas to carry out the construction deployment of combining parallel running water with interchange, closely cooperate with professional construction teams to carry out parallel running water construction at the grass-roots level, and carry out the construction of combining parallel running water with interchange for decorative surface installation part, make full use of the construction characteristics of various professions, speed up the construction progress, clarify the construction responsibilities and ensure the construction period.

3, the construction process

Demolition and cleaning of original facilities → air conditioning system renovation project → fire fighting system renovation project → water supply and drainage system renovation project → main bridge project of strong and weak current system → installation of ceiling keel → laying of electrical pipeline → laying of water supply and drainage and air conditioning branch pipes → wall waterproofing → preparation of wall cylindrical wood base → installation of wall cylindrical stone → ceiling sealing plate → installation of wall wooden decorative surface, aluminum plate, stainless steel and glass decorative surface → laying of ground stone → ceiling and wall coating.