Traditional Culture Encyclopedia - Hotel reservation - What are the main properties of soft film smallpox? What is the installation method of soft film smallpox?
What are the main properties of soft film smallpox? What is the installation method of soft film smallpox?
Safety: the fire protection standard of soft film is the national standard "B 1", which is suitable for shopping malls, hospitals, libraries, public places of entertainment, etc. Adding BIO-PRUF in the production process can effectively inhibit Staphylococcus aureus, Hepatitis B and other pathogenic bacteria, and after mildew prevention treatment, TLZY soft film adopts the most advanced environmentally-friendly and non-toxic formula, which contains no harmful substances such as cadmium, lead and ethanol, and no toxic substances are released, and can be recycled at 100%. It will not have any impact on the environment during manufacturing, transportation, installation, use and recycling. Completely in line with the environmental protection theme of today's society; Especially suitable for hospitals, school swimming pools, baby rooms, bathrooms and other places. At the same time, through the relevant tests in professional colleges, it is proved that TLZY soft film has a good sound absorption effect on low-frequency sound, and the perforated surface has a good sound absorption effect on high-frequency sound, which is very suitable for concert halls, conference rooms and schools.
Excellent anti-aging quality: the soft film and buckle edge of TLZY soft film have undergone special anti-aging treatment, and the keel is made of aluminum alloy, with a service life of more than ten years. We will replace smallpox for free if it is damaged, deformed or discolored by people within ten years. The dimensional stability of the soft film is-15 to 55 degrees Celsius.
Whether in conference rooms, auditoriums, sports venues, hotels, exhibition halls, entertainment places, offices or home decoration, the soft film ceiling materials of Nature Sound can meet the needs of different levels and give full play to its superior side. The diverse characteristics of Tianyi soft membrane material are incomparable to traditional ceiling, and it is gradually becoming the first choice of ceiling products for interior decoration. At the same time, it is also a soft sculpture for excellent designers to fully display their creative space full of personal charm! All these characteristics make the soft film ceiling material become a new decorative highlight in the ceiling decoration industry.
Construction scheme of flexible membrane suspended ceiling
Construction coordination measures:
The installation of flexible membrane ceiling needs construction cooperation to ensure quality and timely completion.
1. Before the flexible membrane ceiling enters the site, ensure that the site is electrified and there is no construction waste.
2. The bottom treatment of flexible membrane ceiling meets the ceiling installation conditions, such as keel frame installation. Be clean.
3. The installation of all lamps and lanterns must be carried out in accordance with the required dimensions proposed by us, the wiring should be well arranged, and all lamps and lanterns should be electrified and bright. Before installing the soft film, if any lamps are not bright, they should be adjusted and replaced in time. The interior of the hidden lamp should be painted white to achieve better effect.
4. Air conditioning, fire pipes, etc. It must be arranged in advance, and there is no problem in installation and debugging. Tuyere, nozzle and smoke detector should meet our requirements after installation.
5. After the installation of the flexible membrane ceiling, if the painter needs to repair the gypsum board ceiling, should he not touch the flexible membrane ceiling?
Installation steps of three-dimensional irregular flexible membrane ceiling:
Step one:
1. According to the design requirements of the drawings, a circle of 4X4Cm supporting keel (wood square or square steel pipe) is fixed around the horizontal position where the flexible membrane ceiling needs to be installed. (See the construction design drawing for details). Note: When the area of some places is relatively large, it is required to install in blocks to achieve good results, so a wooden square bar should be added in the middle. This is actually handled according to the actual situation.
2. After all the required battens are fixed, the aluminum alloy keel of the flexible membrane ceiling is fixedly installed on the bottom surface of the supporting keel. (See the construction design drawing for details)
Step two:
1. When all aluminum alloy keels with flexible membrane ceilings are fixed, install the flexible membrane again. First, open the soft film, fully and evenly heat it with a special heating air gun, then insert the soft film into the aluminum alloy keel with a special inserting knife, and finally completely trim the redundant soft film. (See the construction design drawing for details)
2. After installation, clean the soft film smallpox with a clean towel.
Installation rules of flexible membrane ceiling:
1. Go to the construction site first to see if it is possible to install the keel: that is, to see whether the wall site is completed, whether the woodworking part is qualified, and the plastering part needs to be completed first. Pay special attention to the woodworking part, and do it according to our requirements. The opening sizes of lamps and tuyeres should be processed in advance.
2. Site conditions allow Licensor to enter the site for construction. First of all, carpenters should do a good job of fixing aluminum alloy keel according to the design requirements of drawings. Note that the right angle must be flat and smooth, and the joint should be flat and dense.
3. Pay attention to the light frame, tuyere and smooth tube plate to be flush with the surrounding keel, and be firm and stable without swinging.
4. Smoke, ceiling lamp, position first and then make a wooden underframe. The bottom of the wooden underframe should be polished and smooth, and pay attention to the horizontal height. If it is too low, it is easy to highlight the trace of the chassis.
5. Before installing smallpox, carefully check whether the keel joint is firm and smooth, spray head should be glued with white tape, and the tuyere should be handled well. When installing smallpox, it should be fixed from the middle to both sides, and at the same time, pay attention to the dimensions of both sides, pay attention to the straight weld, and finally make an angle position, and pay attention to flatness. Trim and remove excess smallpox when the surroundings are ready. Achieve a perfect edge-closing effect.
6. Lamp hole: mark the position of the lamp hole, carefully and accurately stick the PVC lamp ring on the bottom of the soft film, and remove the excess smallpox after it is firm.
7. Air opening and smooth pipe nozzle: Find the position of smooth pipe nozzle at the air opening, install soft film on the aluminum alloy keel as it is, and pay attention to the straight angle. When finished, remove excess smallpox.
8. Finally, clean the surface of soft film smallpox with a clean towel.
Safety and civilized measures:
The installation of soft film smallpox should have professional and technical personnel and use special equipment and tools. In addition to observing the safety regulations on site, technicians should also pay attention to the following points in combination with the construction characteristics of the company:
1. Workers should dress neatly and cleanly, which is conducive to the installation of soft film.
2. Workers need work shoes and pay attention to work safety.
3. The special equipment air cannon should be able to use gas safely.
4. The construction site should be clean, leaving no flammable items.
Please refer to: /shownews.asp? id= 176
/shownews.asp? id= 183
- Related articles
- Zhengzhou pizza is delicious.
- The mobile phone of Yun Jie Hotel Management System can't log in.
- Does Typhoon Sura have an impact on Xiamen?
- What is xroom?
- /kloc-What hotel is cheaper for 0/0 days?
- Can the boss sue for conspiracy after inviting employees to the hotel?
- What are the better large-scale software development companies in Shanghai?
- What preparations do you need to make to travel to America? What are the precautions?
- How can I get to Hilton Hotel, No.27 Lingnan Avenue North, Chancheng District, Foshan from the East Station subway?
- I plan to travel to Yunnan. How many days is suitable for playing? Which scenic spots are the best must-see attractions? How to arrange the route? Find a reliable local guide.