Traditional Culture Encyclopedia - Hotel reservation - Is it necessary to install fire protection in a hotel with a 1000 square meter bungalow?

Is it necessary to install fire protection in a hotel with a 1000 square meter bungalow?

Need.

According to the provisions of Article 13 of the Regulations on Supervision and Administration of Fire Protection in Construction Projects, in any of the following circumstances, the construction unit shall apply to the fire control institution of the public security organ for fire control design audit in crowded places, and apply for fire control acceptance to the fire control institution of the public security organ that issued the fire control design audit opinion after the completion of the construction project:

(a) stadiums, auditoriums, public exhibition halls and museum exhibition halls with a total construction area of more than 20,000 square meters;

(2) Civil airport terminals, passenger station waiting rooms and passenger station waiting rooms with a total construction area exceeding10.5 million square meters;

(3) Hotels, restaurants, shopping malls and markets with a total construction area of 1 1,000 square meters or more;

(4) theaters, public library reading rooms, business indoor fitness and leisure places, hospital outpatient buildings, teaching buildings, university libraries and canteens, production and processing workshops of labor-intensive enterprises, temples and churches with a total construction area of more than 2,500 square meters;

(5) Children's rooms in nurseries and kindergartens with a total construction area of 1000 square meters or more, indoor places for children's activities such as children's play halls, ward buildings in nursing homes, welfare homes, hospitals and sanatoriums, teaching buildings, libraries and canteens in primary and secondary schools, dormitories in schools and dormitories for workers in labor-intensive enterprises;

(6) Song and dance halls, video halls, projection halls, karaoke halls, nightclubs, amusement halls, saunas, Internet cafes, bars, restaurants, teahouses and cafes with entertainment functions with a total construction area of over 500 square meters.

Extended data:

Necessary construction procedures of fire protection installation project

1, installation preparation and material requirements

(1) Before the construction of the fire fighting project, Party A must be assisted in the design review of the fire fighting facilities, and construction is not allowed without design review or unqualified design review.

(2) Before the construction of the fire control project, relevant information must be declared to the fire control department, and a fire control construction permit must be obtained.

(3) The selected materials must be registered in the fire department and have a quasi-sale certificate issued by the fire department.

2, fire engineering construction stage

Install the nozzle, alarm valve group, fire hydrant box and other components.

3. Commissioning and acceptance of fire protection system?

Baidu Encyclopedia-Provisions on Supervision and Administration of Fire Protection in Construction Projects