Traditional Culture Encyclopedia - Hotel reservation - Details of how to make a lighting ceiling.
Details of how to make a lighting ceiling.
The details are as follows:
Measurement and setting-out: Based on the axis control line and building elevation line measured uniformly during the decoration project stage, use a wire drop to hang around the reserved opening on the sun board roof. on the anti-beam, and pop up the center line of the solar panel ceiling. At the same time, measure the elevation to the outside of the anti-beam around the reserved opening on the roof, and pop up the elevation control line. Check the structural deviation according to the detailed design dimensions as a basis for the detailed design.
Detailed design: According to the dimensions and requirements of the design and construction drawings, combined with the actual measurements on site, the board arrangement design and node detail size design are carried out. The board arrangement principle is to lay out the boards symmetrically from the middle to both ends.
Use a steel pipe frame to set up scaffolding on the floor where the sun panel ceiling is located. It should be set up in a ladder shape according to the curved sun panel ceiling, and the scaffolding boards should be laid about 1700mm from the top. Attention should be paid to the finished product protection of installed moving walks.
Embedded parts: According to the position of the main frame of the sun panel ceiling on the elevation control line, check whether the elevation of the upper surface of the opening anti-beam meets the design requirements. If there is any difference, it should be chiseled or leveled with high-strength grade cement mortar. After reaching the strength, release the expansion bolt position line according to the size of the embedded steel plate in the detailed design node drawing, then drill holes to install the expansion bolts, and install the steel plate and fix it with the expansion bolts. Then project the center line of the main frame onto the embedded steel plate.
Install the inner solar panel: According to the location of the drawing, install the inner 16mm thick solar panel of appropriate size. During installation, the bottom of the upper panel should be wiped clean with a white towel. At the same time, The inner layer of solar panels must be cleaned before installation is allowed to avoid contamination of the interlayer that cannot be cleaned and affect the macro effect.
After all the solar panels are installed, the perimeter of the outer eaves of the solar panel ceiling must also be constructed according to the nodes in the drawings. The protective shed can be dismantled only after all the outer eaves (including the glass curtain gable) are sealed. The protective shed must be dismantled in accordance with the requirements for scaffolding, and the finished product must be protected to prevent the finished product from being damaged.
- Previous article:How can I get to Hai folli Jing Hotel on the pedestrian street from Changsha Railway Station?
- Next article:Hotel exterior wall materials
- Related articles
- Bus from Zhongmu Yin Xin Express Hotel to Fangte
- What are the specifications of the dining table turntable?
- How to soak sweet and sour crispy radish in a restaurant
- Reflections on Reading Swan Playing Trumpet
- What is the name of the isolation hotel near Jinan Railway Station?
- Ask for cheap hotels in Haidian District, Chaoyang District and Xuanwu District of Beijing, preferably in universities, with a price below 100 yuan.
- The best university to study fashion management in Britain.
- Post-war development of Kai Tak Airport in Hong Kong
- Xiamen tourism
- Which is better, Chimelong Penguin Hotel or Circus Hotel?