With the continuous enhancement of people's legal concept, contracts appear more and more in our lives. When an agreement is reached, we can enjoy certain freedom of contracting. You know, there is a way to write a contract. The following is a simple and effective contract template (7 general terms) that I have carefully compiled, hoping to help you.
1 Simple and effective contract for tiling Party A:
Party B:
Party A subcontracts exterior wall tiles to Party B, and in order to clarify the responsibilities, rights and obligations of both parties, following the principles of equality, voluntariness, honesty and credibility, both parties reach the following agreement through negotiation:
I. Scope and content of contract work:
1. Handling, hoisting, reasonable pasting, jointing and cleaning of external wall bricks.
2. Exterior wall tiles should be clean and cross-contaminated, and constructed in a safe and civilized manner.
Second, the quality requirements:
1, and paste it according to Party A's technical disclosure requirements, without any quality defects such as hollowing, so as to ensure the engineering quality.
2, subdivisional work quality must conform to the requirements of the design documents and the current construction quality acceptance specification, the quality is qualified.
Third, the time limit for a project requirements:
1, from the date of commencement, complete all projects on time according to the overall construction period of the project department.
2. If the project is not completed on time and the construction period is delayed, it will be fined 3 yuan /m2 until the site is cleared.
Fourth, the contract unit price:
According to the actual pasting area, the receiver: external wall brick: 33 yuan /m2, internal wall brick and floor tile: 24 yuan /m2, step brick and skirting brick: 38 yuan /m2 (including base cleaning and priming).
Five, the project payment:
After the completion of the project, Party A shall pay 60% in proportion to each payment. The remaining works shall be paid to 95% before the Spring Festival of 20xx, and the rest shall be paid as warranty money after the warranty period expires.
Six, quality warranty:
The warranty period is one year. If there is a quality problem within one year, it will be repaired unconditionally. In case of quality problems after one year, Party B shall be responsible for the maintenance, and the expenses shall be borne by Party A..
Seven, site management and rewards and punishments:
1, the mixing mortar must be used up every day, the machines and tools should be rinsed clean, and sporadic external wall bricks should be collected and cleaned, otherwise a fine will be imposed 100 ~ 200 yuan.
2. After the workers enter the site, the construction can only be started after safety education and safety technical disclosure.
3. Operators outside the roof frame must fasten their seat belts and wear safety helmets. In case of violation, a fine of 65438 yuan +00 yuan/person/time will be imposed.
4. It is forbidden to introduce workers who are old, weak and sick, especially those with symptoms such as hypertension, dizziness and acrophobia, into the construction site.
5, in the construction personnel must obey the management of the project department.
6. It is forbidden to cut corners and change materials at will. If any unqualified materials are found, Party B will be fined 500 ~ 1000 yuan.
7, homework personnel must be carried out in accordance with the operating procedures, not brutal construction.
8. Entering the construction site shall not damage the finished building, semi-finished building or public property. Otherwise, in addition to compensating the corresponding products (finished products), depending on the seriousness of the case, a fine of 100 ~ 500 yuan will be imposed.
9. Don't make trouble or fight on the construction site. If there is such a phenomenon, the project department will impose a fine of 5000 yuan on the two teams fighting, and then coordinate to solve it. If the negotiation is not good, it will be handed over to the local police station for handling.
10. If the construction personnel commit theft in this project, Party B will be fined 20 times to 5,000 yuan in addition to deducting all the labor wages of both parties.
1 1. Workers must submit a copy of their ID cards to the Project Department for archiving after entering the site. If a safety accident occurs during the construction of the project and violates the safety operation rules, all expenses shall be borne by Party B, and both parties shall bear 50%.
12. The Project Department does not provide accommodation at the construction site. The transportation is kept by everyone. Be responsible for any loss.
13, the construction personnel present shall abide by other rules and regulations formulated by the project department, and if there is any violation, they shall be punished according to the corresponding punishment methods.
Eight. This agreement is made in duplicate, one for each party.
Party A:
Party B:
Date:
Simple and Effective Brick Sticking Contract 2 Party A:
Party B:
Through friendly negotiation between Party A and Party B, Party A subcontracted its own external wall bricklaying project on the first floor of Kailongcheng Community in Longling to Party B for construction. Get the following * * * knowledge:
1. Construction site: Kailongcheng Community, Longling.
2. Subcontracting method and unit price, single package, the contractor's first-floor external wall shall be bricked according to scattered area, with 40 yuan per square meter, and the wall shall be jointing and washed. Floor tiles for walkways on the first floor are 25 yuan per square meter. Stair steps are 30 yuan for each step, and each corner platform is three steps. Triangular brick and skirting line are per meter 15 yuan. The dimensions and contact angles of the above engineering materials shall be provided by Party A. ..
3. Payment method: Party A shall pay the appropriate living expenses in advance 10 days after Party B enters the site for construction. After 0/0 days of construction/KLOC-0, Party B shall pay the corresponding living expenses in advance, and pay 80% of the actual project amount to Party B at the end of the month, and the remaining 20% of the balance shall be paid to Party B in one lump sum within 7 days after the project completion and acceptance.
4. Party A must accept Party B's construction within one week after completion. If Party A does not accept it, it will accept it by default.
5. If one party violates the above contract, it shall bear a penalty of 5,000 yuan.
6. The above contract shall come into effect after being signed by both parties.
7. Supplementary Contract: During the construction period, if Party A has no materials after four days, Party A will pay cost of living allowance to Party B at the rate of 100 yuan per person per day.
This contract is made in duplicate, one for each party.
Party A:
Party B:
Date:
Simple and Effective Brick Sticking Contract 3 Party A:
Party B:
According to (People's Republic of China (PRC) Contract Law) and relevant regulations, Party A and Party B sign this contract through friendly negotiation on the principle of mutual benefit and in combination with the specific conditions of this project.
Article 1 General situation of the project
1, project name:
2. Project location:
3. Building area: about 30,000 square meters.
The second construction section
1. Party B shall complete all agreed contents of this contract within 30 days (including legal holidays) after the signing of this contract.
2. In any of the following circumstances, the construction period can be extended according to the actual situation after negotiation by both parties:
(1) If the cumulative power outage exceeds 8 hours due to water cut, the construction period will be postponed after Party B provides evidence and Party A verifies it.
(2) If the construction is affected by other types of work, the construction period may be appropriately extended after being approved by Party A..
Article 3 Project Cost and Payment Method
1, project cost:
2. Project settlement: The final settlement of engineering quantity is based on the actual pasting area of the external wall (㎡).
3. Payment method: 70% of the total cost of the external wall brick project is paid in cash; 30% of the total project cost of exterior wall tiles shall be paid by one room (if the sum of the house price and 70% of the total project cost exceeds the total project cost of exterior wall tiles, Party B shall return it to Party A in cash).
4. Payment method: Without advance payment, Party A shall pay 50% of the project progress payment to Party B on a monthly basis. After Party B completes all the contents agreed in the contract, and is accepted by the owner, the supervisor, Party A and the competent department, the technical documents for completion are complete, and the quantities are checked and signed correctly, Party A shall pay Party B 95% of the total cost of the external wall brick project (after deducting the paid total project cost and house payment), and keep the quality deposit of 5% of the total project cost. The warranty period shall be calculated from the date of project completion acceptance. If there is no quality problem, breach of contract or repair, it shall be paid to Party B without interest after 30 days (if there is repair, the warranty period shall be recalculated from the date of repair acceptance).
Article 4 Quality standards
Carry out the construction in strict accordance with the construction drawings and Party A's requirements, and the construction technology and standards shall meet the requirements of the following codes and regulations:
1, mandatory provisions of engineering construction standards 20xx version
2. Unified standard for construction quality acceptance of building engineering (GB50300—20xx)
3. Code for Construction and Acceptance of Exterior Wall Bricks (JJ126—20xx)
4, Liaoning province installation engineering construction technology operating procedures
5. See the drawings for structural requirements and decoration requirements.
6. Exterior wall split brick shall be pasted, with flat surface, straight angle of yin and yang, even and straight gap, smooth joint and firm base surface, and there shall be no flooding (in case of flooding, Party B shall unconditionally clean the exterior wall brick surface until the wall surface is no longer flooded, and pay Party B a quality deposit without interest after being signed and confirmed by Party A), broken brick and other phenomena.
7. The breakage rate of brick splitting is allowed to be 5%, and the excess shall be borne by Party B. ..
Article 5 Safety in production
In the process of construction, Party B shall assume the responsibility and obligation of safe construction, abide by the relevant norms and regulations of safe construction, and handle relevant insurance by itself. Party B shall be responsible for all safety accidents in the construction process and bear all relevant expenses. If personal injury and property loss are caused to the third party, Party B shall be responsible.
Article 6 Site management
1. Party B shall educate the construction personnel to abide by the law, care for property and protect the finished products of other types of work. In case of violation of the site management system or illegal acts, Party A has the right to take necessary measures and order it to compensate for economic losses.
2. Before entering the site, Party B shall make safety disclosure and technical disclosure to the workers, and report to Party A to protect the finished products.
3. Party B's on-site construction personnel should remain stable (submit the list of on-site personnel and a copy of ID card to Party A's project department), and those outside the list are not allowed to enter the site or stay.
Article 7 responsibilities of both parties
(I) Work of Party A
1. Party A is responsible for coordinating the supervision and cooperation of Party B, checking the quality and controlling the progress.
2. Party A is responsible for coordinating all construction units to carry out crossover operation.
3. Party A is responsible for providing Party B with water and electricity for construction.
4. Party A provides dormitories and vertical transportation.
(II) Party B's responsibilities
1, arrange enough construction personnel to complete the construction contents agreed in the contract.
2. Party B shall be responsible for site protection to avoid surface damage, scratches, pollution and damage.
3. Party B shall inspect the grass-roots before construction, and put forward the parts that do not meet the requirements of inlay and pasting in time, and Party A shall be responsible for renovation to make them meet the requirements of inlay and pasting. Party B shall clean up the base course, and then carry out the pasting construction after reaching the pasting requirements. Party B shall be responsible for all quality accidents after pasting.
4. Protect the finished products of the surviving tiles to avoid the damage and pollution caused by the construction of other types of work.
5. Adhesive and caulking agent shall be provided by Party B.. If the wall is flooded with alkali, Party B shall bear all responsibilities and expenses.
6. Party B should pay attention to the protection of finished products of other types of work during the construction. If the finished products of other jobs are damaged or polluted, Party B shall be responsible for maintenance and compensation.
7. Party B shall educate on-site workers about law-abiding, safe and civilized construction, and all losses, responsibilities and expenses caused by violation of laws and regulations in the construction process shall be borne by Party B. ..
8. Carry out the construction in strict accordance with the construction technical specifications, guide the workers' technical operation, and ensure the mosaic quality of the project. Party B shall provide and construct the adhesives, jointing agents and inlays for the external wall, and Party B must ensure that the tiles will not fall off after construction (within the service period stipulated by the state). During the period of construction, acceptance and completion, and within 3 years from the date of completion of the project, Party B shall take full responsibility for the phenomenon of external wall tiles falling off, and shall be responsible for all losses (such as falling people or things, maintenance, etc.). ) shall be borne by Party B. ..
8. Party B shall provide legal and valid invoices before applying for payment.
Article 8 Liability for breach of contract
1. The construction quality of Party B shall be in strict accordance with the requirements of specifications and drawings.
2. If Party B fails to complete the project within the time limit agreed in the contract due to its fault, Party B shall bear the penalty of 1% of the total project cost for each day of delay. If the overdue period exceeds 5 days, Party A has the right to terminate the contract, and Party B shall pay 30% of the total contract price to Party A in addition to the paid amount; Delay and extension of construction period due to Party A's reasons.
3. Party B shall purchase materials needed for construction in strict accordance with the technical parameters such as brand and technology agreed in the contract, and shall not replace or forge them without authorization. If Party B is found to have the above situation, Party B shall pay Party A a penalty of 30% of the total contract amount and compensate Party A for all economic losses caused thereby.
Article 9 Acceptance guarantee
1. Party B shall notify Party A in writing three days before completion, and Party A shall organize acceptance within one week, and give approval or modification opinions. The qualified part shall be kept by Party A..
2. The warranty period of this project is one year (the warranty period for controlling the falling off of external wall tiles is three years, see the specific agreement), counting from the date when the project is completed and accepted by the owner, supervisor, Party A and the competent department; Since the date of acceptance of maintenance work.
3. Party B guarantees that the materials and construction technology it provides meet the requirements of various indexes. After the construction, if Party A finds that Party B has quality problems such as quality defects, Party B shall bear all liabilities for breach of contract such as maintenance, replacement and payment of liquidated damages.
Article 10 Other matters
1. If there are matters not covered in this contract, both parties shall reach a written supplementary agreement through consultation.
2. Any dispute arising from the execution of the contract shall be settled through friendly negotiation. If negotiation fails, a lawsuit may be brought to the people's court where the project is located according to law.
3. This contract is made in duplicate (each containing 5 pages), and each party holds one copy, which has the same legal effect.
Party A:
Party B:
Date:
Simple and Effective Brick Sticking Contract 4 Party A:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, and following the principles of equality, voluntariness, honesty and credibility, both parties have reached the following agreement on matters related to the Agreement on Bricklaying of External Walls through consultation:
I. Project name:
Second, the scope of contracting:
Third, the contract form: no material contract.
Four. Duration: the duration is from year month day to year month day, and the duration is calendar days. For every day of delay in the construction period, claim RMB.
Verb (abbreviation of verb) settlement method: the final settlement shall be based on the actual brick area, with 28 yuan per square meter (28 yuan/square meter, including facing, chamfering, round joint, cleaning, edge mending, and vacancy filling until acceptance). Other tools and meals shall be provided by Party B. ..
6. Quality requirements: Acceptance shall be carried out according to the current national and local acceptance specifications for construction projects, and they are qualified.
Seven. Payment terms:
1. After it is completed in a large area and accepted by Party A and the supervisor, it shall be paid according to 90% of the actual quantities; Pay 95% of the actual engineering quantity after completion acceptance, and settle 5% deposit three months after completion. If there is a settlement date for alimony, it will be postponed.
2. If fines are imposed due to violation of production safety and regulations, all fines will be deducted from progress payment.
Eight. Rights and obligations of both parties:
1. After Party B's operators or staff enter the site, they must accept the three-level education and safety technical disclosure from the project department. Operators must abide by moral behavior and must not steal, rob, fight and other uncivilized behaviors. Party B is prohibited from assisting wanted criminals to carry out the construction site; In the process of construction, Party B shall strictly abide by the rules and regulations of production safety, and must understand the safety precautions, and shall not arbitrarily destroy the on-site safety protection measures. If any safety problems occur, Party B shall bear the responsibility alone, which has nothing to do with Party A. ..
2. Party B shall not delay the construction progress without reason and must meet the requirements of Party A's construction progress. Party A has the right to lodge a claim for failing to meet Party A's schedule requirements.
3. Party B shall do a good job in protecting the products that have not been laid or are being laid; We must do a good job in product protection such as anti-collision and anti-theft; Party B shall not waste the materials provided by Party A at will when paving exterior wall tiles, and offenders will be fined twice as much as the materials.
4. In the process of construction, arrange in strict accordance with the requirements of the project department and the construction specifications of each process. If it fails to accept the just requirements of the management, Party A has the right to terminate the agreement and leave by itself, and all the adverse consequences arising therefrom shall be borne by Party B..
5. Party B shall provide a fixed substitute on site. Failing to do so within the time limit, a fine of RMB 3,000 will be imposed.
9. Force Majeure: If one party fails to perform this contract as agreed due to force majeure, it may be exempted from liability in part or in whole according to the influence of force majeure, but it shall notify the other party in time and provide proof to the other party within five days from the end of force majeure.
X dispute settlement: any dispute arising under this contract shall be settled through negotiation between both parties or mediation by the administrative department. If negotiation or mediation fails, it shall be settled in the following (2) way (only one option can be selected).
(1) Bring a lawsuit to the people's court where the contract is signed;
(2) Apply to the arbitration commission in the place where the contract is signed for an award.
XI。 Other terms:
1. This contract shall come into effect as of the date of signature and seal by both parties. This contract has * * * pages in total and is made in duplicate, with each party holding one copy.
2. The annexes to this contract and various written documents formed during the performance of this contract, after being signed and confirmed by both parties, become an integral part of this contract and have the same legal effect as this contract. Unless otherwise specified, the sequence of interpretation shall be based on the time when the document was generated. For matters not covered in this contract, both parties can sign a supplementary agreement through consultation, which has the same legal effect as this contract.
Party A:
Party B:
Date:
Simple and Effective Brick Sticking Contract 5 Party A:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC), the construction contract signed by Party A and the owner and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, this contract is signed by both parties through consultation and earnestly performed.
First project
1. Project name: jianhu county Sun City 1# and 5# commercial and residential buildings.
2. Scope of subcontracted works: exterior wall decorative tiles (45x 145 small wall tiles and 600x600 large wall tiles).
Three. Duration of subcontracted works: 20xx starts on April 20th and is completed on May 15. Due to the delay of Party B's construction period, Party A has the right to increase the number of workers entering the site for construction, and the expenses incurred will be deducted from Party B's project payment, and 500 yuan will be fined for each day of delay.
Article 2 Contract Price and Settlement
1. The contract price of this project shall be settled according to the actual workload of veneering, and the edge of door and window frame shall be calculated according to the actual development area. The price of brick 45x 145 and 600x600 is 29 yuan and 33.50 yuan per square meter respectively.
2. Payment method: 65,438+05,000 yuan for the living expenses of each building is paid in advance after veneer, 60% of the total workload is paid after the project is withdrawn, and 95% of the total workload is paid after the main body is delivered and accepted. The remaining 5% will be paid as the quality guarantee within one year.
Article 3 Project Quality
Party A shall make technical disclosure and organize acceptance according to national quality acceptance specifications and evaluation standards, and Party B shall carefully organize construction according to construction requirements to ensure project quality. If the quality is unqualified, it must be reworked and repaired, and the materials and material losses shall be borne by Party B; If the quality of the project is poor and cannot be saved, Party B shall be responsible for compensating all the material losses.
Article 4 Safety in production
1. Party A shall make safety disclosure for the project undertaken by Party B, put forward clear safety requirements, and conduct supervision and inspection. Party B must conscientiously implement the rules and regulations for safe construction and strictly abide by the safety operation rules. The safety production facilities provided by Party A must be inspected before Party B can use them. In case of casualty accidents due to violation of the above regulations during construction, Party B shall be responsible for the losses.
2. In the process of construction, Party B shall be responsible for the fire accident caused by violation of fire laws and regulations.
Article 5 Life management
1. After Party B's workers enter the site, the accommodation problem shall be solved by Party B. Party A shall provide some underground garages for Party B's use, but Party B must ensure the hygiene and electricity safety, otherwise Party A has the right to take back the right to use the underground garages of Party B..
Article 6 Site management
1. The personnel of Party A and Party B shall strictly abide by the site management system and organize the construction under the unified leadership of the site leader of Party A.. The two sides cooperate closely in planning, progress and material supply to ensure the smooth progress of the construction.
2. Party B shall educate the construction personnel about obeying the law, safety in production and caring for property, and it is forbidden to steal materials from the site. If there is any illegal act in violation of the site management system, Party A has the right to take necessary measures, and Party B shall bear legal responsibilities and be responsible for compensating economic losses.
Article 7 Liability for breach of contract
1. The project subcontracted by Party B shall not be subcontracted again. In the process of construction, if the inspection does not meet the requirements of national acceptance standards and the quality of the project cannot be guaranteed, Party A has the right to terminate the contract and Party B shall compensate for the losses caused by rework.
Two, after the signing of the contract, without the consent of both parties, neither party shall arbitrarily change or terminate. If Party B unilaterally terminates the contract without Party A's consent, Party B shall compensate Party A for the economic losses caused by affecting the construction plan; If Party A terminates the contract midway, Party A shall compensate Party B for the economic losses caused thereby.
Article 8 Supplementary Provisions
1. In case of any dispute arising from this contract, both parties shall negotiate in time. If negotiation fails or negotiation fails, it may apply to the Economic Contract Arbitration Committee where the building is located for arbitration or bring a lawsuit to the local people's court.
2. This contract is made in duplicate, with each party holding one copy. This contract shall come into effect as of the date of signature by both parties, and shall become invalid after the project is completely completed and settled.
Party A:
Party B:
Date:
Simple and Effective Bricklaying Contract 6 Party A: _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party A)
Party B: _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party B)
In order to clarify the rights, obligations and economic responsibilities of both sides in the construction process and promote the cooperation between the two sides. Based on the principles of equality, voluntariness, fairness, honesty and credibility, both parties have entered into this agreement through friendly negotiation for mutual compliance.
I. Project address and name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. Project scope: Party B shall guarantee the construction period and quality (qualified) until the project is completed, and the engineering quantity shall be calculated according to the actual measurement.
Three. Party A is responsible for the on-site disclosure (drawings), arrangement and guidance of technicians, and providing all materials and water and electricity. Assist Party B's personnel to carry out the construction smoothly and avoid delaying the construction period. During the construction of Party B's workers, Party A shall provide accommodation for Party B's workers.
Four. Charge standard and agreed price: RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5. Duration of the project: this project starts from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Project price and settlement method of intransitive verbs: Party A shall pay 50 yuan living expenses in advance for each worker entering the site, and Party A shall pay 90% of the monthly progress for other projects.
Pay it to Party B, and the balance 10% shall be paid to Party B in one lump sum within 7 days after the completion of construction.
7. Party B is responsible for providing Party A with plans for the use of construction, labor and materials, and Party A shall cooperate and coordinate Party B's work until the completion.
Eight. The above agreement is made in duplicate, one for each party, and shall come into effect after being signed by both parties. Matters not covered shall be settled through consultation.
Party A: _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _
Date: _ _ _ _ _ _ _ _ _ _ _ _
7 Party A's (full name) simple and effective bricklaying contract:
Party B (full name):
Through negotiation between Party A and Party B, Party A subcontracted the outdoor ground brick laying service for the construction project of Zhangye Hall 3 to Party B for construction. In order to clarify the responsibilities, rights and interests of Party A and Party B, and ensure the quality, progress, safety and civilized production of the project, this contract is specially concluded for both parties to abide by and implement.
I. Overview of the Project
Project name: Zhangye No.3 Pavilion Construction Project
Scope of work: outdoor floor cushion, flower pond and peripheral wall masonry, floor brick and kerb construction period:
Second, the way of contracting and charging standards
1. Contract settlement method: Subcontract the construction to Party B as a dry contractor, and calculate the settlement according to the actual completed area on site.
2. Contract price:
Third, the project audit and payment
1. Every time Party B applies for progress payment, Party A shall pay Party B 80% of the completed project cost according to the actual brick laying progress. ..
2. After Party B's project is completed, Party A will pay 80% of the total project cost after the initial acceptance, 95% of the total project cost after the owner's acceptance, and the remaining 5% will be warranty money.
3. There is no advance payment for this project, and the progress payment is paid according to the image progress.
Fourth, the project warranty gold and warranty period
1. Project warranty: 5% of the total settlement price of the decoration project is used as the project quality warranty, which will be returned without interest after deducting relevant expenses during the warranty period.
2. Warranty period:
3. During the warranty period, if there are any engineering quality problems that need maintenance, be sure to be present for treatment within three days after receiving the maintenance notice; Otherwise, Party A has the right to entrust others to enter the site for maintenance, and the related maintenance expenses incurred shall be deducted from the warranty fund.
Verb (abbreviation for verb) The responsibilities and rights of both parties.
1. Party A is equipped with management personnel, who are responsible for the preparation of schedule and construction scheme, the supply and scheduling of materials and equipment, and the timely technical disclosure of construction safety.
2. Party A is responsible for providing Party B with the construction site and other convenient construction conditions.
3. Party B must set up a diligent and systematic management team with a sufficient number of skilled professional teams according to the construction tasks and technical requirements provided by Party A, and Party A has the right to ask Party B to dismiss or replace inappropriate workers and teams;
4. Party B's construction personnel shall meet the reasonable schedule of Party A;
5. Party B shall provide professional construction machinery and tools, including table saws, chainsaws, electric drills, hammers, wrenches, wood trowels, iron trowels and grey knives. Party B shall be responsible for the maintenance and replacement of tools.
6. Party B shall work overtime at night as required, and cooperate with various arrangements (safety, civilized construction, quality and progress) of the company's management personnel;
7. Party B has the obligation to cooperate with other teams in cross construction and provide them with working faces and other convenient construction conditions;
8. Party B shall consciously care for Party A's machinery, tools and other property at the construction site, and shall have the responsibility to protect the finished products, semi-finished products and other labor achievements of this team and other teams. In case of any damage, Party B shall be responsible for cleaning the site in time after completion;
9. Party B must obey the arrangement of Party A's management personnel in terms of safety, technology, progress, materials, labor force and civilized construction, so as to ensure that the site is cleared after the work, which meets the company's requirements for civilized production; If Party B refuses or ignores Party A's civilized construction requirements, Party A may arrange other workers to complete the work, and the expenses shall be borne by Party B.. ..
10. Party B shall use materials reasonably and economically during the construction period;
1 1. Party B shall be responsible for the expenses of illness, death or disability of Party B's workers during the construction period.
Six, time limit for a project, quality and safety in production
1. The construction period shall be issued by Party A to Party B according to the progress (to meet the requirements of Party A to speed up the work progress as required). If Party B's labor shortage, poor organization and other factors affect the construction period, Party A may impose economic penalties.
2. If Party B cannot increase the number of workers, Party A can contact other teams to enter the site for construction, and all expenses (including extra expenses) arising therefrom shall be borne by Party B. ..
3. Party B shall ensure that the project quality reaches the qualified standard. If Party B has quality problems in the construction process, Party A has the right to impose economic penalties in addition to rework and compensation for material losses without compensation. In case of major quality accidents, Party A has the right to terminate the contract and not settle the completed project quantity of Party B to compensate for the losses.
4. Party B must carry out model construction before starting any subdivisional work. If the sample construction fails to meet the quality standards (or the standards agreed in the contract), Party B shall not proceed with the next construction;
5. In the process of construction, Party B shall accept the inspection of Party A at any time, and if it finds that the construction quality does not meet the requirements, it shall be rectified in time;
6. Party B shall earnestly strengthen the management of production safety to ensure that the target requirements of Party A's responsibility for production safety are met; Otherwise, Party A has the right to punish according to relevant regulations. (For details, please refer to Safety Production Responsibility Management Objectives and Safety Production Responsibility Management Decomposition. )
Seven. additional remarks
In principle, the construction team should complete all the work within the scope of the team contract. If it is really necessary to complete the work of other teams outside the contract (instructed by Party A's on-site engineer), Party B has the obligation to remind Party A's on-site engineer to indicate which team's responsibility scope is completed when handling the workload list. If you have any questions, please consult Party A. ..
Eight. Matters not covered: Matters not covered in this contract shall be settled by both parties through consultation.
Nine. Number of copies of the contract: This contract is made in quadruplicate, one for each party, with the same legal effect. It will take effect after being signed by both parties, and will automatically become invalid after the project is completed and the settlement money is paid.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
;
- Previous article:What is a good travel guide website?
- Next article:How far is Jinsheng International Holiday Hotel in Dongcheng District from Dongbao Road?
- Related articles
- How to write the hotel management level?
- A man in Yinchuan released a false quarantine video. How will he be punished for publishing false isolated videos?
- Brief introduction of Sanming hotel
- Who is the ghost who fully accelerates the eighth stage?
- What is the telephone number of Pingxiang Longhua Yunjin Marketing Center?
- How to use the room button in Hanting Hotel?
- Guo Yi Hotel Sanya Dynasty Classic Performing Arts Center
- The shortest bus route from Shunyi Vehicle Management Office to Crowne Plaza Shunyi Airport.
- The location of Shenzhen Huashang Times Apartment Store is inconvenient. Will it be a little biased? Is everyone allowed to come in and out at will?
- Is Zhejiang Huzhou Xinhua Xiajichao Automobile Chain Co., Ltd. a liar?