Traditional Culture Encyclopedia - Hotel reservation - Standard building construction contract

Standard building construction contract

In today's developing countries, contracts are more and more helpful to us. The contract is both a guarantee and a constraint for both parties. So how to write a detailed contract? The following is a sample of standard building construction contracts (5 selected) compiled by me. Welcome to share.

Employer of standard building construction contract 1 (full name):

Legal representative or its entrusted agent:

Contractor (full name):

Legal representative or its entrusted agent:

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and relevant laws and regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties reached a consensus on the project construction and related matters, and reached the following agreement:

I. Overview of the Project

1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

3. Project approval number: _ _ _ _ _ _ _ _ _ _ _.

4. Source of funds: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

5. Project content: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

6. Project contracting scope: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Second, the contract period

Planned commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Planned completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Total calendar days of construction period: _ _ _ _ _ _ _ days. If the total calendar days of the construction period are inconsistent with the total calendar days of the construction period calculated according to the above planned commencement and completion dates, the total calendar days of the construction period shall prevail.

Third, the quality standard

The project quality meets the requirements of _ _ _ _ _ _ _ _ _ _ _ _

Four. Sign the contract price and the contract price form

1. The contract price is RMB (in words: _ _ _ _ _ _ _) (RMB _ _ _ _ _ _ _);

These include:

(1) Safety and civilized construction measure fee: RMB (in words _ _ _ _ _ _ _ _ _) (RMB _ _ _ _ _ _ _ _ _);

(2) Provisional estimated amount of materials and engineering equipment: RMB (in words _ _ _ _ _ _ _ _) (¥);

(3) Provisional appraisal amount of professional engineering: RMB (in words: _ _ _ _ _ _ _) (RMB _ _ _ _ _ _ _);

(4) Provisional amount: RMB (in words _ _ _ _ _ _ _ _ _) (RMB _ _ _ _ _ _ _);

2. Form of contract price: _ _ _ _ _ _ _ _ _ _ _ _ _.

Verb (short for verb) Project manager

The project manager of the contractor: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Composition of intransitive verb contract documents

This agreement constitutes the contract document together with the following documents:

(1) Letter of Acceptance (if any);

(2) Letter of Tender and its attachments (if any);

(3) Special contract terms and their annexes;

(4) General contract terms;

(5) Technical standards and requirements;

(6) drawings;

(7) The priced bill of quantities or budget;

(8) Other contract documents.

Contract-related documents formed in the process of contract conclusion and performance are an integral part of contract documents.

The above-mentioned contract documents include the supplements and modifications made by both parties to the contract, and the newly signed documents belonging to the same category shall prevail. The special contract terms and their annexes shall be signed or sealed by both parties to the contract.

Seven. promise

1. The Employer promises to go through the project examination and approval procedures in accordance with the law, raise construction funds and pay the contract price according to the time limit and method agreed in the contract.

2. The contractor promises to organize the completion of the project construction in accordance with the law and the contract, to ensure the quality and safety of the project, not to subcontract or illegally subcontract, and to undertake corresponding engineering maintenance responsibilities during the defect liability period and warranty period.

3. If the employer and the contractor sign the contract through bidding, both parties understand and promise not to sign other agreements on the same project that deviate from the substantive content of the contract.

Eight. Breach of Contract, Claims and Disputes

1. The Employer and the Contractor shall abide by the above agreement. If one party violates the agreement and causes economic losses to the other party, it shall pay corresponding compensation.

2. Any dispute arising from the performance of this contract shall be settled by both parties through negotiation or a third party shall be invited for mediation. If negotiation or mediation fails, both parties agree to apply to the _ _ _ _ _ _ _ _ _ Arbitration Commission for arbitration.

Nine. Signature time

This contract is signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

X. Signing place

This contract was signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

XI。 supplementary agreement

For matters not covered in this contract, both parties shall sign a supplementary agreement separately, which is an integral part of this contract.

Twelve. Entry into force of contract

This contract will come into effect on.

Thirteen. Contract number

This Contract is signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A (signature): _ _ _ _ _ _ Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Phone number: _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Standard Building Construction Contract 2 Party A: XXXXX Co., Ltd.

Party B: XXXX Limited

According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC), the Regulations on the Contract of Construction and Installation Projects and other relevant laws and administrative regulations, both parties reached an agreement on the following construction matters through consultation on the basis of the principles of equality, voluntariness, fairness and good faith:

I. Project name:

Ding XX

Second, the project site selection:

XXX in Daqing city.

Third, the project content:

Underground pile foundation engineering, 1# building and skirt building engineering. Foundation construction of superfluid concrete cast-in-place pile. The total amount of concrete works is about 2000 cubic meters. In the end, the actual engineering quantity audited by Party A, Party B and the on-site representative of the supervisor shall prevail, and this engineering quantity shall be taken as the basis of project settlement.

Fourth, the project price and contracting method

1. Party A pays Party B the project payment. Unilateral cost: reinforced concrete per cubic meter 1000 yuan. The project price is calculated according to the actual engineering quantity.

(1) The cost of this project has included labor insurance co-ordination fee, safety production measures fee, general contracting service fee, taxes and other fees.

(2) The project price has included the inspection and test expenses of water and electricity, related raw materials and semi-finished products.

(3) The final settlement is based on the actual engineering quantity, and the engineering quantity calculation is based on the design drawing size and relevant regulations. The site representatives of Party A, Party B and the Supervisor shall be responsible for the confirmation, which shall be subject to the final confirmation of Party A, Party B and the Supervisor.

(4) Party B is responsible for paying 2% tax to Party A, and Party A is responsible for the rest.

2, the way of contracting

(1) Party B undertakes the contract in the form of labor and materials, and Party B is responsible for the construction according to the construction plan approved by Party A and the supervisor, and provides labor and materials such as mechanical drilling, concrete pouring, fabrication and placement of reinforcing cages.

(2) The water and electricity costs of this project shall be borne by Party B..

(3) Party A is responsible for supervising the construction of Party B's pile foundation project and providing the site, while Party B is responsible for the construction and settlement of temporary buildings such as migrant workers' temporary dormitories, and Party A is only responsible for paying the project funds to Party B according to the contract.

3. Party B's construction work shall be supervised by Party A and the supervisor. Party B shall carry out the construction in strict accordance with the construction drawing design and pile foundation specifications, and Party B shall be responsible for any safety and quality accidents.

Verb (abbreviation of verb) payment terms

1. After the signing of this contract, after all personnel, materials and equipment of Party B enter the site, 30% of the project payment paid by Party A to Party B shall be the project advance payment; In the future, the project funds will be allocated according to the image progress. After the completion of the pile foundation project, 20% of the project cost will be reserved. After the pile test is qualified, the supervision unit, design unit and Party A and Party B pass the acceptance of the sub-project of pile foundation, and Party B will make the final settlement after handing over the corresponding pile foundation data.

2. Party A shall deduct 5% of the project payment as the quality guarantee, and pay it in full within one year after the project is completed and accepted.

VI. Project Duration

After the contract comes into effect, Party B's labor, materials, machinery and equipment shall be in place, started and completed according to the date approved by Party A and the supervisor. Party B shall carry out continuous operation during the construction. Duration: from the date of drilling 10 days (effective working days). If the construction site does not have the construction conditions, the construction period will be postponed.

Seven, quality requirements

1, according to the design drawings, the construction organization design approved by Party A, Party B and the supervisor and relevant specifications. The quality of the project has reached the "qualified" standard. All responsibilities and economic losses caused by unqualified quality due to Party B shall be borne by Party B. ..

2. Within 20 days after the completion of the project, Party B shall provide four complete and detailed indoor technical materials to the supervision unit and Party A before Party A allocates the last project payment.

Eight. duties and obligations

Responsibilities and obligations of Party A:

Party A shall provide the construction site and access required to ensure the construction of pile foundation engineering, and provide all working conditions for the construction of pile foundation engineering.

Responsibilities and obligations of Party B:

1, Party B shall cooperate with the construction team in piling the pile foundation under the supervision of the supervisor.

Foundation positioning and setting-out. The spoil produced in the construction process shall be jointly borne by Party A, Party B, the construction unit and the excavation construction team.

2. Party B shall prepare construction machinery, materials and labor in advance, and enter the site for construction according to the date approved by Party A and the supervisor and the date specified by Party A. ..

3. Within five days before the project starts, Party B shall provide Party A and the supervisor with the construction organization design and progress plan for approval. Party B must carry out the construction according to the approved plan and accept the inspection and supervision of Party A and the supervisor at any time.

4. If Party B can't work normally due to soil reasons (such as muddy silty soil) during the construction, Party B is obliged to take all measures to ensure the construction quality and construction period, and all expenses arising therefrom shall be borne by Party B, and the construction period shall be postponed.

5. Party B shall carry out the construction in strict accordance with the relevant national industrial operation regulations; The type, specification, size, concrete strength grade and bearing capacity of single pile of piles and reinforcement in piles must meet the design requirements; During the pile test, Party B shall meet the necessary conditions for pile test. If the bearing capacity (actual use value) of the pile after construction fails to meet the design requirements, Party B shall bear the liability for breach of contract at 30% of the project cost.

6. Party B shall carefully carry out the construction according to the standards, specifications, design requirements and construction scheme approved by Party A and the supervisor, and accept the inspection at any time to provide convenient conditions for the inspection. Obey the supervision and management of Party A and the supervision engineer during the construction.

7. If the project meets the conditions of covering and covering, Party B shall notify Party A and the supervisor in time for acceptance after passing the self-inspection. Only after Party A's on-site professionals and supervision engineers have passed the acceptance test can the construction be concealed or continued.

8. If Party B encounters underground obstacles, cavities, civil air defense, etc. In the process of construction, Party A, on-site professionals and supervision units shall be informed in time for handling. Party B has the obligation to take all measures to ensure the construction period and quality.

9. Party B shall actively cooperate with Party A, the supervisor and the construction unit, and obey the construction management and technical management of Party A and the supervision unit.

10. Party B guarantees that all labor, materials and equipment will enter the site within three days after receiving the written notice from Party A. ..

1 1. Early strength agent must be added to the test pile, and the expenses shall be borne by Party B. ..

12. Party B shall be responsible for the test and inspection of raw materials and test blocks, and bear the test and inspection expenses.

13, responsible for sorting out the information in the industry and handing it over to the supervisor and Party A after the completion acceptance.

14, safety in production Party B shall make a careful construction safety assurance plan during the construction stage of pile foundation engineering, and make safety technical disclosure to ensure the safety of the construction site. In case of any safety accident at the construction site due to Party B's reasons, Party B shall bear all responsibilities and expenses.

Responsibilities and obligations of Party A

1, do a good job of "three links and one leveling" on the construction site.

2. Cooperate with Party B and the construction team to provide the project elevation control points and main axis, and submit them to Party B in writing. Party B is responsible for setting out and positioning, and the construction can only be started after Party A and the supervisor have passed the line inspection.

3. Provide Party B with water and electricity for construction and connect to the construction site, and all expenses arising therefrom shall be borne by Party B. ..

4. Responsible for coordinating the relevant formalities of the construction administrative department.

Nine. any other business

This contract shall come into effect after being signed by both parties. If there are any outstanding matters, both parties shall negotiate and sign a supplementary agreement, which has the same effect as this contract. Matters not covered in this agreement shall be settled by both parties through consultation.

This contract is made in quadruplicate, two for Party A and two for Party B. Each contract has the same legal effect.

Party A (signature): _ _ _ _ _ _ Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Phone number: _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Standard Building Construction Contract 3 Employer (Party A):

Contractor (Party B):

Contractor:

According to the Contract Law of People's Republic of China (PRC) and relevant laws and administrative regulations, following the principles of equality, voluntariness, fairness and good faith, and combining with the specific conditions of this project, both parties reached the following agreement through consultation:

I. Project name:

Second, the project site selection:

(place of contract performance)

Three. Scope of contract:

Four. Contract price:

Verb (abbreviation for verb) settlement method:

Settlement shall be made according to the actual backfill quantity.

Terms of payment for intransitive verbs:

After the project starts, Party B shall report the progress on a monthly basis, calculate the progress payment according to the quantities confirmed by the supervisor and Party A and the contract lump sum unit price, and transfer the payment within 7 days according to the payment ratio of 85%, and Party B shall issue the project invoice.

Seven. Responsibilities of Party A and Party B:

1. Party A's responsibilities:

(1) Provide Party B with relevant drawings and engineering geological data, and ensure that the data are true and accurate.

(2) Submit the leveling points and coordinate points to Party B in written form and submit them on site.

(3) Organize the blue prints.the design between Party B and the design unit, and make design disclosure to Party B. ..

(4) Coordinate the protection of underground pipelines around the construction site.

2. Party B's responsibilities:

(1) Do a good job in protecting underground pipelines and adjacent buildings and structures on the construction site.

(2) Have the obligation to carry out civilized construction on the construction site and ensure construction at night.

(3) Carry out the construction in strict accordance with the standards, specifications and design requirements and the instructions issued by Party A's representative according to the contract. Accept the inspection of Party A's representative at any time.

Eight, safety responsibility:

1, construction enterprises must strictly implement the relevant provisions and terms of safety production and construction.

2. If Party B fails to carry out the construction according to the contract and production safety regulations, Party A's written and oral requirements for Party B's site are valid. As Party B fails to make rectification according to the written and oral requirements put forward by Party A, Party B shall be responsible for the safety responsibilities arising therefrom.

Nine. Other agreements:

1. For matters not covered in this contract, both parties can negotiate amicably.

2. This contract is made in quadruplicate, with Party A and Party B holding two copies respectively. This contract shall come into effect after being signed and sealed by both parties, and become invalid after payment.

Party A (signature): _ _ _ _ _ _ Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Phone number: _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Standard Building Construction Contract 4 Party A: Xiangxiang

Party B: Cheng Feng

According to the Contract Law of People's Republic of China (PRC), national building construction codes and relevant regulations, and based on the principle of mutual benefit, Party A decided to contract out the hotel project of Xing 'an Century Glacier Tourist Area to Party B for construction management. In order to further clarify the responsibilities and rights of both parties, the following agreement is signed:

I. Overview of the Project:

1, project name: Xing 'an Century Glacier Lingfo Tourist Hotel Building Project.

2. Project Location: Leshitang Village, Xianqiao Village Committee, Yan Guan Town, xing an.

3. Building structure: (frame structure) A building is about 26,000m2.

4. Contract content and construction scope: The civil hydropower project shall conform to the architectural construction drawing, structural construction drawing, hydropower construction drawing and design description. Hotel decoration will be signed separately.

5. Contracting method: contracting for work and materials.

6. The project cost is tentatively set at 30 million yuan.

Second, the payment method and settlement:

1. The works within the scope of this contract are based on the design drawings and documents provided by Party A, as well as the pricing standard of the quantities actually completed by Party B. The civil works and water and electricity installation are priced according to the consumption quota of Guangxi Zhuang Autonomous Region in XX, and will be settled to Party B after falling by 6%.

2. During the construction period, the materials used in the project scope shall be adjusted according to the Xing 'an cost information released by Guilin Construction Engineering Cost Management Station. Materials not included in Xing 'an are adjusted according to the current cost information of Guilin. If there is no information price, both parties shall determine it through friendly negotiation according to the market price and settle the account according to the actual engineering quantity.

Third, the time limit for a project:

1. The effective duration of this project is 240 days.

2. Commencement time: before June 20th, 20 1 1 year (subject to Party A's notice of entry).

3. Completion time: (calculated according to the actual commencement date)

Four, quality and material requirements:

1, the quality requirements meet the national quality standards and specifications for construction projects, and the grade is qualified.

2. Every time Party B completes a sub-item, it must report to Party A's representative, supervisor, technical director and quality inspector for acceptance. And sign according to the acceptance opinions before entering the next working procedure.

3. After receiving Party B's written application, Party A must organize relevant personnel to arrive at the designated place for acceptance within 48 hours, otherwise, Party A must sign for approval after Party B's construction.

4. Materials must be of good quality and quantity. All incoming materials must have factory certificates, and materials that need re-inspection according to national regulations can only be used after passing the inspection at the quality inspection station.

Five, the project payment method:

1. This project is funded by Party B: from the foundation earthwork excavation to the 00 th floor (cast-in-place is completed).

2. After Party B's advance payment is in place, Party A shall pay 80% of the project progress payment to Party B according to the actual completed quantities. After each layer is completed, a progress payment will be paid, and so on.

3. If Party B stops work for more than 20 days due to Party B's funds in advance, Party A has the right to terminate the contract, and all losses shall be borne by Party B. ..

4. After the project is completed and accepted, Party B's qualified materials and statements shall be submitted to Party A for review. Party A must complete the review within 30 working days after receiving the application materials. If there is any dispute, it can be entrusted to the relevant cost firm for review. After the settlement is approved by Party A, it shall be paid in one lump sum within three months without default, except for the 3% quality deposit.

5. If Party A fails to pay according to the contract, it shall pay 3‰ of the total amount owed to Party B every day, and so on.

6. All project funds of this project must be remitted to the account opening unit of Party B;

Bank of deposit:

Bank: On the account.

Six, project completion acceptance and delivery:

1. Before the delivery of the project, Party B must do a good job in detail rectification, sanitation, safety and security, project storage and other related work before delivery. After the self-inspection is qualified, it shall be reported to Party A and the supervision engineer in writing for re-inspection and signed to confirm that the re-inspection is qualified before delivery, otherwise the contractor shall be responsible for the losses caused thereby.

2. Within 10 days after receiving Party B's qualified information and written statement, Party A must organize relevant personnel to be present for completion acceptance and visa, otherwise it will be deemed as qualified.

3. Before both parties deliver the visa, Party A shall not occupy the visa, otherwise it will be deemed as qualified and delivered to Party A for use.

Seven. Rights and responsibilities of Party A and Party B

1. Party A must provide accurate geological underground pipeline information before construction, ensure that all protective articles are not damaged, and ensure that the three links and one leveling are completed three days before Party B enters the site.

2. Party A shall cooperate with Party B to handle the management procedures of construction noise and environmental sanitation.

4. Provide standard leveling points and detailed coordinate control points to guide Party B's site construction. During the construction period, Party A must negotiate all social relations around it. Ensure the smooth progress of the construction.

5. Party A shall not delay the payment time for any reason or excuse when paying the project funds.

6. Party B must carry out the construction in strict accordance with the design requirements and construction specifications of the drawings. When Party A's management personnel find that the construction quality can't meet the requirements of design and construction specifications, they have the right to ask Party B to stop work for rectification and give corresponding punishment.

7. Waterproof materials and aluminum alloy window materials must be designed according to the drawings, and can only be used with the consent of Party A. ..

8. During the construction period, Party B must do a good job in safety education. Ensure safe production and civilized construction. In case of any safety accident due to Party B, all responsibilities shall be borne by Party B, which has nothing to do with Party A.. ..

Eight, breach of contract

1. Both parties shall abide by the terms of this agreement, and Party A must coordinate the construction party to handle all social relations around it. If villagers and other personnel make trouble without reason and hinder the construction, all losses caused by project shutdown shall be borne by Party A (except for Party B's own reasons).

2. Party B shall carry out the construction in strict accordance with the contract period, and shall not delay the construction period or stop work without reason. In case of violation of this contract, Party A has the right to terminate the project contract, and all losses shall be borne by Party B. ..

3. After this contract comes into effect after being signed by the other party, Party B must pay Party A a project quality deposit of three hundred thousand yuan only. The money will be returned to Party B in one lump sum when Party B's advance payment expires.

4. This contract is made in quadruplicate, with Party A and Party B holding two copies respectively. It takes effect immediately after being signed by both parties, and both parties must abide by it and have legal effect at the same time.

Party A (signature): _ _ _ _ _ _ Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Phone number: _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Standard Building Construction Contract 5 Employer: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

Party A has newly built an eight-story full-frame dormitory building in Anzhou Community, Beita District. Both parties have reached an agreement on the construction of this construction project in accordance with the Contract Law of People's Republic of China (PRC) and the Construction Law of People's Republic of China (PRC), following the principles of equality, voluntariness, fairness and good faith.

I. Project name:

Shaoyang Beita district zizao community andudi

Second, the project address:

Shaoyang Beita district zizao community andudi

Third, the construction area:

Full-frame structure *** 1 1 floor, with a total construction area of about 1488 square meters (the floating board and gutter of structures outside the construction area are calculated as the whole area, and the awning and air conditioning board are calculated as the half area). Note: the area in brackets is not calculated according to the regulations, and Party A is responsible for the construction of water and electricity, and the salary is paid by Party A..

Four. Scope and content of the contract

1. Main contents: Carry out construction according to Party A's requirements, design scheme and relevant building requirements of Party A, including pavement embossing and lump-sum construction. The height of each floor of the house is 3 meters, and the first floor is 3 meters. 8 meters, 0. 00, and calculate other expenses of Party B, which is a one-time payment.

2, ancillary works, should be calculated according to the actual.

3. Party A is responsible for water and electricity.

4. Leave the door opening indoors, powder the door cover, and purchase the prefabricated components by Party A. ..

Five, materials and engineering quality requirements

1, the quality of major projects must reach one-time acceptance,

2. Party B shall seriously carry out the construction according to Party A's requirements and intentions, and accept Party A's inspection and acceptance at any time.

3. If the project quality is unqualified due to Party B's reasons, Party B shall bear all the responsibilities. If the project quality does not meet the standard, Party B shall re-construct it according to Party A's requirements and standards until it meets the standard, and all expenses shall be borne by Party B. ..

4. If Party A requires Party B to conduct unreasonable construction, Party A shall be responsible for the quality and loss of the project.

5. The external wall is 100 100 or (100200) square brick, and the roof is integrally calendered at one time. Party A is responsible for waterproof roofing.

The contract mode and contract price of intransitive verbs

1. This project is contracted without materials, and the contract price is 220 yuan/m2, and Party B is responsible for safety insurance.

2. Party A is responsible for pouring concrete, binding steel bars, shuttering, backfilling and tamping. Machines and tools, wire binding, wires and nails shall be the responsibility of Party B. Party A shall be responsible for the internal steel pipe scaffold, movable frame and fastener oil cap, and Party B shall be responsible for binding the external frame.

Seven, the time limit for a project requirements

The total construction period is * * * 180 days, 20xx years1October 27th to July 27th.

Eight. terms of payment

The total project price is about 327,360 yuan. After the contract is signed, Party B will pay 30,000 yuan in advance for the entrance fee and materials preparation, 65% of the total project price for the main body of each floor, and 33% of the total project price for the interior and exterior decoration of each floor. Leave 2% for one-time payment after completion acceptance.

Nine. Responsibility of both parties

1. Party A shall ensure that the project payment is in place in time to prevent the project from stopping due to financial problems, and Party A shall be responsible for failing to reach the expected progress.

2. If Party A fails to perform the responsibilities stipulated in the contract and the construction cannot be carried out normally due to financial reasons, it shall compensate Party B for the actual losses caused by the extension of the construction period. ..

3. The contractor shall not subcontract the contracted project to others, nor shall he subcontract the contracted project to others in the name of subcontracting, otherwise the contract will be automatically terminated.

4. Based on the principle of sincere cooperation and self-compliance, Party A and Party B earnestly perform their duties and assist in keeping secrets.

5. This contract is made in quadruplicate, with each party holding two copies. This contract will come into effect as soon as it is signed, and the employer and the contractor will perform all the obligations of this contract. The contractor will automatically guarantee to pay the completion settlement, and this contract will automatically terminate.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _