Installation method of floor drain in Australian apartment

In Australia, the installation of floor drain in apartments is a very important job. The installation of floor drain can effectively avoid water leakage and ensure the safety and hygiene of residence. The following are the steps of floor drain installation:

1. Measurement-Before the floor drain is installed, measure it to confirm the location and size of the floor drain.

2. Prepare tools-The tools needed for floor drain installation include wrenches, screwdrivers, plumb lines, rulers, etc.

3. Preparation materials-The materials needed to install the floor drain include sealant, screws, filling materials, etc.

4. Installation of pipes-first of all, you need to install drainage pipes and connect them to the floor drain to ensure that water leakage will not flow indoors.

5. Install the floor drain-confirm the size and position of the floor drain according to the measurement results, and then install the floor drain at the designated position and fix it with screws.

6. Testing-After the installation is completed, testing shall be conducted. You can test it with water to see if there is any leakage.

7. Finish-After inspection, there is no water leakage problem, and the installation is complete.

In a word, the installation of floor drain needs careful operation to ensure safety and hygiene, and adequate preparations should be made before installation to avoid the recurrence of problems.