Traditional Culture Encyclopedia - Hotel reservation - Summary of curtain wall construction personnel's work
Summary of curtain wall construction personnel's work
Time flies and a piece of work is over. After this period of hard work, we have made greater progress in our continuous growth. It's time to write a work summary. How to write a work summary to attract more attention? The following is a summary of the curtain wall builder's work I compiled for you, which is for reference only and I hope it will help you.
Summary of curtain wall builder's work 1 Time flies, and 20XX years are fleeting; Wrapped in white, welcome the arrival of 20XX. 20XX was an extraordinary year for me, and it was also an important turning point in my life-I switched from civil engineering to curtain wall. Looking back on the past year's work, I have the joy of fruitful results, the hardships of tackling key problems with my colleagues, and the melancholy when I encounter difficulties and setbacks, from which I have learned a lot. I am very grateful to xxxxxx Curtain Wall Decoration Co., Ltd. for providing me with a platform for growth, so that I can keep learning and making progress in my work and gradually improve my quality and talents.
Here, I would like to express my heartfelt thanks to the respected leaders and dear colleagues of the company. Your help can make my work go smoothly. Thanks for your help, I can put the company's development in by going up one flight of stairs; You really supported me. It can be said that 20XX is the initial stage for xxxxxx Curtain Wall Shanghai Branch to expand the Shanghai market, and I am glad to grow with it in such an environment. Below I will summarize the specific work of this year.
I. Main Work
(1) May-July in xxxxxx Curtain Wall Decoration Co., Ltd.
Xxx Du Xing Project Department. Through one and a half months' practice and study, I have a general understanding of curtain wall industry: I have a clear definition of building curtain wall, I know the types of common curtain walls, I know the technological process of curtain wall construction, and I know some commonly used materials and equipment for glass curtain walls. At the same time, I am also here to assist the management of the project department to check the installation quality, measuring and setting out, and safety management of the curtain wall.
The company's processing workshop. Research on door and window tracking of aluk system in Chunshen City. During the 20 days in the workshop, due to the urgency of these doors and windows, part of the time was allocated to unwrap the wrapping paper. Of course, this is not the hope of the company leaders, nor is it my own sincerity, but I will be loyal to my duties when assigned to a post. Part of the time, I was watching the process flow of workshop processing: a process from unloading → counting → warehousing → unpacking → wearing insulation strips → cutting → washing cans, drilling → assembly → loading and delivery.
(2) July-September, 20xx, Shanghai Chunshen Jingcheng Project Department. The work in the first two months is mainly in the learning stage. Through these two months of study, I have a preliminary understanding of the door and window curtain wall. When I came here, I also actively participated in the project management team. The main responsibilities here are:
(1) Count the materials when entering the site and arrange the stacking area.
(2) On-site material quality inspection
(3) 1 ~ 4 # building steel auxiliary frame self-inspection, rectification sheet issuance, Party A's review, supervision and acceptance.
(4) 1 ~ 4 # building aluminum door window frame self-inspection, open a rectification sheet, and Party A will review, supervise and accept it. ..
(5) finished product protection inspection of1~ 4 # building.
(6) Organize the supervisor to spray test and maintain 1~4# building.
(7) The factory of 7)aluk fittings and film covering picks up the goods.
(8) Draw the processing diagram of doors and windows of 5 and 6 # buildings.
(3) From September, 20XX to June, 20xx, and June, 65438+ 10, I worked as a project manager in xxxxxx Curtain Wall Shanghai Branch, and managed two construction sites, namely Wujiafang model house and Lujiazui x2 plot elevator garage curtain wall renovation project. Mainly responsible for the work are:
(1) Arrange the construction period according to the requirements of the general contractor.
(2) Organize the installation team to enter the site and sign the contract.
(3) Coordinate the implementation of workshop processing, Shaoxing material procurement and Shanghai local procurement and other supply matters.
(4) Communication and coordination with owners, consultants, general contractors, subcontractors and supervisors.
(5) Collect relevant information and submit it to the supervisor for approval.
Summary of curtain wall construction personnel's work 2 I. General situation of the project
The project was built by Shanghai Zhangjiang Jire Integrated Circuit Industrial Park Development Co., Ltd., and the building is positioned as a business office, a star-rated hotel and an exhibition complex. The site is located at the intersection of Dong Zhang Road and Dangui Road in Pudong New Area. The project consists of four units: 1# room, 2# room, 3# room and exhibition center, with 1/floor above ground and1floor underground, with a total curtain wall construction area of 45000m2.
Second, the design requirements
The curtain wall is designed as a semi-hidden frame arc glass curtain wall, and the main column of curtain wall keel and hidden frame beam are made of 6063-T5. The curtain wall area of this project is large, and columns and beams are also made of 6063-T5, and other materials are 6063-T5. The thickness of anodic oxide film for surface treatment is not less than15 μ m, and all curtain walls are made of 6LOW-E+ 12A+6mm low-radiation tempered ultra-white insulating glass.
Third, the material inspection
All the materials used in this project come into the site according to the design requirements, and the material performance indexes meet the design requirements. After the materials enter the site, witness sampling shall be carried out according to the material witness sampling standard and submitted for inspection, and the technical indicators of re-inspection shall meet the design and specification requirements. The specific inspection is as follows:
23 groups of insulating glass were sent for inspection, and the evaluation conclusion was: qualified.
Check the air tightness, water tightness (fluctuating pressurization method), wind pressure resistance and in-plane deformation performance of the building curtain wall. The conclusion of one-way judgment meets the design requirements, and the overall evaluation conclusion meets the engineering design requirements.
Mineral wool was sent to 2 groups for inspection, and the test values all met the design requirements.
Three groups of building silicone structural sealant and weather-resistant building sealant are submitted for inspection, and the evaluation conclusion is: compliance. Curtain wall keel profile 6063-T6 is submitted for inspection in 3 groups; 6063-T6 is sent to three groups for inspection, and all the evaluation conclusions are: it meets the design requirements.
Fourth, the construction process control
This project is in the construction stage of glass curtain wall project. Our unit carefully organizes the construction according to the design drawings, actively controls the construction quality and progress, and corrects the deviation in time during the construction.
Curtain wall engineering is a hidden frame curved glass, so the construction control is a bit difficult. When the main keel of curtain wall is positioned and constructed, the center of arc curtain wall has been blocked by the wall, so it is difficult to measure and set out. My project department actively tries to find a way to finally set up positioning control points, calculate them by CAD lofting with computer technology, and then measure the control points on site in sections. Finally, hang steel wire vertical control lines at the upper and lower ends to ensure the correct position of the main keel of the curtain wall.
Communicate with the construction unit, design unit and supervision unit in time for all kinds of problems encountered in the construction. In order to seek the help of all stakeholders, in the construction of the 8-story arc-shaped fan-shaped independent curtain wall, when the constructional column passes through the curtain wall, my project department communicates with the supervision design unit in time, and checks with the design unit to determine the modification scheme, and finally solves the problem satisfactorily through design modification. Do not waste materials and delay the construction progress.
With the help and joint efforts of quality inspection station, construction unit, design unit and supervision unit, the glass curtain wall project was successfully completed.
Verb (abbreviation of verb) building acceptance
20xx began to purchase and process curtain wall projects. All the glass curtain wall projects were successfully completed on xx, xx, XX, XX. After my project manager organized the design, construction, supervision and other relevant personnel, * * * conducted self-inspection evaluation on the completed projects, curtain wall guarantee projects and measured projects, and the evaluation results were qualified.
Summary of curtain wall builder's work 3. When the calendar was torn to the last page, a year passed unconsciously. This year, we measured the glow of the sky with a five-meter steel ruler and knocked out 10 thousand stars with a calculator. We keep a happiness, a persistence and a harvest. Calculate, calculate, summarize and prepare reports; Although I have no outstanding achievements and earth-shattering career, I do my best and be loyal to my duties. Over the past year, with this plain life and plain work, I have outlined the trajectory of life and gained the joy of harvest.
During the 20XX years, with the support and help of company leaders and colleagues, I quickly adapted to the work. Looking back on my work during this period, I have made great progress in thought, study and work, and I have grown a lot, but at the same time I have deeply realized my own shortcomings. Personal work experience this year is summarized as follows:
Summary of study, work and life
As budgeters, our main job every day is to calculate the quantities of curtain walls, doors and windows. At the beginning, I always used what I learned in books to calculate the quantity, and my mind was fixed. I can't get out of the shackles of books, and I can't combine theory with practice, so the actual workload is quite different from the workload I calculated. I was really at a loss at that time and felt that I was not suitable for this job. Finally, through the guidance of my superiors and colleagues, I gradually realized that occupation is only a continuation of students' life, and it is important to learn it at school. Now as long as there is something I don't understand, I will often run to the scene, and after comparison, I can accurately calculate the engineering quantity. It is said that practice is the criterion for testing truth, and now I really understand the meaning of this sentence.
Since I joined the work, what I have learned most is carefulness, patience and responsibility. Every time we encounter a little problem in our work, the superior leaders will tell us earnestly: "These quantities we calculate are directly linked to money and cannot be sloppy. If something goes wrong, none of us can bear the responsibility. If you don't know anything, just ask more, see more and run more. Don't always follow our own ideas. The scene is our teacher. The company gave us not only a job, but also a copy. Although I am still a newcomer to the budget department and lack of experience, I believe that with my hard work and high sense of responsibility, I will do my work perfectly, and I am confident and determined!
Second, career planning.
It doesn't matter where you stand today, what matters is where you are going next. In my philosophy of life, life should not be a simple cycle and repetition, and everyone should interpret his own life in his own unique way. Therefore, I hope my life can move in the direction I set. The following is my plan for my short-term career:
1. Interpersonal communication: get along well with colleagues and bosses and have good interpersonal relationships.
2. Work situation: Complete the work seriously and excellently.
3. Education, knowledge: As a budgeter, it is not enough to know drawings, but also to draw pictures and calculate engineering quantities with software. In order to make the future work more smooth, I will use my spare time to learn CAD drawing software and Guanglianda pricing software. Read more books on architecture and try to get professional certificates.
Three. Suggestions or opinions on the development of the Group
From going to work, from knowing nothing about Su Xin Group to getting familiar with it, I feel the changes of myself and our XX Group. Now I summarize some of my thoughts as follows:
1, the company should pay attention to improving the work efficiency of employees. I think endless work will only make people physically and mentally exhausted, lose their enthusiasm for work, and work efficiency will naturally decline. A normal holiday can reduce the pressure on employees and let them combine work and rest. I suggest that the company can practice on weekends, but considering that it is difficult for the Ministry of Commerce to implement this regulation, it is suggested that employees can take turns to be on duty on rest days, which can better reflect the humanized management of the company caring for employees.
2. I hope that the company can create more opportunities and choose appropriate time for collective activities according to departments, which can promote communication between colleagues and leaders, relax tense working mood, enhance the cohesion of departments, exercise everyone's initiative and cultivate centripetal force for enterprises.
3. Learning problems. I hope that every time the company has any professional training, it can take care of the middle and lower level employees, because the competition in the social market is so fierce now, and the overall quality of employees is the key to the success or failure of the enterprise. The existence of a company is based on the chairman of the board, the leaders of various departments and the middle and lower employees.
4. Take stock of yesterday, grasp today and look forward to tomorrow. This year, there were achievements and shortcomings, joy and bitterness, but harvest was the theme. Although I didn't do anything earth-shattering, I reflected the meaning of work and the value of life in every little thing. Finally, I want to thank the leaders at all levels of the company for giving me the space, courage and confidence to grow up, and thank my colleagues for their concern and help. I will continue to work hard and make a modest contribution to the development of the group! The new year is coming, I wish you good health and all the best!
;
- Previous article:Wuhan went to Guangzhou Tianhe Stadium to watch Yoga Lin's concert.
- Next article:Hotels and hostels near Beijing South Railway Station
- Related articles
- Riyue wedding hotel
- Who lives in Dashiyuan, Nanchang?
- Introduction to the application fields and appreciation methods of black-and-white abstract painting
- How about Anhui Changshou International Hotel Co., Ltd.
- Traveling to Qinghai, one hotel a day, what can I do with washing clothes?
- Who built Zhiyuan Oak House?
- How much is the Yikang landscape in China per square meter?
- Do you need face recognition when staying in a hotel in Hengshan, Hunan?
- How far is it from Xingren high-speed railway station to the old bus station?
- Dazhou citizens with overlapping trajectories should report immediately.