Traditional Culture Encyclopedia - Hotel reservation - A farmer plans to plant cucumbers and leeks, with a planting area of no more than 50 mu and an investment of 540,000 yuan. What is the output, cost and sales volume of planting cucumbers and leeks in
A farmer plans to plant cucumbers and leeks, with a planting area of no more than 50 mu and an investment of 540,000 yuan. What is the output, cost and sales volume of planting cucumbers and leeks in
Then the objective function is z = (0.55× 4x-1.2x)+(0.3× 6y-0.9y) = x+0.9y. 。
The linear constraints are x+y≤50 1.2x+0.9y≤54x≥0, and y≥0.
That is, x+y≤504x+3y≤ 180x≥0, y≥0, and the feasible region represented by the inequality group x+y≤504x+3y≤ 180x≥0, y≥0 is made.
It is easy to find points A (0,50), B (30,20) and C (0,45).
Translating the straight line z=x+0.9y, we know that when the straight line z=x+0.9y? When passing through point B (30,20), that is, x=30 and y=20, Z reaches the maximum value, and Zmax=48 (ten thousand yuan).
Therefore, when the planting area of cucumber and leek should be 30 mu and 20 mu respectively, the profit will be the largest.
Therefore, the planting area of cucumber is 30 mu.
So the answer is: 30.
- Previous article:The mysterious guest in the bar
- Next article:Best Hotel in Olympic Sports Center
- Related articles
- Application skills and matters needing attention of magic color flash paint
- Which brand of moon cakes in Guangzhou is delicious?
- What is the shampoo in a star hotel?
- How to take the subway from Clone Hotel to Shenyang Railway Station?
- How to get to Beijing South Railway Station from Yitel Hotel (Beijing Zhongguancun Software Park)
- In case of a hotel fire, how should the waiter evacuate the guests?
- How to manage hotel rooms with WeChat
- Which community is the Optical Valley No.2 Hotel?
- Does Meizu mobile phone have a specialty store in Jiangmen?
- Never miss buying sleeping bags?