The first stage: complete the preliminary cleaning of the site.

1. Open the window for ventilation and close the inspection after work.

2. All work should be cleaned layer by layer from top to bottom, from the middle to the stairs on both sides.

3. Collect and arrange the equipment and articles to be left behind, put them in a unified way, notify the leaders of relevant departments, and clean up the left-behind articles.

4. Collect, classify, check and count recyclable items and make records, and hand them over to relevant departments.

5. Select and confirm the garbage station, divide the garbage and saleable items, and clear the large and small items out of the field in turn as required.

Notes in Articles 1, 2 and 3: If there is any left-over equipment, check whether it is powered on, and handle it carefully to avoid injury. When items are placed in a unified way, they should be managed by classification and recorded clearly. In the process of handling, you should not be too impatient, and you should not knock against corners, walls, shapes, floors, doors and windows, stair handrails, especially people. When cleaning up the garbage, use the prepared garbage bags to clear it out, so as to avoid repeated work caused by falling down during walking or blowing away in windy weather. The items that can be sold are classified according to: iron, copper, nails, wood, wires and paper, then bound and stored, and contacted relevant personnel to take them away.

6. Clean up the dirt, cement and sand in the ground area to avoid the dust, dirt and ash flying on the roof, walls and dead corners caused by large-scale cleaning, which will bring difficulties to the next work.

7. Clean the stairs from the outside to the inside, so as not to affect others going up and down the stairs.

8. If the construction personnel are not completely evacuated, they must be cleaned in groups at work and may not act alone.

9. Carpet floor, check the joints, and surround the carpet with plastic, cartons, boards, etc. Avoid bringing dust or stepping on the carpet surface for a long time during work.

10. When using the vacuum cleaner, the garbage and filter screen in the bucket should be cleaned in time to avoid increasing the load, and it should be suspended for a period of time when using it, which is beneficial to prolonging the service life of the vacuum cleaner.

1 1. Make a detailed inspection of your own division of labor to see if there are any unqualified items, such as whether the wallpaper is pasted, whether the switch is effective, whether the floor tiles and wall tiles are damaged and cracked, whether the window glass is damaged, whether the water supply and drainage are normal, whether the lamps are on, whether the exhaust and air conditioning can work normally, and so on.

The second stage:

Details, precautions and cleaning standards of hygiene and cleaning. From high to low, from top to bottom, from inside to outside. Open the window to ventilate.

A, the ground cleaning matters needing attention:

1. Remove the garbage and dust on the ground.

2. Surround the surrounding wooden structure with waste cloth.

3. Mop the floor with a wet mop, or sprinkle a small amount of water on the ground (it is easier to scrape and wash after the ground is wet), and then gently scrape off the cement blocks and paint on the ground with a shovel and a blade, paying attention to avoid scratching the ground.

4. Wipe the floor with a clean mop and pay attention to the surrounding wooden structure. Then check whether there are cement stains that have not been cleaned, and then clean them carefully.

5. Cover the clean ground with paper and protect it.