Traditional Culture Encyclopedia - Hotel franchise - Time Adjustment of the First and Last Bus of Beijing Metro Line 4

Time Adjustment of the First and Last Bus of Beijing Metro Line 4

Recently, in order to meet the travel needs of passengers sooner or later, Beijing has adjusted the first and last bus times of Beijing 4- Daxing Line. The following is the adjusted timetable of Metro Line 4-Daxing Line and the specific details of the first and last buses. Let's have a look!

Beijing Metro will adjust the first and last bus times of Line 4-Daxing from August 1 and 202 1.

The first and last bus times of anheqiao north station Tiangongyuan Station to Dajiao Road and anheqiao north station Gongyi Xiqiao Station to Jiao Xiao Road 4- Daxing Line have been adjusted. The first bus is advanced and the last bus is delayed. Among them, in the time adjustment of the first and last buses, the first bus leaves 25 minutes in advance, that is, the first bus from Tiangongyuan Station to anheqiao north station leaves 25 minutes in advance and the last bus leaves 0/5 minutes later, that is, the last bus from anheqiao north station to Tiangongyuan Station.

After the first and last bus times of 4- Daxing Line are adjusted, it will provide passengers with more flexible and convenient travel services. On the one hand, it meets the needs of passengers leaving the subway early and returning late, and commuting calmly; On the other hand, under the epidemic prevention and control, passengers can have more choices in subway travel time.

The adjusted timetable for the first and last buses of Metro Line 4-Daxing is as follows:

2011August 10 Beijing Metro Line 4-Daxing First and Last Bus Timetable

In order to cooperate with this adjustment, Jinggang Metro will remind passengers of the relevant information of stations along the 4- Daxing Line through in-station broadcasting and in-station announcements. The staff will also strengthen inspections and provide timely advice and services to passengers. In addition, passengers can get the time information of the first and last bus in time through the official accounts of official website, Weibo and WeChat of Beijing-Hong Kong Metro.

At the same time, in view of the current epidemic situation, Jinggang Metro continues to strengthen the epidemic prevention work of all lines and stations under its jurisdiction to ensure the safety of passengers' travel, continuously strengthen the disinfection and ventilation work of stations and trains, and timely disinfect the equipment in the station that is in close contact with passengers, such as security checkpoints, gates and ticket vending machines; At the same time, scientifically and accurately implement five basic epidemic prevention measures, such as ventilation, disinfection, temperature measurement, setting up isolation zones and wearing masks, and strengthen safety protection measures to ensure the safety of passengers.

In recent years, Beijing-Hong Kong Metro has also carried out a number of measures, such as the renovation of Xizhimen air conditioning system on Line 4, the renovation of multi-functional areas of trains on Line 4, and the renovation of two-way gates at 14 stations, to continuously improve passengers' travel experience and facilitate passengers' travel. At the same time, this year is also the first year of the 14 th Five-Year Plan. Previously, Jinggang Metro launched an intelligent inspection robot for pilot substations to improve the operation and maintenance level to ensure passengers' travel, shorten the travel interval of Daxing Line, optimize traffic organization and provide passengers with a quality travel experience.

In the future, Jinggang Metro will continue to provide quality services to passengers, continue to explore more feasible solutions, improve the level of operational services and provide greater convenience for passengers to travel.